State, local and federal policy
Local construction moratorium
Recorded actions of type Local construction moratorium. An empty result is not a national finding.
Action type is the legal character of the instrument. It is not a score.
Filter (status, type)
More national filters: authority and jurisdiction
| Scope | Authority | Jurisdiction | Action | Status | Stage | Effective | Timing | Record |
|---|---|---|---|---|---|---|---|---|
| City of Cleveland, Ohio Ohio | Cleveland City Council Local government | Local | Local construction moratorium | In effect | Permitting | 19 October 2026 | Scheduled 29 January 2027 | Cleveland: standalone data center permit pause extended to 29 January 2027 (Emergency Ordinance 1246-2026) Primary source |
| Unincorporated Johnson County, Iowa Iowa | Johnson County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 15 October 2026 | Scheduled 8 August 2027 | Johnson County: data-center approval pause extended to 8 August 2027 Primary source |
| Unincorporated Manatee County, Florida Florida | Manatee County Board of County Commissioners Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Manatee County: 12-month pause on new data center development applications (Ordinance 26-42) Primary source |
| Joyfield Township, Michigan Michigan | Joyfield Township Board Local government | Local | Local construction moratorium | In effect | More than one stage | 7 October 2026 | Not stored as one date — see completion condition | Joyfield Township: 12-month moratorium on data center and crypto mining approvals (Resolution 2026-07) Primary source |
| Unincorporated Mendocino County, California California | Mendocino County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 6 October 2026 | Scheduled 21 August 2028 | Mendocino County (unincorporated): extension of data center moratorium to 21 August 2028 (Ordinance No. 4562) Primary source |
| City and County of San Francisco, California California | San Francisco Board of Supervisors Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | San Francisco: 45-day interim zoning moratorium on data center approvals (File No. 261021) Primary source |
| Unincorporated Pima County, Arizona Arizona | Pima County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | 22 September 2026 | Not stored as one date — see completion condition | Pima County (unincorporated): data center development moratorium (Resolution 2026-56) Primary source |
| City of Foley, Alabama Alabama | Foley City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Foley: six-month moratorium on data center and cryptocurrency mining applications Primary source |
| Unincorporated Lake County, Illinois Illinois | Lake County Board Local government | Local | Local construction moratorium | In effect | More than one stage | 8 September 2026 | Scheduled 11 May 2027 | Lake County (unincorporated areas): temporary moratorium on data centers Primary source |
| Unincorporated Mendocino County, California California | Mendocino County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 1 September 2026 | Not stored as one date — see completion condition | Mendocino County (unincorporated): data center moratorium imposed 1 September 2026 (Ordinance No. 4561) Primary source |
| Durham County, North Carolina North Carolina | Durham County Board of County Commissioners Local government | Local | Local construction moratorium | Adopted; effective status unverified | Construction | Effective status not verified | Not stored as one date — see completion condition | Durham County: nine-month moratorium on data centers over 100,000 square feet Primary source |
| Town of Brookhaven, New York New York | Brookhaven Town Board Local government | Local | Local construction moratorium | In effect | More than one stage | 27 August 2026 | Scheduled 31 December 2027 | Town of Brookhaven: data center moratorium through 31 December 2027 (Local Law No. 12-2026) Primary source |
| Unincorporated Pierce County, Washington Washington | Pierce County Council Local government | Local | Local construction moratorium | In effect | Permitting | 27 August 2026 | Not stored as one date — see completion condition | Pierce County: one-year pause on permits for data centers over 10 MW in unincorporated areas (Ord. O2026-557) Primary source |
| Town of Orangetown, New York New York | Orangetown Town Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Town of Orangetown: 180-day moratorium on data center and battery storage approvals (Local Law No. 5 of 2026) Primary source |
| Louisville/Jefferson County Metro, Kentucky Kentucky | Louisville/Jefferson County Metro Council Local government | Local | Local construction moratorium | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Louisville/Jefferson County Metro: temporary data center and telecommunications hotel moratorium Primary source |
| Town of Newport, New York New York | Newport Town Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Town of Newport: one-year pause on data center and cryptocurrency mining approvals (Local Law 4 of 2026) Primary source |
| Nance County, Nebraska Nebraska | Nance County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 11 August 2026 | Not stored as one date — see completion condition | Nance County: moratorium on data center construction and permits (Resolution #26-13) Primary source |
