State, local and federal policy
In effect policy actions
Recorded policy actions with status In effect.
In effect means the recorded instrument had started and had not expired, been repealed or been blocked as of the dataset date. It does not mean every project in the state has stopped.
Filter (status, type)
More national filters: authority and jurisdiction
| Scope | Authority | Jurisdiction | Action | Status | Stage | Effective | Timing | Record |
|---|---|---|---|---|---|---|---|---|
| Alabama Power service territory, Alabama Alabama | Alabama Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | 19 October 2026 | Not stored as one date — see completion condition | Alabama PSC Docket 33709: review procedures for Alabama Power's large data center contracts Primary source |
| City of Cleveland, Ohio Ohio | Cleveland City Council Local government | Local | Local construction moratorium | In effect | Permitting | 19 October 2026 | Scheduled 29 January 2027 | Cleveland: standalone data center permit pause extended to 29 January 2027 (Emergency Ordinance 1246-2026) Primary source |
| City of Milwaukee, Wisconsin Wisconsin | Milwaukee Common Council Local government | Local | Enacted legislation or regulation | In effect | Permitting | 17 October 2026 | No expiration date recorded | Milwaukee: temporary data-center pause effective 17 October 2026 (File 251924) Primary source |
| Unincorporated Johnson County, Iowa Iowa | Johnson County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 15 October 2026 | Scheduled 8 August 2027 | Johnson County: data-center approval pause extended to 8 August 2027 Primary source |
| PJM region (multistate) 14 jurisdictions listed, 14 only in part · Covered jurisdictions | Federal Energy Regulatory Commission Regulator or commission | Regional grid | Reporting or resource-use requirement | In effect | Reporting | 12 October 2026 | No expiration date recorded | PJM: Large Load definition and registry accepted by FERC; capacity and curtailment rules rejected (ER26-3515) Primary source |
| Joyfield Township, Michigan Michigan | Joyfield Township Board Local government | Local | Local construction moratorium | In effect | More than one stage | 7 October 2026 | Not stored as one date — see completion condition | Joyfield Township: 12-month moratorium on data center and crypto mining approvals (Resolution 2026-07) Primary source |
| Unincorporated Mendocino County, California California | Mendocino County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 6 October 2026 | Scheduled 21 August 2028 | Mendocino County (unincorporated): extension of data center moratorium to 21 August 2028 (Ordinance No. 4562) Primary source |
| City of Oakland, California California | Oakland City Council Local government | Local | Enacted legislation or regulation | In effect | Permitting | 6 October 2026 | No expiration date recorded | Oakland: interim data-center moratorium effective 6 October 2026 (27-0050) Primary source |
| Maryland Maryland | Governor of Maryland Executive | State | Enacted legislation or regulation | In effect | More than one stage | 23 September 2026 | Not stored as one date — see completion condition | Executive Order 01.01.2026.16: data center framework and task force Primary source |
| Unincorporated Pima County, Arizona Arizona | Pima County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | 22 September 2026 | Not stored as one date — see completion condition | Pima County (unincorporated): data center development moratorium (Resolution 2026-56) Primary source |
| Texas Texas | Governor of Texas Executive | State | Statewide permit or approval pause | In effect | Permitting | 21 September 2026 | Not stored as one date — see completion condition | TCEQ data-center permit pause Primary source |
| Virginia Virginia | Governor of Virginia Executive | State | Enacted legislation or regulation | In effect | More than one stage | 18 September 2026 | Not stored as one date — see completion condition | Executive Order 22: Virginia Data Center Accountability Framework Primary source |
| City of St. Louis, Missouri Missouri | Board of Aldermen of the City of St. Louis Local government | Local | Enacted legislation or regulation | In effect | Permitting | 17 September 2026 | Not stored as one date — see completion condition | St. Louis: data center zoning regulations (Ordinance 72181) Primary source |
| City of St. Louis, Missouri Missouri | Board of Aldermen of the City of St. Louis Local government | Local | Permanent restriction or prohibition | In effect | Incentive | 17 September 2026 | Not stored as one date — see completion condition | St. Louis: no city tax incentives for data centers (Ordinance 72182) Primary source |
| Nevada Nevada | Governor of Nevada Executive | State | Enacted legislation or regulation | In effect | Incentive | 17 September 2026 | Not stored as one date — see completion condition | Minimum terms for data center tax abatement applications Primary source |
| ERCOT region, Texas Texas | Electric Reliability Council of Texas Grid operator | Regional grid | Reporting or resource-use requirement | In effect | Reporting | 14 September 2026 | Not stored as one date — see completion condition | ERCOT data center state and community impact information request Primary source |
| Texas Texas | Governor of Texas Executive | State | Reporting or resource-use requirement | In effect | Reporting | 14 September 2026 | Not stored as one date — see completion condition | Water-use reporting enforcement directive Primary source |
| Virginia Virginia | State Water Control Board (Virginia Department of Environmental Quality) Government agency | State | Reporting or resource-use requirement | In effect | Reporting | 9 September 2026 | Not stored as one date — see completion condition | Water withdrawal reports must show water supplied to data centers (9VAC25-200-40) Primary source |
| Unincorporated Lake County, Illinois Illinois | Lake County Board Local government | Local | Local construction moratorium | In effect | More than one stage | 8 September 2026 | Scheduled 11 May 2027 | Lake County (unincorporated areas): temporary moratorium on data centers Primary source |
| Unincorporated Mendocino County, California California | Mendocino County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 1 September 2026 | Not stored as one date — see completion condition | Mendocino County (unincorporated): data center moratorium imposed 1 September 2026 (Ordinance No. 4561) Primary source |
| AEP Ohio (Ohio Power Company) service territory, Ohio Ohio | Ohio Power Company (AEP Ohio) Utility | Utility territory | Enacted legislation or regulation | In effect | More than one stage | Several dates apply; see the source | Not stored as one date — see completion condition | AEP Ohio Schedule DCT data center tariff sheets Primary source |
| AEP Ohio service territory, Ohio Ohio | Public Utilities Commission of Ohio Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | 28 August 2026 | Not stored as one date — see completion condition | PUCO interim SSO rules for AEP Ohio data center customers Primary source |
| New Jersey New Jersey | New Jersey Legislature Legislature | State | Reporting or resource-use requirement | In effect | Reporting | 27 August 2026 | Not stored as one date — see completion condition | Semi-annual data center water and energy reports to the BPU Primary source |
| New Jersey New Jersey | New Jersey Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 27 August 2026 | Not stored as one date — see completion condition | End Data Center Tax Credits Act cuts Next New Jersey credits Primary source |
| Town of Brookhaven, New York New York | Brookhaven Town Board Local government | Local | Local construction moratorium | In effect | More than one stage | 27 August 2026 | Scheduled 31 December 2027 | Town of Brookhaven: data center moratorium through 31 December 2027 (Local Law No. 12-2026) Primary source |
| Unincorporated Pierce County, Washington Washington | Pierce County Council Local government | Local | Local construction moratorium | In effect | Permitting | 27 August 2026 | Not stored as one date — see completion condition | Pierce County: one-year pause on permits for data centers over 10 MW in unincorporated areas (Ord. O2026-557) Primary source |
| Delaware Delaware | Delaware General Assembly Legislature | State | Enacted legislation or regulation | In effect | More than one stage | 26 August 2026 | No expiration date recorded | Large energy use facility rate class and service agreements (85 Del. Laws c. 440) Primary source |
