State, local and federal policy

Local construction moratorium

Recorded actions of type Local construction moratorium. An empty result is not a national finding.

Action type is the legal character of the instrument. It is not a score.

Filter (status, type)
More national filters: authority and jurisdiction
Local construction moratorium
ScopeAuthorityJurisdictionActionStatusStageEffectiveTimingRecord
City of Cleveland, Ohio
Ohio
Cleveland City Council
Local government
LocalLocal construction moratoriumIn effectPermitting19 October 2026Scheduled 29 January 2027Cleveland: standalone data center permit pause extended to 29 January 2027 (Emergency Ordinance 1246-2026)
Primary source
Unincorporated Johnson County, Iowa
Iowa
Johnson County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage15 October 2026Scheduled 8 August 2027Johnson County: data-center approval pause extended to 8 August 2027
Primary source
Unincorporated Manatee County, Florida
Florida
Manatee County Board of County Commissioners
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionManatee County: 12-month pause on new data center development applications (Ordinance 26-42)
Primary source
Joyfield Township, Michigan
Michigan
Joyfield Township Board
Local government
LocalLocal construction moratoriumIn effectMore than one stage7 October 2026Not stored as one date — see completion conditionJoyfield Township: 12-month moratorium on data center and crypto mining approvals (Resolution 2026-07)
Primary source
Unincorporated Mendocino County, California
California
Mendocino County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage6 October 2026Scheduled 21 August 2028Mendocino County (unincorporated): extension of data center moratorium to 21 August 2028 (Ordinance No. 4562)
Primary source
City and County of San Francisco, California
California
San Francisco Board of Supervisors
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionSan Francisco: 45-day interim zoning moratorium on data center approvals (File No. 261021)
Primary source
Unincorporated Pima County, Arizona
Arizona
Pima County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectPermitting22 September 2026Not stored as one date — see completion conditionPima County (unincorporated): data center development moratorium (Resolution 2026-56)
Primary source
City of Foley, Alabama
Alabama
Foley City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionFoley: six-month moratorium on data center and cryptocurrency mining applications
Primary source
Unincorporated Lake County, Illinois
Illinois
Lake County Board
Local government
LocalLocal construction moratoriumIn effectMore than one stage8 September 2026Scheduled 11 May 2027Lake County (unincorporated areas): temporary moratorium on data centers
Primary source
Unincorporated Mendocino County, California
California
Mendocino County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage1 September 2026Not stored as one date — see completion conditionMendocino County (unincorporated): data center moratorium imposed 1 September 2026 (Ordinance No. 4561)
Primary source
Durham County, North Carolina
North Carolina
Durham County Board of County Commissioners
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedConstructionEffective status not verifiedNot stored as one date — see completion conditionDurham County: nine-month moratorium on data centers over 100,000 square feet
Primary source
Town of Brookhaven, New York
New York
Brookhaven Town Board
Local government
LocalLocal construction moratoriumIn effectMore than one stage27 August 2026Scheduled 31 December 2027Town of Brookhaven: data center moratorium through 31 December 2027 (Local Law No. 12-2026)
Primary source
Unincorporated Pierce County, Washington
Washington
Pierce County Council
Local government
LocalLocal construction moratoriumIn effectPermitting27 August 2026Not stored as one date — see completion conditionPierce County: one-year pause on permits for data centers over 10 MW in unincorporated areas (Ord. O2026-557)
Primary source
Town of Orangetown, New York
New York
Orangetown Town Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionTown of Orangetown: 180-day moratorium on data center and battery storage approvals (Local Law No. 5 of 2026)
Primary source
Louisville/Jefferson County Metro, Kentucky
Kentucky
Louisville/Jefferson County Metro Council
Local government
LocalLocal construction moratoriumIn effectPermittingEffective date not stated in the sourceNot stored as one date — see completion conditionLouisville/Jefferson County Metro: temporary data center and telecommunications hotel moratorium
Primary source
Town of Newport, New York
New York
Newport Town Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionTown of Newport: one-year pause on data center and cryptocurrency mining approvals (Local Law 4 of 2026)
Primary source
Nance County, Nebraska
Nebraska
Nance County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage11 August 2026Not stored as one date — see completion conditionNance County: moratorium on data center construction and permits (Resolution #26-13)
Primary source
Lucas County, Iowa
Iowa
Lucas County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage5 August 2026Not stored as one date — see completion conditionLucas County: one-year moratorium on data center permitting and construction (5 August 2026 resolution)
Primary source
Tukwila, Washington
Washington
Tukwila City Council
Local government
