Dated examples (labeled by claim class)
JLARC: present cost allocation vs future system risk
JLARC reported that data centers were paying their full current cost of service under then-current rate structures, while projecting immense demand growth and recommending planning for stranded infrastructure costs that could fall on existing customers. Observed finding about then-current rates; forward risk is a planning conclusion, not a measured residential bill delta.
IURC Cause 46276 — Google / Indiana Michigan Power contract
The Commission approved a customer-specific clean-capacity arrangement and custom demand-response contract with Google (via a special-purpose entity), plus associated accounting/ratemaking treatment. The order states Google bears specified performance, shortfall and related risks, with CCA costs recovered through I&M’s Resource Adequacy Rider and workpapers required in future RAR filings. The Commission also opened subdocket 46276 S1 because extensive redactions left the public unable to evaluate load size, contract duration, bill-credit calculation, CCA scale, event performance and demand-response details.
Large-load rate design options
Lawrence Berkeley National Laboratory’s 2026 update surveys electricity rate designs for large loads. It is a methods and options paper—not a finding that any one utility’s residential rates rose because of data centers.
What varies by place and project
Answers differ by tariff class, whether the load takes service under a special contract, who funds new substations and generation, exit fees, minimum terms, and whether demand response is enforceable and reported. A campus in a restructured market faces different allocation rules than one on a vertically integrated utility.
Four questions that must stay separate (methodology)
1. Who pays current service costs?
Demand charges, minimum bills, connection contributions and special contracts.
2. Who pays new system costs?
Generation, transmission and distribution that outlive or exceed one customer’s commitment.
3. Does system expansion change all bills?
Attribution needs a counterfactual—not a headline.
4. Can the load help?
Demand response and customer-provided capacity only help when performance is enforceable and reported.