| Delaware Delaware | Delaware General Assembly Legislature | State | Enacted legislation or regulation | In effect | Permitting | 26 August 2026 | No expiration date recorded | Public bodies barred from data center nondisclosure agreements (85 Del. Laws c. 447) Primary source |
| Big Rivers Electric Corporation and Kenergy Corp. service to the Hawesville data center campus, Hancock County, Kentucky Kentucky | Kentucky Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | Big Rivers/Kenergy service agreement for the TeraWulf Hawesville data center approved Primary source |
| ERCOT region in Texas Texas | Electric Reliability Council of Texas Grid operator | Regional grid | Grid-interconnection pause | In effect | Interconnection | Several dates apply; see the source | Not stored as one date — see completion condition | ERCOT large-load interconnection pause Primary source |
| ERCOT power region, Texas Texas | Public Utility Commission of Texas Regulator or commission | State | Enacted legislation or regulation | In effect | Interconnection | 20 August 2026 | Not stored as one date — see completion condition | Order letting ERCOT delay Batch Zero classification during the data-center audit Primary source |
| Pennsylvania Pennsylvania | Pennsylvania Department of Revenue Government agency | State | Enacted legislation or regulation | In effect | Incentive | 18 August 2026 | No expiration date recorded | Revenue program guidelines add GRID consent-order condition Primary source |
| Pennsylvania Pennsylvania | Governor of Pennsylvania Executive | State | Enacted legislation or regulation | In effect | More than one stage | 18 August 2026 | Not stored as one date — see completion condition | Executive Order 2026-05 data center permitting and incentive conditions Primary source |
| Louisville/Jefferson County Metro, Kentucky Kentucky | Louisville/Jefferson County Metro Council Local government | Local | Local construction moratorium | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Louisville/Jefferson County Metro: temporary data center and telecommunications hotel moratorium Primary source |
| Nance County, Nebraska Nebraska | Nance County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 11 August 2026 | Not stored as one date — see completion condition | Nance County: moratorium on data center construction and permits (Resolution #26-13) Primary source |
| Fort Worth, Texas Texas | City of Fort Worth Local government | Local | Reporting or resource-use requirement | In effect | Construction | 11 August 2026 | Not stored as one date — see completion condition | Fort Worth: water and wastewater criteria for data centers Primary source |
| Kentucky Kentucky | Governor of Kentucky Executive | State | Reporting or resource-use requirement | In effect | More than one stage | 6 August 2026 | Not stored as one date — see completion condition | Executive Order 2026-494: data center commitments Primary source · Archived copy (25 September 2026) |
| Lucas County, Iowa Iowa | Lucas County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 5 August 2026 | Not stored as one date — see completion condition | Lucas County: one-year moratorium on data center permitting and construction (5 August 2026 resolution) Primary source |
| Texas Texas | Governor of Texas Executive | State | Statewide permit or approval pause | In effect | Interconnection | 3 August 2026 | Not stored as one date — see completion condition | ERCOT approval pause pending audit Primary source |
| Tukwila, Washington Washington | Tukwila City Council Local government | Local | Local construction moratorium | In effect | Permitting | 3 August 2026 | Scheduled 3 August 2027 | Tukwila: one-year moratorium on applications for data centers over 20 MVA (Ordinance 2795) Primary source |
| ERCOT region, Texas Texas | Electric Reliability Council of Texas Grid operator | Regional grid | Enacted legislation or regulation | In effect | Operation | 1 August 2026 | Not stored as one date — see completion condition | ERCOT ride-through requirements for large computational loads (NOGRR 282) Primary source |
| ERCOT region, Texas Texas | Electric Reliability Council of Texas Grid operator | Regional grid | Enacted legislation or regulation | In effect | Interconnection | 1 August 2026 | Not stored as one date — see completion condition | ERCOT definition of Large Computational Load (NPRR 1308) Primary source |
| Iowa County, Iowa Iowa | Iowa County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 31 July 2026 | Scheduled 31 July 2027 | Iowa County: 12-month moratorium on data center development applications (Resolution 2026-07-31) Primary source |
| Nashville and Davidson County, Tennessee Tennessee | Metropolitan Council of Nashville and Davidson County Local government | Local | Enacted legislation or regulation | In effect | Permitting | 31 July 2026 | No expiration date recorded | Nashville and Davidson County (Metropolitan Government): zoning code data center use categories and conditions (BL2026-1391) Primary source |
| Unincorporated Bannock County, Idaho Idaho | Bannock County Board of County Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 30 July 2026 | Scheduled 26 January 2027 | Bannock County: 180-day data center application moratorium Primary source |
| Maine Maine | Maine Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 29 July 2026 | Not stored as one date — see completion condition | Data centers excluded from business equipment exemption and Dirigo incentives Primary source |
| Hillsboro, Oregon Oregon | Hillsboro City Council Local government | Local | Local construction moratorium | In effect | Permitting | 27 July 2026 | Scheduled 24 November 2026 | Hillsboro: 120-day pause on new data center land use applications Primary source · Archived copy (20 September 2026) |
| Seattle, Washington Washington | Seattle City Council Local government | Local | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | Seattle: new large data center loads served only by contract Primary source |
| Nebraska Nebraska | Governor of Nebraska Executive | State | Enacted legislation or regulation | In effect | More than one stage | Effective date not stated in the source | Not stored as one date — see completion condition | Executive order on state incentives and a data center task force Primary source |
| City of Cleveland, Ohio Ohio | Cleveland City Council Local government | Local | Local construction moratorium | In effect | Permitting | 20 July 2026 | Not stored as one date — see completion condition | Cleveland: temporary moratorium on data center permits (Ord. 556-2026) Primary source |
| Nebraska Nebraska | Nebraska Legislature Legislature | State | Reporting or resource-use requirement | In effect | More than one stage | 18 July 2026 | Not stored as one date — see completion condition | Data center cost recovery and annual reporting duties Primary source |
| Fillmore County, Nebraska Nebraska | Fillmore County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | 14 July 2026 | Scheduled 14 July 2028 | Fillmore County: 24-month moratorium on new data center applications (Resolution 2026-10) Primary source |
| New York New York | Governor of New York Executive | State | Statewide permit or approval pause | In effect | Permitting | 14 July 2026 | Not stored as one date — see completion condition | DEC hold on large data-center permits Primary source |
| Vermont Vermont | Vermont Department of Public Service Government agency | State | Enacted legislation or regulation | In effect | Construction | 14 July 2026 | Not stored as one date — see completion condition | Commercial energy-code requirements for data center rooms Primary source |
| Pennsylvania Pennsylvania | Pennsylvania General Assembly Legislature | State | Reporting or resource-use requirement | In effect | Reporting | 12 July 2026 | Not stored as one date — see completion condition | Annual data center energy and water reporting Primary source |
| Portland General Electric service territory in Oregon Oregon | Oregon Public Utility Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Interconnection | Several dates apply; see the source | Not stored as one date — see completion condition | PGE large-load tariff compliance approval Primary source |
| Santa Fe County, New Mexico New Mexico | Santa Fe County Board of County Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 9 July 2026 | Scheduled 9 January 2028 | Santa Fe County: 18-month data center development-approval moratorium Primary source |