| Lucas County, Iowa Iowa | Lucas County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 5 August 2026 | Not stored as one date — see completion condition | Lucas County: one-year moratorium on data center permitting and construction (5 August 2026 resolution) Primary source |
| Tukwila, Washington Washington | Tukwila City Council Local government | Local | Local construction moratorium | In effect | Permitting | 3 August 2026 | Scheduled 3 August 2027 | Tukwila: one-year moratorium on applications for data centers over 20 MVA (Ordinance 2795) Primary source |
| Iowa County, Iowa Iowa | Iowa County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 31 July 2026 | Scheduled 31 July 2027 | Iowa County: 12-month moratorium on data center development applications (Resolution 2026-07-31) Primary source |
| Unincorporated Bannock County, Idaho Idaho | Bannock County Board of County Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 30 July 2026 | Scheduled 26 January 2027 | Bannock County: 180-day data center application moratorium Primary source |
| Worcester County, Maryland Maryland | Worcester County Commissioners Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Worcester County: 12-month pause on data center and cable landing station permits (Resolution 26-18) Primary source |
| Hillsboro, Oregon Oregon | Hillsboro City Council Local government | Local | Local construction moratorium | In effect | Permitting | 27 July 2026 | Scheduled 24 November 2026 | Hillsboro: 120-day pause on new data center land use applications Primary source · Archived copy (20 September 2026) |
| Sierra County, New Mexico New Mexico | Sierra County Board of County Commissioners Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Sierra County: 18-month moratorium on approval or support of data center development (Resolution 2026-51) Primary source |
| Borough of Sayreville, New Jersey New Jersey | Sayreville Borough Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Sayreville: 18-month moratorium prohibiting data center development in all zones (Ordinance #15-26) Primary source |
| City of Cleveland, Ohio Ohio | Cleveland City Council Local government | Local | Local construction moratorium | In effect | Permitting | 20 July 2026 | Not stored as one date — see completion condition | Cleveland: temporary moratorium on data center permits (Ord. 556-2026) Primary source |
| Van Buren County, Tennessee Tennessee | Van Buren County Commission Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Van Buren County: two-year data center moratorium resolution (Resolution 506) Primary source |
| Fillmore County, Nebraska Nebraska | Fillmore County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | 14 July 2026 | Scheduled 14 July 2028 | Fillmore County: 24-month moratorium on new data center applications (Resolution 2026-10) Primary source |
| Santa Fe County, New Mexico New Mexico | Santa Fe County Board of County Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 9 July 2026 | Scheduled 9 January 2028 | Santa Fe County: 18-month data center development-approval moratorium Primary source |
| Unincorporated DeKalb County, Georgia Georgia | DeKalb County Board of Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 7 July 2026 | Scheduled 30 March 2027 | DeKalb County (unincorporated): data center application moratorium extended to 30 March 2027 Primary source |
| Prince George's County, Maryland Maryland | Prince George's County Council Local government | Local | Local construction moratorium | In effect | Permitting | 7 July 2026 | Not stored as one date — see completion condition | Prince George's County: two-year pause on data center subdivision and site plans (CR-066-2026) Primary source |
| Independence, Missouri Missouri | Independence City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Independence: 180-day pause on new data center and battery storage permits and applications Primary source |
| Logan, Utah Utah | Logan Municipal Council Local government | Local | Local construction moratorium | In effect | Construction | 1 July 2026 | Not stored as one date — see completion condition | Logan: temporary land use regulation prohibiting data center development (Ord. 26-12) Primary source |
| Town of East Fishkill, New York New York | East Fishkill Town Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | East Fishkill: three-year data center moratorium (Local Law No. 3 of 2026) Primary source |
| Hernando County, Florida Florida | Hernando County Board of County Commissioners Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Hernando County: 365-day moratorium on data center development orders and permits (Ordinance 2026-15) Primary source |
| Hillsdale Township, Michigan Michigan | Hillsdale Township Board of Trustees Local government | Local | Local construction moratorium | In effect | Permitting | 24 June 2026 | Not stored as one date — see completion condition | Hillsdale Township: one-year moratorium on data center applications (Ordinance No. 2026-06-01) Primary source |
| City of Homewood, Alabama Alabama | Homewood City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Homewood: temporary moratorium on new large-scale data center applications and expansions Primary source |
| Woodbury County, Iowa Iowa | Woodbury County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 23 June 2026 | Scheduled 23 June 2027 | Woodbury County: 12-month moratorium on data center development applications (Resolution 14064) Primary source |