LocalLocal construction moratoriumIn effectPermitting3 August 2026Scheduled 3 August 2027Tukwila: one-year moratorium on applications for data centers over 20 MVA (Ordinance 2795)
Primary source
Iowa County, Iowa
Iowa
Iowa County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage31 July 2026Scheduled 31 July 2027Iowa County: 12-month moratorium on data center development applications (Resolution 2026-07-31)
Primary source
Unincorporated Bannock County, Idaho
Idaho
Bannock County Board of County Commissioners
Local government
LocalLocal construction moratoriumIn effectPermitting30 July 2026Scheduled 26 January 2027Bannock County: 180-day data center application moratorium
Primary source
Worcester County, Maryland
Maryland
Worcester County Commissioners
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionWorcester County: 12-month pause on data center and cable landing station permits (Resolution 26-18)
Primary source
Hillsboro, Oregon
Oregon
Hillsboro City Council
Local government
LocalLocal construction moratoriumIn effectPermitting27 July 2026Scheduled 24 November 2026Hillsboro: 120-day pause on new data center land use applications
Primary source · Archived copy (20 September 2026)
Sierra County, New Mexico
New Mexico
Sierra County Board of County Commissioners
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionSierra County: 18-month moratorium on approval or support of data center development (Resolution 2026-51)
Primary source
Borough of Sayreville, New Jersey
New Jersey
Sayreville Borough Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionSayreville: 18-month moratorium prohibiting data center development in all zones (Ordinance #15-26)
Primary source
City of Cleveland, Ohio
Ohio
Cleveland City Council
Local government
LocalLocal construction moratoriumIn effectPermitting20 July 2026Not stored as one date — see completion conditionCleveland: temporary moratorium on data center permits (Ord. 556-2026)
Primary source
Van Buren County, Tennessee
Tennessee
Van Buren County Commission
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionVan Buren County: two-year data center moratorium resolution (Resolution 506)
Primary source
Fillmore County, Nebraska
Nebraska
Fillmore County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectPermitting14 July 2026Scheduled 14 July 2028Fillmore County: 24-month moratorium on new data center applications (Resolution 2026-10)
Primary source
Santa Fe County, New Mexico
New Mexico
Santa Fe County Board of County Commissioners
Local government
LocalLocal construction moratoriumIn effectPermitting9 July 2026Scheduled 9 January 2028Santa Fe County: 18-month data center development-approval moratorium
Primary source
Unincorporated DeKalb County, Georgia
Georgia
DeKalb County Board of Commissioners
Local government
LocalLocal construction moratoriumIn effectPermitting7 July 2026Scheduled 30 March 2027DeKalb County (unincorporated): data center application moratorium extended to 30 March 2027
Primary source
Prince George's County, Maryland
Maryland
Prince George's County Council
Local government
LocalLocal construction moratoriumIn effectPermitting7 July 2026Not stored as one date — see completion conditionPrince George's County: two-year pause on data center subdivision and site plans (CR-066-2026)
Primary source
Independence, Missouri
Missouri
Independence City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionIndependence: 180-day pause on new data center and battery storage permits and applications
Primary source
Logan, Utah
Utah
Logan Municipal Council
Local government
LocalLocal construction moratoriumIn effectConstruction1 July 2026Not stored as one date — see completion conditionLogan: temporary land use regulation prohibiting data center development (Ord. 26-12)
Primary source
Town of East Fishkill, New York
New York
East Fishkill Town Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionEast Fishkill: three-year data center moratorium (Local Law No. 3 of 2026)
Primary source
Hernando County, Florida
Florida
Hernando County Board of County Commissioners
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionHernando County: 365-day moratorium on data center development orders and permits (Ordinance 2026-15)
Primary source
Hillsdale Township, Michigan
Michigan
Hillsdale Township Board of Trustees
Local government
LocalLocal construction moratoriumIn effectPermitting24 June 2026Not stored as one date — see completion conditionHillsdale Township: one-year moratorium on data center applications (Ordinance No. 2026-06-01)
Primary source
City of Homewood, Alabama
Alabama
Homewood City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionHomewood: temporary moratorium on new large-scale data center applications and expansions
Primary source
Woodbury County, Iowa
Iowa
Woodbury County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage23 June 2026Scheduled 23 June 2027Woodbury County: 12-month moratorium on data center development applications (Resolution 14064)
Primary source
Prairieville Township, Michigan
Michigan
Prairieville Township Board of Trustees
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionPrairieville Township: one-year moratorium on data center applications (Ordinance No. 187)
Primary source
Coweta County, Georgia
Georgia
Coweta County Board of Commissioners
Local government
LocalLocal construction moratoriumIn effectPermitting16 June 2026Scheduled 13 December 2026Coweta County: 180-day pause on new data center applications
Primary source
Adams County, Iowa
Iowa