| Portland General Electric service territory, Oregon Oregon | Portland General Electric Company Utility | Utility territory | Enacted legislation or regulation | In effect | Operation | 8 July 2026 | Not stored as one date — see completion condition | PGE Schedule 496 Data Center Cost-of-Service Opt-Out (20,000 kW and above) Primary source |
| Portland General Electric service territory, Oregon Oregon | Portland General Electric Company Utility | Utility territory | Enacted legislation or regulation | In effect | Operation | 8 July 2026 | Not stored as one date — see completion condition | PGE Schedule 596 Data Center Direct Access Service (20,000 kW and above) Primary source |
| Portland General Electric service territory, Oregon Oregon | Portland General Electric Company Utility | Utility territory | Enacted legislation or regulation | In effect | Operation | 8 July 2026 | Not stored as one date — see completion condition | PGE Schedule 96 Data Center Standard Service (20,000 kW and above) Primary source |
| Unincorporated DeKalb County, Georgia Georgia | DeKalb County Board of Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 7 July 2026 | Scheduled 30 March 2027 | DeKalb County (unincorporated): data center application moratorium extended to 30 March 2027 Primary source |
| Prince George's County, Maryland Maryland | Prince George's County Council Local government | Local | Local construction moratorium | In effect | Permitting | 7 July 2026 | Not stored as one date — see completion condition | Prince George's County: two-year pause on data center subdivision and site plans (CR-066-2026) Primary source |
| North Carolina North Carolina | North Carolina General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 7 July 2026 | Not stored as one date — see completion condition | S.L. 2026-41 s. 44.4 repeals datacenter electricity exemptions Primary source |
| North Carolina North Carolina | North Carolina General Assembly Legislature | State | Reporting or resource-use requirement | In effect | Reporting | 7 July 2026 | Not stored as one date — see completion condition | Quarterly datacenter electricity-tax reporting (S.L. 2026-42) Primary source |
| New Jersey New Jersey | New Jersey Legislature Legislature | State | Enacted legislation or regulation | In effect | Operation | 7 July 2026 | Not stored as one date — see completion condition | Large data center electric service standards required of the BPU Primary source |
| Arizona Arizona | Arizona Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 July 2026 | Scheduled 30 June 2029 | Pause on new data-center tax-relief applications Primary source |
| Florida Florida | Florida Legislature Legislature | State | Enacted legislation or regulation | In effect | More than one stage | 1 July 2026 | Not stored as one date — see completion condition | SB 484 (2026): large load tariffs and large-scale data center water permits (ch. 2026-65) Primary source |
| Idaho Idaho | Idaho Legislature Legislature | State | Reporting or resource-use requirement | In effect | Operation | 1 July 2026 | Not stored as one date — see completion condition | Cooling-water limit for new data centers (Idaho Code 42-252) Primary source |
| Illinois Illinois | Governor of Illinois (directive carried out by the Illinois Department of Commerce and Economic Opportunity) Executive | State | Statewide permit or approval pause | In effect | Incentive | 1 July 2026 | Not stored as one date — see completion condition | Stop in processing data center incentive applications Primary source |
| Indiana Indiana | Indiana General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 July 2026 | Not stored as one date — see completion condition | HEA 1210 (2026): local payment condition on new data center sales tax certificates Primary source · Archived copy (18 March 2026) |
| Nebraska Nebraska | Nebraska Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 July 2026 | Not stored as one date — see completion condition | LB 901 (2026) repeal of the data center sales tax exemption Primary source |
| Oklahoma Oklahoma | Oklahoma Legislature Legislature | State | Enacted legislation or regulation | In effect | More than one stage | 1 July 2026 | Not stored as one date — see completion condition | Data Center Customer Ratepayer Protection Act of 2026 (HB 2992) Primary source · Archived copy (2 September 2026) |
| PPL Electric Utilities service territory, Pennsylvania Pennsylvania | PPL Electric Utilities Corporation (tariff filed with the Pennsylvania Public Utility Commission) Utility | Utility territory | Enacted legislation or regulation | In effect | Interconnection | 1 July 2026 | Not stored as one date — see completion condition | PPL Rate Schedule LP-6 for large load (data center) interconnections Primary source |
| South Dakota South Dakota | South Dakota Legislature Legislature | State | Enacted legislation or regulation | In effect | Operation | 1 July 2026 | Not stored as one date — see completion condition | PUC may charge data centers for reviewing service agreements Primary source |
| South Dakota South Dakota | South Dakota Legislature Legislature | State | Enacted legislation or regulation | In effect | More than one stage | 1 July 2026 | Not stored as one date — see completion condition | Separate electric service terms and water reporting for data centers Primary source |
| Southwest Power Pool region (multistate) 17 jurisdictions listed, 17 only in part · Covered jurisdictions | Federal Energy Regulatory Commission Regulator or commission | Regional grid | Enacted legislation or regulation | In effect | Interconnection | 1 July 2026 | No expiration date recorded | Southwest Power Pool: Conditional High Impact Large Load Service accepted by FERC (ER26-1323) Primary source |
| Logan, Utah Utah | Logan Municipal Council Local government | Local | Local construction moratorium | In effect | Construction | 1 July 2026 | Not stored as one date — see completion condition | Logan: temporary land use regulation prohibiting data center development (Ord. 26-12) Primary source |
| Virginia Virginia | Virginia General Assembly Legislature | State | Enacted legislation or regulation | In effect | Operation | 1 July 2026 | Not stored as one date — see completion condition | Data Center Electricity Consumption Tax (2026 Special Session I budget, Item 3-5.24) Primary source |
| Virginia Virginia | Virginia General Assembly Legislature | State | Enacted legislation or regulation | In effect | Permitting | 1 July 2026 | Not stored as one date — see completion condition | Data center air permits: Tier 4 equivalent generator emission limits (Va. Code 10.1-1322.6) Primary source |
| Dominion Energy Virginia service territory, Virginia Virginia | Virginia Electric and Power Company (Dominion Energy Virginia) Utility | Utility territory | Enacted legislation or regulation | In effect | Operation | 1 July 2026 | Scheduled 30 June 2028 | Dominion tariff sheet collecting the Data Center Electricity Consumption Tax Primary source |
| Washington Washington | Washington State Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 July 2026 | Not stored as one date — see completion condition | Replacement-equipment exemption removed Primary source |
| Frederick County, Maryland Maryland | Supreme Court of Maryland Court | Local | Enacted legislation or regulation | In effect | Permitting | 30 June 2026 | Not stored as one date — see completion condition | Frederick County: frederick data center zoning ordinance not subject to referendum Primary source |
| Louisiana Louisiana | Governor of Louisiana Executive | State | Reporting or resource-use requirement | In effect | Incentive | 25 June 2026 | Not stored as one date — see completion condition | Executive Order JML 26-058: ratepayer and community protection conditions for data center incentives Primary source |
| Hillsdale Township, Michigan Michigan | Hillsdale Township Board of Trustees Local government | Local | Local construction moratorium | In effect | Permitting | 24 June 2026 | Not stored as one date — see completion condition | Hillsdale Township: one-year moratorium on data center applications (Ordinance No. 2026-06-01) Primary source |
| Municipality of Anchorage, Alaska Alaska | Municipality of Anchorage Local government | Local | Enacted legislation or regulation | In effect | Permitting | Effective date not stated in the source | No expiration date recorded | Anchorage: title 21 data center use standards Primary source |
