On 14 January 2026 the Federal Energy Regulatory Commission accepted Southwest Power Pool tariff revisions, effective 15 January 2026, that add a High Impact Large Load study process and a generation assessment for those loads. The order records that SPP cited a surge in large-load requests from data centers and others. A later order on 9 March 2026 accepted the corrections the Commission had directed. The revisions are to SPP's regional tariff and do not approve any particular project.
Scope
Federal Energy Regulatory Commission order 194 FERC ¶ 61,031 (Docket ER26-247-000) accepts, effective 15 January 2026 and subject to condition, Southwest Power Pool tariff revisions that add a High Impact Large Load study process and a High Impact Large Load Generation Assessment. The tariff definition covers a new or increased commercial or industrial load at a single site of 10 MW or more at 69 kV or below, or 50 MW or more above 69 kV. It sets study and operating requirements for those loads and does not by itself approve any project.
- Geographic scope
- Southwest Power Pool region (multistate)
- Coverage
- 17 jurisdictions listed, 17 only in part
- Jurisdiction
- Regional grid
- Authority type
- Regulator or commission
- Issuing authority
- Federal Energy Regulatory Commission
Covered jurisdictions
This instrument is stored once. It appears on the policy page of each jurisdiction below in a separate federal and multistate section and is not counted in any jurisdiction's own records, in-effect totals or map shading. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.
- Arizona part only
- Arkansas part only
- Colorado part only
- Iowa part only
- Kansas part only
- Louisiana part only
- Minnesota part only
- Missouri part only
- Montana part only
- Nebraska part only
- New Mexico part only
- North Dakota part only
- Oklahoma part only
- South Dakota part only
- Texas part only
- Utah part only
- Wyoming part only
How this list was set, checked 3 November 2026: Southwest Power Pool says it serves members in all or part of 17 states, and its Regional State Committee page names commissions from 17 states, which are the states listed here. SPP does not say which are covered only in part, so every listed state is marked as covered in part; that is not a finding that any of them is not wholly covered. The list describes the SPP region as of October 2026, after its April 2026 expansion into the Western Interconnection. Coverage source
Dates
- Adopted
- 14 January 2026
- Effective
- 15 January 2026
- Scheduled expiration
- No expiration date recorded
- Ended
- Not recorded as ended
- Completion condition
- None stated
- Source document
- 14 January 2026
- Last checked
- 3 November 2026
What this does not establish
- The Commission's order names no list of states. The coverage list comes from SPP's own description of its region and does not establish that the tariff applies to any particular site, utility or project. The order also predates the April 2026 expansion of the SPP region.
- The tariff text itself was not opened; the provisions are described from the Commission's orders.
- SPP's High Impact Large Load web page still called these proposed solutions when checked on 3 November 2026. The Commission's order is the controlling record here.
Unresolved questions
None recorded.
Relationships
Supersession means a later instrument replaces the earlier legal effect. Repeal links identify the repeal instrument and the measure it ends. A later implementation or related letter is not treated as a replacement unless the record says so.
- Related, not a replacement Southwest Power Pool: Conditional High Impact Large Load Service accepted by FERC (ER26-1323) (In effect)
Sources
Primary source: Federal Energy Regulatory Commission page on spp.org
- Order on compliance filing, 9 March 2026 — accepts the corrections the January order directed, effective 15 January 2026 · 9 March 2026
- SPP docket folder ER26-247 — SPP's list of filings and orders in this docket