Adams County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectMore than one stage15 June 2026Scheduled 15 June 2028Adams County: 24-month moratorium on data center permits and approvals (Resolution 2026-25)
Primary source
Seattle, Washington
Washington
Seattle City Council
Local government
LocalLocal construction moratoriumIn effectPermitting11 June 2026Scheduled 11 June 2027Seattle: one-year emergency pause on data center applications
Primary source
Lexington-Fayette Urban County, Kentucky
Kentucky
Lexington-Fayette Urban County Council
Local government
LocalLocal construction moratoriumIn effectMore than one stage9 June 2026Scheduled 31 October 2027Lexington-Fayette Urban County: data center zoning and permit pause extended to 31 October 2027
Primary source
Mason Township, Cass County, Michigan
Michigan
Mason Township Board of Trustees
Local government
LocalLocal construction moratoriumIn effectPermitting8 June 2026Scheduled 8 June 2027Mason Township (Cass County): 12-month moratorium on data center applications (Ordinance No. 2026-01)
Primary source
Charlotte and its extraterritorial jurisdiction, North Carolina
North Carolina
Charlotte City Council
Local government
LocalLocal construction moratoriumIn effectPermitting8 June 2026Scheduled 18 October 2027Charlotte: data center application moratorium with an approved extension
Primary source
Iron County, Utah
Utah
Iron County Board of County Commissioners
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionIron County: 180-day pause on data center, data center power plant and solar applications (Ordinance 2026-13)
Primary source
Town of New Denmark, Wisconsin
Wisconsin
Town of New Denmark Town Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionTown of New Denmark: one-year moratorium on approval and siting of data centers (Resolution 2026-04)
Primary source
Unincorporated Boulder County, Colorado
Colorado
Boulder County Board of County Commissioners
Local government
LocalLocal construction moratoriumIn effectPermitting2 June 2026Scheduled 2 December 2026Boulder County: six-month pause on data center and detention center planning applications
Primary source
Cortland, Ohio
Ohio
Cortland City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionCortland: pause of up to one year on data center permit applications (Ordinance O-21-26)
Primary source
Lyndon Township, Michigan
Michigan
Lyndon Township Board
Local government
LocalLocal construction moratoriumIn effectPermitting27 May 2026Not stored as one date — see completion conditionLyndon Township: 12-month pause on data center permits and approvals (Resolution 26-06)
Primary source
Denver, Colorado
Colorado
Denver City Council
Local government
LocalLocal construction moratoriumIn effectPermitting21 May 2026Scheduled 21 May 2027Denver: one-year pause on data center zoning permits and site plans
Primary source
Chesaning Township, Michigan
Michigan
Chesaning Township Board of Trustees
Local government
LocalLocal construction moratoriumIn effectMore than one stage18 May 2026Scheduled 18 May 2027Chesaning Township: 12-month data center moratorium (Ordinance No. 26-001)
Primary source
Elko New Market, Minnesota
Minnesota
Elko New Market City Council
Local government
LocalLocal construction moratoriumIn effectMore than one stage14 May 2026Scheduled 13 May 2027Elko New Market: data center moratorium until 13 May 2027 (Interim Ordinance No. 345)
Primary source
Florence Township (Erie County), Ohio
Ohio
Florence Township Board of Trustees
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionFlorence Township (Erie County): 12-month pause on data center zoning permits (Resolution 2026-25)
Primary source
Audubon County, Iowa
Iowa
Audubon County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectPermitting5 May 2026Scheduled 1 May 2027Audubon County: moratorium on commercial data center applications until 1 May 2027 (Resolution 2026-27)
Primary source
Webster Township, Washtenaw County, Michigan
Michigan
Webster Township Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionWebster Township: one-year data center and battery storage moratorium (Ordinance No. 26-02)
Primary source
Oklahoma City, Oklahoma
Oklahoma
Oklahoma City Council
Local government
LocalLocal construction moratoriumIn effectMore than one stage21 April 2026Scheduled 31 December 2026Oklahoma City: data center rezoning and permit moratorium to 31 December 2026 (emergency ordinance)
Primary source
Luna Pier, Michigan
Michigan
Luna Pier City Council
Local government
LocalLocal construction moratoriumIn effectPermitting11 April 2026Scheduled 11 April 2027Luna Pier: one-year moratorium on data center applications (Ordinance No. 251)
Primary source
Comstock Charter Township, Michigan
Michigan
Comstock Charter Township Board of Trustees
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionComstock Charter Township: one-year moratorium on data center applications (Ordinance No. 565)
Primary source
Erie Township, Michigan
Michigan
Erie Township Board
Local government
LocalLocal construction moratoriumIn effectPermitting16 March 2026Not stored as one date — see completion conditionErie Township: one-year moratorium on data center applications (Ordinance No. 132)
Primary source
Big Rapids Charter Township, Michigan
Michigan
Big Rapids Charter Township Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionBig Rapids Charter Township: one-year data center moratorium (Data Center Moratorium Ordinance)
Primary source
Monclova Township, Ohio
Ohio
Monclova Township Board of Trustees
Local government