| Woodbury County, Iowa Iowa | Woodbury County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 23 June 2026 | Scheduled 23 June 2027 | Woodbury County: 12-month moratorium on data center development applications (Resolution 14064) Primary source |
| Borough of Roselle Park, New Jersey New Jersey | Roselle Park Borough Council Local government | Local | Permanent restriction or prohibition | In effect | More than one stage | 19 June 2026 | Not stored as one date — see completion condition | Roselle Park: data centers prohibited in all zone districts (Ordinance No. 2860) Primary source |
| NIPSCO electric service territory, Indiana Indiana | Indiana Utility Regulatory Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | 17 June 2026 | Not stored as one date — see completion condition | IURC Cause 46322: NIPSCO special contract for Amazon data centers Primary source |
| Coweta County, Georgia Georgia | Coweta County Board of Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 16 June 2026 | Scheduled 13 December 2026 | Coweta County: 180-day pause on new data center applications Primary source |
| Illinois Illinois | Illinois General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Data Center Investment program tax exemptions and credits Primary source |
| Illinois Illinois | Illinois General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 16 June 2026 | Not stored as one date — see completion condition | Public Act 104-0468 amendment to the data center investment section Primary source |
| Adams County, Iowa Iowa | Adams County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 15 June 2026 | Scheduled 15 June 2028 | Adams County: 24-month moratorium on data center permits and approvals (Resolution 2026-25) Primary source |
| Seattle, Washington Washington | Seattle City Council Local government | Local | Local construction moratorium | In effect | Permitting | 11 June 2026 | Scheduled 11 June 2027 | Seattle: one-year emergency pause on data center applications Primary source |
| Texas Texas | Governor of Texas Executive | State | Reporting or resource-use requirement | In effect | More than one stage | 10 June 2026 | Not stored as one date — see completion condition | Directive on data-center infrastructure costs Primary source |
| Lexington-Fayette Urban County, Kentucky Kentucky | Lexington-Fayette Urban County Council Local government | Local | Local construction moratorium | In effect | More than one stage | 9 June 2026 | Scheduled 31 October 2027 | Lexington-Fayette Urban County: data center zoning and permit pause extended to 31 October 2027 Primary source |
| Lexington-Fayette Urban County, Kentucky Kentucky | Lexington-Fayette Urban County Council Local government | Local | Enacted legislation or regulation | In effect | Permitting | 9 June 2026 | No expiration date recorded | Lexington-Fayette Urban County: Resolution R-236-2026 initiating data center zoning amendments Primary source |
| City of Millville, New Jersey New Jersey | Millville Board of Commissioners Local government | Local | Permanent restriction or prohibition | In effect | More than one stage | 9 June 2026 | Not stored as one date — see completion condition | Millville: data centers added to uses prohibited in all districts (Ordinance No. 48-2026) Primary source |
| Mason Township, Cass County, Michigan Michigan | Mason Township Board of Trustees Local government | Local | Local construction moratorium | In effect | Permitting | 8 June 2026 | Scheduled 8 June 2027 | Mason Township (Cass County): 12-month moratorium on data center applications (Ordinance No. 2026-01) Primary source |
| Charlotte and its extraterritorial jurisdiction, North Carolina North Carolina | Charlotte City Council Local government | Local | Local construction moratorium | In effect | Permitting | 8 June 2026 | Scheduled 18 October 2027 | Charlotte: data center application moratorium with an approved extension Primary source |
| Oregon Oregon | Oregon Legislative Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 5 June 2026 | Not stored as one date — see completion condition | Enterprise-zone limits for data centers Primary source |
| Unincorporated Boulder County, Colorado Colorado | Boulder County Board of County Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 2 June 2026 | Scheduled 2 December 2026 | Boulder County: six-month pause on data center and detention center planning applications Primary source |
| Alabama Alabama | Alabama Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 June 2026 | Not stored as one date — see completion condition | Limits on data processing center tax abatements (Act 2026-573) Primary source · Archived copy (18 May 2026) |
| Illinois Illinois | Illinois General Assembly Legislature | State | Enacted legislation or regulation | In effect | Permitting | 1 June 2026 | Not stored as one date — see completion condition | Emission standards for data center backup generator permits Primary source |
| Utah Utah | Governor of Utah Executive | State | Enacted legislation or regulation | In effect | More than one stage | 29 May 2026 | Not stored as one date — see completion condition | Executive Order 2026-03: data center framework for state agencies Primary source |
| Lyndon Township, Michigan Michigan | Lyndon Township Board Local government | Local | Local construction moratorium | In effect | Permitting | 27 May 2026 | Not stored as one date — see completion condition | Lyndon Township: 12-month pause on data center permits and approvals (Resolution 26-06) Primary source |
| Ohio Ohio | Governor of Ohio Executive | State | Statewide permit or approval pause | In effect | Incentive | 27 May 2026 | Not stored as one date — see completion condition | Pause on new data-center exemption requests Primary source · Archived copy (1 September 2026) |
| Denver, Colorado Colorado | Denver City Council Local government | Local | Local construction moratorium | In effect | Permitting | 21 May 2026 | Scheduled 21 May 2027 | Denver: one-year pause on data center zoning permits and site plans Primary source |
| South Carolina South Carolina | South Carolina General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 19 May 2026 | Not stored as one date — see completion condition | Act 242 (2026): data centers excluded from new provider tax exemption Primary source |
| San Angelo, Texas Texas | San Angelo City Council Local government | Local | Enacted legislation or regulation | In effect | Permitting | 19 May 2026 | Not stored as one date — see completion condition | San Angelo: zoning standards for data centers (Sec. 430) Primary source |
| Chesaning Township, Michigan Michigan | Chesaning Township Board of Trustees Local government | Local | Local construction moratorium | In effect | More than one stage | 18 May 2026 | Scheduled 18 May 2027 | Chesaning Township: 12-month data center moratorium (Ordinance No. 26-001) Primary source |
| Elko New Market, Minnesota Minnesota | Elko New Market City Council Local government | Local | Local construction moratorium | In effect | More than one stage | 14 May 2026 | Scheduled 13 May 2027 | Elko New Market: data center moratorium until 13 May 2027 (Interim Ordinance No. 345) Primary source |
| Brewer, Maine Maine | Brewer City Council Local government | Local | Permanent restriction or prohibition | In effect | More than one stage | Effective date not stated in the source | Not stored as one date — see completion condition | Brewer: tiered data center standards; 20 MW and over prohibited Primary source |
| Portland General Electric service territory in Oregon Oregon | Oregon Public Utility Commission Regulator or commission | State | Enacted legislation or regulation | In effect | More than one stage | 7 May 2026 | Not stored as one date — see completion condition | PGE data-center cost-allocation order Primary source |
| Utah Utah | Utah Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 6 May 2026 | Not stored as one date — see completion condition | Local incentives for large load data centers barred from May 2027 Primary source |
| Utah Utah | Utah Legislature Legislature | State | Reporting or resource-use requirement | In effect | Reporting | 6 May 2026 | Not stored as one date — see completion condition | Water-use reporting for new large data centers (H.B. 76) Primary source |
| Audubon County, Iowa Iowa | Audubon County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | 5 May 2026 | Scheduled 1 May 2027 | Audubon County: moratorium on commercial data center applications until 1 May 2027 (Resolution 2026-27) Primary source |
| Town of Smithfield, Rhode Island Rhode Island | Smithfield Town Council Local government | Local | Permanent restriction or prohibition | In effect | Permitting | Effective date not stated in the source | No expiration date recorded | Smithfield: zoning amendment listing data centers as not permitted Primary source |
| Dickey County, North Dakota North Dakota | Dickey County Board of County Commissioners Local government | Local | Enacted legislation or regulation | In effect | More than one stage | 21 April 2026 | Not stored as one date — see completion condition | Dickey County: zoning standards for data centers Primary source |
| Oklahoma City, Oklahoma Oklahoma | Oklahoma City Council Local government | Local | Local construction moratorium | In effect | More than one stage | 21 April 2026 | Scheduled 31 December 2026 | Oklahoma City: data center rezoning and permit moratorium to 31 December 2026 (emergency ordinance) Primary source |
| Luna Pier, Michigan Michigan | Luna Pier City Council Local government | Local | Local construction moratorium | In effect | Permitting | 11 April 2026 | Scheduled 11 April 2027 | Luna Pier: one-year moratorium on data center applications (Ordinance No. 251) Primary source |
| West Virginia West Virginia | West Virginia Department of Commerce (Department of Economic Development) Government agency | State | Enacted legislation or regulation | In effect | Permitting | 1 April 2026 | Scheduled 1 August 2031 | 145 CSR 20: certification rule for microgrid districts and high impact data centers Primary source |
| DTE Electric service territory, Michigan Michigan | Michigan Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | No expiration date recorded | MPSC Case U-21990: rehearing and reopening of Saline data center contracts denied Primary source |
| Pacific Gas and Electric service territory, California California | California Public Utilities Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Interconnection | 19 March 2026 | Not stored as one date — see completion condition | CPUC Resolution E-5433: PG&E transmission energization agreement for a Menlo Equities data center Primary source |
| Erie Township, Michigan Michigan | Erie Township Board Local government | Local | Local construction moratorium | In effect | Permitting | 16 March 2026 | Not stored as one date — see completion condition | Erie Township: one-year moratorium on data center applications (Ordinance No. 132) Primary source |
| West Virginia West Virginia | West Virginia Legislature Legislature | State | Enacted legislation or regulation | In effect | More than one stage | 13 March 2026 | Not stored as one date — see completion condition | HB 4983 (2026) authorizes the 145 CSR 20 certification rule Primary source |
| Consumers Energy electric service territory, Michigan Michigan | Michigan Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | More than one stage | Effective date not stated in the source | No expiration date recorded | MPSC Case U-21859: rehearing of Consumers Energy large load terms denied Primary source |
| Monclova Township, Ohio Ohio | Monclova Township Board of Trustees Local government | Local | Local construction moratorium | In effect | More than one stage | 17 February 2026 | Scheduled 17 February 2027 | Monclova Township: 12-month pause on data center applications and approvals (Resolution 02172026-01) Primary source |
| Unincorporated Chatham County, North Carolina North Carolina | Chatham County Board of Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 11 February 2026 | Scheduled 11 February 2027 | Chatham County: 12-month pause on data center and cryptocurrency mining permitting (File 26-0061) Primary source |
| Pacific Gas and Electric service territory, California California | California Public Utilities Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Interconnection | 15 January 2026 | Not stored as one date — see completion condition | CPUC Resolution E-5439: PG&E transmission energization agreement for a Microsoft data center Primary source |
| Southwest Power Pool region (multistate) 17 jurisdictions listed, 17 only in part · Covered jurisdictions | Federal Energy Regulatory Commission Regulator or commission | Regional grid | Enacted legislation or regulation | In effect | Interconnection | 15 January 2026 | No expiration date recorded | Southwest Power Pool: High Impact Large Load study processes accepted by FERC (ER26-247) Primary source |
| Mississippi Mississippi | Mississippi Department of Revenue Government agency | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Data Center Enterprises tax exemptions (Department of Revenue description) Primary source |
| California California | California Legislature Legislature | State | Enacted legislation or regulation | In effect | Operation | 1 January 2026 | Scheduled 1 January 2031 | Commission assessment of data center cost shifts Primary source · Reviewed alternate official source (23 September 2026) |
| Indiana Indiana | Indiana General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 January 2026 | Not stored as one date — see completion condition | HEA 1601 (2025): data center exemption chapter extended to quantum and advanced computing networks Primary source · Archived copy (8 April 2026) |
| Derry, New Hampshire New Hampshire | Derry Town Council Local government | Local | Enacted legislation or regulation | In effect | Permitting | 19 December 2025 | Not stored as one date — see completion condition | Derry: definition of a data center or information-processing facility Primary source |
| DTE Electric service territory, Michigan Michigan | Michigan Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | MPSC Case U-21990: DTE special contracts for the Saline Township data center Primary source |
| Breckinridge County, Kentucky Kentucky | Breckinridge County Fiscal Court Local government | Local | Local construction moratorium | In effect | More than one stage | Effective date not stated in the source | Not stored as one date — see completion condition | Breckinridge County: 365-day pause on data centers Primary source |
| Evergy Missouri Metro and Evergy Missouri West service territories, Missouri Missouri | Missouri Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | 13 December 2025 | Not stored as one date — see completion condition | Missouri PSC approval of Evergy large load power service plan Primary source · Archived copy (4 October 2026) |
| Consumers Energy electric service territory, Michigan Michigan | Michigan Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | More than one stage | Effective date not stated in the source | Not stored as one date — see completion condition | MPSC Case U-21859: Consumers Energy Rate GPD large load terms Primary source |
| Pacific Gas and Electric service territory, California California | California Public Utilities Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Interconnection | 30 October 2025 | Not stored as one date — see completion condition | CPUC Resolution E-5420: PG&E transmission energization agreement for a STACK Infrastructure data center Primary source |
| East Kentucky Power Cooperative owner-member service territories, Kentucky Kentucky | Kentucky Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | 30 October 2025 | Not stored as one date — see completion condition | EKPC Data Center Power Tariff (Rate DCP) approved Primary source |
| Ohio Ohio | Ohio General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Data center equipment sales-tax exemption Primary source |
| Doña Ana County, New Mexico New Mexico | Doña Ana County Board of County Commissioners Local government | Local | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | No expiration date recorded | Doña Ana County: Project Jupiter industrial revenue bond authorization Primary source |
| Delmarva Power & Light Company service territory, Delaware Delaware | Delaware Public Service Commission Regulator or commission | State | Grid-interconnection pause | In effect | Interconnection | 3 September 2025 | Not stored as one date — see completion condition | Delmarva interconnection pause for prospective loads of 25 MW or more Primary source |
| AEP Ohio service territory, Ohio Ohio | Public Utilities Commission of Ohio Regulator or commission | State | Enacted legislation or regulation | In effect | More than one stage | Effective date not stated in the source | Not stored as one date — see completion condition | PUCO denial of rehearing on the AEP Ohio data center tariff Primary source |