LocalLocal construction moratoriumIn effectMore than one stage17 February 2026Scheduled 17 February 2027Monclova Township: 12-month pause on data center applications and approvals (Resolution 02172026-01)
Primary source
Unincorporated Chatham County, North Carolina
North Carolina
Chatham County Board of Commissioners
Local government
LocalLocal construction moratoriumIn effectPermitting11 February 2026Scheduled 11 February 2027Chatham County: 12-month pause on data center and cryptocurrency mining permitting (File 26-0061)
Primary source
Breckinridge County, Kentucky
Kentucky
Breckinridge County Fiscal Court
Local government
LocalLocal construction moratoriumIn effectMore than one stageEffective date not stated in the sourceNot stored as one date — see completion conditionBreckinridge County: 365-day pause on data centers
Primary source
Unincorporated Johnson County, Iowa
Iowa
Johnson County Board of Supervisors
Local government
LocalLocal construction moratoriumSupersededMore than one stage6 November 2025Ended 15 October 2026Johnson County: 2025 data-center approval pause, later extended
Primary source
Barberton, Ohio
Ohio
Barberton City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionBarberton: council moratorium on data centers within the city (Ordinance No. 157-2025)
Primary source
Prince George's County, Maryland
Maryland
Prince George's County Council
Local government
LocalLocal construction moratoriumExpiredPermitting16 September 2025Ended 16 March 2026Prince George's County: six-month data center subdivision pause (CR-098-2025, expired)
Primary source
Clarke County, Iowa
Iowa
Clarke County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectConstruction23 June 2025Not stored as one date — see completion conditionClarke County: temporary moratorium on data center construction (Resolution 25-011)
Primary source
Unincorporated Nassau County, Florida
Florida
Nassau County Board of County Commissioners
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionNassau County: 12-month pause on data center rezoning, permit and site plan applications (Ord. 2026-044)
Primary source
Baltimore City, Maryland
Maryland
Mayor and City Council of Baltimore
Local government
LocalLocal construction moratoriumIn effectPermittingSeveral dates apply; see the sourceNot stored as one date — see completion conditionBaltimore City: temporary citywide prohibition of data centers as a zoning use (Ord. 26-128)
Primary source
Marengo Township, Michigan
Michigan
Marengo Township Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionMarengo Township: one-year data center moratorium (Ordinance No. 2026-1)
Primary source
Meridian Charter Township, Michigan
Michigan
Meridian Charter Township Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionMeridian Charter Township: six-month moratorium on data center applications (Ordinance 2026-03)
Primary source
City of Reno, Nevada
Nevada
Reno City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedPermittingEffective status not verifiedNot stored as one date — see completion conditionReno: pause on data center conditional use permit applications to 31 August 2027 (council resolution)
Primary source
Town of Clifton Park, New York
New York
Clifton Park Town Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionTown of Clifton Park: 12-month moratorium on data storage center applications (Local Law No. 9 of 2026)
Primary source
Town of DeWitt, New York
New York
DeWitt Town Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionTown of DeWitt: data center application moratorium through 31 December 2027 (Local Law No. 4-2026)
Primary source
Town of York, New York
New York
York Town Board
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionTown of York: 12-month pause on data center land use approvals and permits (Local Law 3 of 2026)
Primary source
City of Vermilion, Ohio
Ohio
Vermilion City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionVermilion: data center development moratorium through 23 March 2027 (Ordinance 2026-17)
Primary source
City of Memphis, Tennessee
Tennessee
Memphis City Council
Local government
LocalLocal construction moratoriumAdopted; effective status unverifiedMore than one stageEffective status not verifiedNot stored as one date — see completion conditionMemphis: 135-day pause on new data center approvals (Substitute Ord. 5986), per the city
Primary source
Nashville and Davidson County, Tennessee
Tennessee
Metropolitan Council of Nashville and Davidson County
Local government
LocalLocal construction moratoriumExpiredPermittingEffective date not stated in the sourceEnded 31 July 2026Nashville and Davidson County (Metropolitan Government): temporary data center permit moratorium (BL2026-1448, ended)
Primary source
Dane County, Wisconsin (towns under county zoning)
Wisconsin
Dane County Board of Supervisors
Local government
LocalLocal construction moratoriumIn effectPermittingEffective date not stated in the sourceNot stored as one date — see completion conditionDane County: 18-month pause on hyperscale data center zoning permits
Primary source · Archived copy (4 October 2026)
Madison, Wisconsin
Wisconsin
Madison Common Council
Local government
LocalLocal construction moratoriumIn effectPermittingEffective date not stated in the sourceNot stored as one date — see completion conditionMadison: temporary pause on data center zoning certificates
Primary source

Download the policy dataset (JSON). Policy actions are not facility, project, claim, update, public-post or directory counts.