| Entergy Louisiana service territory, Louisiana Louisiana | Louisiana Public Service Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | 29 August 2025 | Not stored as one date — see completion condition | LPSC Order U-37425: Entergy resources for a Richland Parish data center Primary source |
| Mesa, Arizona Arizona | Mesa City Council Local government | Local | Permanent restriction or prohibition | In effect | Permitting | 7 August 2025 | Not stored as one date — see completion condition | Mesa: data centers only through council-authorized PAD overlay Primary source |
| Florida Florida | Florida Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 August 2025 | Not stored as one date — see completion condition | HB 7031 (2025) section 46 amends the data center property exemption Primary source |
| AEP Ohio service territory, Ohio Ohio | Public Utilities Commission of Ohio Regulator or commission | State | Enacted legislation or regulation | In effect | More than one stage | Effective date not stated in the source | Not stored as one date — see completion condition | PUCO approval of AEP Ohio data center tariff pages Primary source |
| West Virginia West Virginia | West Virginia Legislature Legislature | State | Enacted legislation or regulation | In effect | More than one stage | 11 July 2025 | Not stored as one date — see completion condition | HB 2014: certified microgrid and high impact data center program; local preemption Primary source |
| Wisconsin Wisconsin | Wisconsin Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 10 July 2025 | Not stored as one date — see completion condition | 2025 Wisconsin Act 16: data center tax incremental district exception Primary source |
| Indiana Indiana | Indiana General Assembly Legislature | State | Permanent restriction or prohibition | In effect | Construction | 1 July 2025 | Not stored as one date — see completion condition | SEA 431 (2025): conditions on data center construction by foreign-adversary companies Primary source · Archived copy (4 October 2026) |
| Kansas Kansas | Kansas Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 July 2025 | Not stored as one date — see completion condition | Qualified data centers excluded from economic development electric rate discounts Primary source |
| Kansas Kansas | Kansas Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 July 2025 | Not stored as one date — see completion condition | Security review before incentives for qualified data centers Primary source |
| Kansas Kansas | Kansas Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 July 2025 | Not stored as one date — see completion condition | Qualified data center 20-year sales tax exemption Primary source |
| Minnesota Minnesota | Minnesota Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | 1 July 2025 | Not stored as one date — see completion condition | Electricity exemption removed after June 2025 Primary source |
| Kentucky Kentucky | Kentucky General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 27 June 2025 | Not stored as one date — see completion condition | HB 775 (2025), Acts ch. 98, sec. 34: qualified data center project investment thresholds Primary source |
| Clarke County, Iowa Iowa | Clarke County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Construction | 23 June 2025 | Not stored as one date — see completion condition | Clarke County: temporary moratorium on data center construction (Resolution 25-011) Primary source |
| Oregon Oregon | Oregon Legislative Assembly Legislature | State | Enacted legislation or regulation | In effect | Operation | 16 June 2025 | Not stored as one date — see completion condition | POWER Act: separate rate class for 20 MW+ large energy use facilities (data centers) Primary source |
| Minnesota Minnesota | Minnesota Legislature Legislature | State | Reporting or resource-use requirement | In effect | Permitting | 15 June 2025 | No expiration date recorded | Water-use permit conditions for large data centers Primary source |
| Minnesota Minnesota | Minnesota Legislature Legislature | State | Enacted legislation or regulation | In effect | Operation | 15 June 2025 | No expiration date recorded | Annual fee on qualified large-scale data centers Primary source |
| Minnesota Minnesota | Minnesota Legislature Legislature | State | Enacted legislation or regulation | In effect | More than one stage | Several dates apply; see the source | No expiration date recorded | 2025 data center act (H.F. 16) Primary source |
| Iowa Iowa | Iowa General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 6 June 2025 | Not stored as one date — see completion condition | 2025 duration limits on data center fuel and electricity exemptions Primary source |
| Montana Montana | Montana Legislature Legislature | State | Enacted legislation or regulation | In effect | More than one stage | 13 May 2025 | Not stored as one date — see completion condition | 2025 amendments to data center property class and sale of data center power Primary source |
| Santee Cooper service territory, South Carolina South Carolina | South Carolina Public Service Authority (Santee Cooper) Utility | Utility territory | Enacted legislation or regulation | In effect | Operation | 25 April 2025 | Scheduled 24 April 2029 | Santee Cooper experimental large load rate schedule L-25-LL Primary source |
| Michigan Michigan | Michigan Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 17 April 2025 | Not stored as one date — see completion condition | Enterprise data center sales tax exemption Primary source |
| Arkansas Arkansas | Arkansas General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Act 548 of 2025 amendments to the data center sales and use tax exemption Primary source |
| Michigan Michigan | Michigan Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 2 April 2025 | Not stored as one date — see completion condition | Enterprise data center use tax exemption Primary source |
| Louisiana (LPSC-jurisdictional utilities) Louisiana | Louisiana Public Service Commission Regulator or commission | State | Reporting or resource-use requirement | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | LPSC directive to Staff to review data-center cybersecurity effects on utility infrastructure Primary source |
| Washington Washington | Governor of Washington Executive | State | Enacted legislation or regulation | In effect | More than one stage | 3 February 2025 | Not stored as one date — see completion condition | Data Center Workgroup order Primary source |
| Marana, Arizona Arizona | Marana Mayor and Town Council Local government | Local | Permanent restriction or prohibition | In effect | Permitting | 17 January 2025 | Not stored as one date — see completion condition | Marana: data centers only through specific-plan rezoning Primary source |
| Appalachian Power service territory, Virginia Virginia | Appalachian Power Company (tariff filed with the Virginia State Corporation Commission) Utility | Utility territory | Enacted legislation or regulation | In effect | Incentive | 1 January 2025 | Not stored as one date — see completion condition | APCo Virginia economic development rider excludes mobile data centers Primary source |
| Louisiana Louisiana | Louisiana Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | More than one stage | 4 December 2024 | Not stored as one date — see completion condition | Sales and use tax exemption for approved data center facilities Primary source |
| Massachusetts Massachusetts | Massachusetts General Court Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | No expiration date recorded | Qualified data center sales and use tax exemption (St. 2024, c. 238) Primary source |
| Fairfax County, Virginia Virginia | Fairfax County Board of Supervisors Local government | Local | Permanent restriction or prohibition | In effect | Permitting | 11 September 2024 | Not stored as one date — see completion condition | Fairfax County: data center zoning amendment (ZO 112.1-2024-9) Primary source |
| Montana-Dakota Utilities Co. South Dakota electric service area South Dakota | Montana-Dakota Utilities Co. (tariff filed with the South Dakota Public Utilities Commission) Utility | Utility territory | Enacted legislation or regulation | In effect | Operation | 1 September 2024 | Not stored as one date — see completion condition | Montana-Dakota South Dakota Rate 45 for data center-type loads Primary source |
| Iowa Iowa | Iowa Department of Revenue Government agency | State | Enacted legislation or regulation | In effect | Incentive | 28 August 2024 | Scheduled 28 August 2029 | Revenue rules implementing the data center exemption and refunds Primary source |
| New Jersey New Jersey | New Jersey Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 25 July 2024 | Not stored as one date — see completion condition | Next New Jersey Program tax credits for AI and AI data center businesses Primary source |
| Kentucky Kentucky | Kentucky General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 15 July 2024 | Not stored as one date — see completion condition | Data center equipment sales-tax exemption Primary source |
| Kentucky Kentucky | Kentucky General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 15 July 2024 | Not stored as one date — see completion condition | Qualified data center project approval program (KRS 154.20-226) Primary source |
| Maryland Maryland | Maryland General Assembly Legislature | State | Enacted legislation or regulation | In effect | Permitting | 1 July 2024 | Not stored as one date — see completion condition | Critical Infrastructure Streamlining Act of 2024 (ch. 411, SB 474) Primary source |
| Arkansas Arkansas | Arkansas General Assembly Legislature | State | Enacted legislation or regulation | In effect | Operation | 3 May 2024 | No expiration date recorded | Act 173 amendments to the Arkansas Data Centers Act Primary source |
| Mississippi Mississippi | Mississippi Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 30 January 2024 | Not stored as one date — see completion condition | Major Economic Impact Act amendments for certain data center projects (2024) Primary source |
| Sarpy County, Nebraska (county zoning jurisdiction) Nebraska | Sarpy County Board of Commissioners Local government | Local | Enacted legislation or regulation | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Sarpy County: zoning districts where data centers are allowed Primary source |
| Wisconsin Wisconsin | Wisconsin Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 October 2023 | Not stored as one date — see completion condition | Qualified data center certification by WEDC (Wis. Stat. 238.40) Primary source |
| Wisconsin Wisconsin | Wisconsin Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | More than one stage | 1 October 2023 | Not stored as one date — see completion condition | Qualified data center sales and use tax exemption (Wis. Stat. 77.54(70)) Primary source |
| Montana-Dakota Utilities electric service area, North Dakota North Dakota | Montana-Dakota Utilities Co. Utility | Utility territory | Enacted legislation or regulation | In effect | Operation | 1 July 2023 | Not stored as one date — see completion condition | Montana-Dakota Rate 45 for data center-type high density loads (10 MW and above) Primary source |
| Idaho Power Company service territory, Idaho Idaho | Idaho Public Utilities Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | IPUC Order 35777: Idaho Power special contract for a data center Primary source |
| Arkansas Arkansas | Arkansas General Assembly Legislature | State | Enacted legislation or regulation | In effect | More than one stage | Effective date not stated in the source | No expiration date recorded | Arkansas Data Centers Act of 2023 (Act 851) Primary source |
| Arkansas Arkansas | Arkansas General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Act 819 of 2023 data center sales and use tax exemption Primary source |
| Illinois Illinois | Illinois Department of Commerce and Economic Opportunity Government agency | State | Incentive or explicitly supportive policy | In effect | Incentive | 22 December 2022 | Not stored as one date — see completion condition | Data Center Investment Program administrative rules (14 Ill. Adm. Code 521) Primary source |
| Chandler, Arizona Arizona | Chandler City Council Local government | Local | Permanent restriction or prohibition | In effect | More than one stage | Several dates apply; see the source | Not stored as one date — see completion condition | Chandler: data centers limited to planned-area approval Primary source |
| Florida Florida | Florida Department of Revenue Government agency | State | Enacted legislation or regulation | In effect | Incentive | 14 June 2022 | Not stored as one date — see completion condition | Rule 12A-1.108, F.A.C.: exemption for data center property Primary source |
| Georgia Georgia | Georgia General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | 9 May 2022 | Scheduled 31 December 2031 | Act 842 revises thresholds and extends exemption Primary source · Archived copy (4 June 2023) |
| Pennsylvania Pennsylvania | Pennsylvania General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 January 2022 | Not stored as one date — see completion condition | Computer data center equipment sales and use tax exemption Primary source |
| Connecticut Connecticut | Connecticut General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 July 2021 | Not stored as one date — see completion condition | Qualified data center tax exemptions (section 32-286) Primary source |
| District of Columbia District of Columbia | Department of Energy and Environment Government agency | District (state-level) | Reporting or resource-use requirement | In effect | Reporting | 30 April 2021 | Not stored as one date — see completion condition | 2021 energy standard for the Data Center property type Primary source · Archived copy (4 October 2026) |
| Arizona Arizona | Arizona Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | 2021 extension of the data center certification cutoff to 2033 Primary source |
| Idaho Idaho | Idaho Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 July 2020 | Not stored as one date — see completion condition | Sales and use tax exemption for data center server equipment Primary source |
| Maryland Maryland | Maryland General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 July 2020 | Not stored as one date — see completion condition | Qualified data center sales and use tax exemption (Tax-General 11-239) Primary source |
| Missouri Missouri | Missouri General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 28 August 2018 | Not stored as one date — see completion condition | Data storage center sales and use tax exemption Primary source |
| Virginia Virginia | Virginia General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 July 2010 | Not stored as one date — see completion condition | Data center retail sales-tax exemption Primary source |
| New York New York | New York State Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | 1 September 2000 | No expiration date recorded | Sales tax exemption for Internet data center operators Primary source |
| Alabama Alabama | Alabama Department of Revenue Government agency | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Chapter 9B tax abatements for data processing centers Primary source |
| Arizona Arizona | Arizona Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Computer data center tax relief Primary source |
| Florida Florida | Florida Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | More than one stage | Several dates apply; see the source | Not stored as one date — see completion condition | Sales tax exemption for data center property Primary source |
| Georgia Georgia | Georgia Department of Revenue Government agency | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Scheduled 31 December 2031 | High-technology data center equipment exemption Primary source |
| Iowa Iowa | Iowa General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | More than one stage | Several dates apply; see the source | Not stored as one date — see completion condition | Data center business sales tax exemption Primary source |
| Iowa Iowa | Iowa General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Data center sales and use tax refunds (Iowa Code 423.4) Primary source |
| City of Aurora, Illinois Illinois | Aurora City Council Local government | Local | Reporting or resource-use requirement | In effect | Operation | Effective date not stated in the source | No expiration date recorded | Aurora: data center performance, reporting and privacy code chapters (File 26-0092) Primary source |
| City of Aurora, Illinois Illinois | Aurora City Council Local government | Local | Enacted legislation or regulation | In effect | Permitting | Effective date not stated in the source | No expiration date recorded | Aurora: data center facility conditional use and performance standards (File 26-0112) Primary source |
| Indiana Indiana | Indiana Economic Development Corporation Government agency | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Data center sales-and-use tax exemption Primary source |
| Indiana Indiana | Indiana General Assembly Legislature | State | Enacted legislation or regulation | In effect | Incentive | Effective date not stated in the source | Scheduled 1 July 2027 | HEA 1406 (2026) section 27: state study of data center tax incentives and impacts Primary source · Archived copy (3 October 2026) |
| Indiana Indiana | Indiana General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Local property tax exemption for data center IT equipment (IC 6-1.1-10-44) Primary source · Archived copy (4 October 2026) |
| Maryland Maryland | Maryland General Assembly Legislature | State | Reporting or resource-use requirement | In effect | Reporting | Several dates apply; see the source | Scheduled 30 June 2027 | Data center impact analysis and report (2025 ch. 10, SB 116) Primary source |
| Maryland (the construction limit applies only in Baltimore City) Maryland | Maryland General Assembly Legislature | State | Enacted legislation or regulation | In effect | More than one stage | Several dates apply; see the source | Not stored as one date — see completion condition | Utility RELIEF Act data center provisions (2026 ch. 353, HB 1532) Primary source |
| Baltimore City, Maryland Maryland | Mayor and City Council of Baltimore Local government | Local | Local construction moratorium | In effect | Permitting | Several dates apply; see the source | Not stored as one date — see completion condition | Baltimore City: temporary citywide prohibition of data centers as a zoning use (Ord. 26-128) Primary source |
| Maryland Maryland | Maryland General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Local option to reduce property tax on data center personal property (TP 7-248) Primary source |
| Maine Maine | Governor of Maine Executive | State | Enacted legislation or regulation | In effect | More than one stage | Effective date not stated in the source | No expiration date recorded | Data Center Advisory Council and ratepayer protection order Primary source · Archived copy (16 July 2026) |
| Michigan Michigan | Michigan Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Renaissance zone levies not collected on data center property at a 2016 zone site (MCL 211.7ff(7)) Primary source |
| Michigan Michigan | Michigan Strategic Fund Government agency | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Michigan Strategic Fund enterprise data center exemption guidelines Primary source |
| Minnesota Minnesota | Minnesota Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Qualified data center sales-tax exemption Primary source |
| Kansas City, Missouri Missouri | Kansas City City Council Local government | Local | Enacted legislation or regulation | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Kansas City: data center zoning use standards (Ordinance 251031) Primary source |
| Montana Montana | Montana Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Class seventeen property tax rate for qualified data centers Primary source |
| North Carolina North Carolina | North Carolina General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Sales tax exemptions for datacenter equipment (G.S. 105-164.13) Primary source |
| North Dakota North Dakota | North Dakota Legislative Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Sales tax exemption for qualified data center IT equipment Primary source |
| Nebraska Nebraska | Nebraska Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Nebraska Advantage Act tier 2 benefits for large data center projects (closed to new applications after 2020) Primary source |
| Nevada Nevada | Nevada Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Scheduled 31 December 2056 | Partial tax abatement for a data center Primary source |
| South Carolina South Carolina | South Carolina General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | More than one stage | Several dates apply; see the source | Not stored as one date — see completion condition | Datacenter equipment and electricity sales tax exemption Primary source |
| Leola site, FEM Electric Association service area, South Dakota South Dakota | South Dakota Public Utilities Commission Regulator or commission | State | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | SD PUC EL24-027: electric provider assigned for the Leola data center Primary source |
| Texas Texas | Texas Comptroller of Public Accounts Government agency | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Data center sales-tax exemption Primary source |
| Utah Utah | Utah Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Sales tax exemption for qualifying data center equipment Primary source |
| Virginia Virginia | Virginia General Assembly Legislature | State | Reporting or resource-use requirement | In effect | Reporting | Effective date not stated in the source | Not stored as one date — see completion condition | Department of Energy data center waste-heat work group and report (2026 c. 591) Primary source |
| Virginia Virginia | Virginia General Assembly Legislature | State | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | Data center fixtures at 100 percent of cost-approach value (2026 Special Session I budget, Item 3-5.18) Primary source · Archived copy (8 October 2026) |
| Virginia Virginia | Virginia General Assembly Legislature | State | Enacted legislation or regulation | In effect | Operation | Effective date not stated in the source | Not stored as one date — see completion condition | Data center fixtures assessed by the cost approach for real property tax (Va. Code 58.1-3295.3) Primary source |
| Virginia Virginia | Virginia General Assembly Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Effective date not stated in the source | Not stored as one date — see completion condition | Separate local property-tax class for data center computer equipment (Va. Code 58.1-3506 A 43) Primary source |
| Washington Washington | Washington State Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Scheduled 1 July 2048 | Rural-county data center use-tax exemption Primary source |
| Washington Washington | Washington State Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Scheduled 1 July 2043 | Large-county data center use-tax exemption Primary source |
| Washington Washington | Washington State Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Scheduled 1 July 2048 | Rural-county data center sales-tax exemption Primary source |
| Washington Washington | Washington State Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Scheduled 1 July 2038 | Large-county data center sales-tax exemption Primary source |
| Dane County, Wisconsin (towns under county zoning) Wisconsin | Dane County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Dane County: 18-month pause on hyperscale data center zoning permits Primary source · Archived copy (4 October 2026) |
| Madison, Wisconsin Wisconsin | Madison Common Council Local government | Local | Local construction moratorium | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Madison: temporary pause on data center zoning certificates Primary source |
| Wood County, Wisconsin (all municipalities) Wisconsin | Wood County Board of Supervisors Local government | Local | Reporting or resource-use requirement | In effect | Proposal | Effective date not stated in the source | Not stored as one date — see completion condition | Wood County: notice requirement for large-scale data center projects (Ord. #709) Primary source |
| West Virginia West Virginia | West Virginia Legislature Legislature | State | Enacted legislation or regulation | In effect | Incentive | Several dates apply; see the source | Scheduled 31 December 2055 | High impact data center property valuation and tax distribution Primary source |
| Wyoming Wyoming | Wyoming Legislature Legislature | State | Incentive or explicitly supportive policy | In effect | Incentive | Several dates apply; see the source | Not stored as one date — see completion condition | Sales tax exemption for data processing services center equipment Primary source |
Download the policy dataset (JSON). Policy actions are not facility, project, claim, update, public-post or directory counts.