| Prairieville Township, Michigan Michigan | Prairieville Township Board of Trustees Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Prairieville Township: one-year moratorium on data center applications (Ordinance No. 187) Primary source |
| Coweta County, Georgia Georgia | Coweta County Board of Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 16 June 2026 | Scheduled 13 December 2026 | Coweta County: 180-day pause on new data center applications Primary source |
| Adams County, Iowa Iowa | Adams County Board of Supervisors Local government | Local | Local construction moratorium | In effect | More than one stage | 15 June 2026 | Scheduled 15 June 2028 | Adams County: 24-month moratorium on data center permits and approvals (Resolution 2026-25) Primary source |
| Seattle, Washington Washington | Seattle City Council Local government | Local | Local construction moratorium | In effect | Permitting | 11 June 2026 | Scheduled 11 June 2027 | Seattle: one-year emergency pause on data center applications Primary source |
| Lexington-Fayette Urban County, Kentucky Kentucky | Lexington-Fayette Urban County Council Local government | Local | Local construction moratorium | In effect | More than one stage | 9 June 2026 | Scheduled 31 October 2027 | Lexington-Fayette Urban County: data center zoning and permit pause extended to 31 October 2027 Primary source |
| Mason Township, Cass County, Michigan Michigan | Mason Township Board of Trustees Local government | Local | Local construction moratorium | In effect | Permitting | 8 June 2026 | Scheduled 8 June 2027 | Mason Township (Cass County): 12-month moratorium on data center applications (Ordinance No. 2026-01) Primary source |
| Charlotte and its extraterritorial jurisdiction, North Carolina North Carolina | Charlotte City Council Local government | Local | Local construction moratorium | In effect | Permitting | 8 June 2026 | Scheduled 18 October 2027 | Charlotte: data center application moratorium with an approved extension Primary source |
| Iron County, Utah Utah | Iron County Board of County Commissioners Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Iron County: 180-day pause on data center, data center power plant and solar applications (Ordinance 2026-13) Primary source |
| Town of New Denmark, Wisconsin Wisconsin | Town of New Denmark Town Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Town of New Denmark: one-year moratorium on approval and siting of data centers (Resolution 2026-04) Primary source |
| Unincorporated Boulder County, Colorado Colorado | Boulder County Board of County Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 2 June 2026 | Scheduled 2 December 2026 | Boulder County: six-month pause on data center and detention center planning applications Primary source |
| Cortland, Ohio Ohio | Cortland City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Cortland: pause of up to one year on data center permit applications (Ordinance O-21-26) Primary source |
| Lyndon Township, Michigan Michigan | Lyndon Township Board Local government | Local | Local construction moratorium | In effect | Permitting | 27 May 2026 | Not stored as one date — see completion condition | Lyndon Township: 12-month pause on data center permits and approvals (Resolution 26-06) Primary source |
| Denver, Colorado Colorado | Denver City Council Local government | Local | Local construction moratorium | In effect | Permitting | 21 May 2026 | Scheduled 21 May 2027 | Denver: one-year pause on data center zoning permits and site plans Primary source |
| Chesaning Township, Michigan Michigan | Chesaning Township Board of Trustees Local government | Local | Local construction moratorium | In effect | More than one stage | 18 May 2026 | Scheduled 18 May 2027 | Chesaning Township: 12-month data center moratorium (Ordinance No. 26-001) Primary source |
| Elko New Market, Minnesota Minnesota | Elko New Market City Council Local government | Local | Local construction moratorium | In effect | More than one stage | 14 May 2026 | Scheduled 13 May 2027 | Elko New Market: data center moratorium until 13 May 2027 (Interim Ordinance No. 345) Primary source |
| Florence Township (Erie County), Ohio Ohio | Florence Township Board of Trustees Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Florence Township (Erie County): 12-month pause on data center zoning permits (Resolution 2026-25) Primary source |
| Audubon County, Iowa Iowa | Audubon County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | 5 May 2026 | Scheduled 1 May 2027 | Audubon County: moratorium on commercial data center applications until 1 May 2027 (Resolution 2026-27) Primary source |
| Webster Township, Washtenaw County, Michigan Michigan | Webster Township Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Webster Township: one-year data center and battery storage moratorium (Ordinance No. 26-02) Primary source |
| Oklahoma City, Oklahoma Oklahoma | Oklahoma City Council Local government | Local | Local construction moratorium | In effect | More than one stage | 21 April 2026 | Scheduled 31 December 2026 | Oklahoma City: data center rezoning and permit moratorium to 31 December 2026 (emergency ordinance) Primary source |
| Luna Pier, Michigan Michigan | Luna Pier City Council Local government | Local | Local construction moratorium | In effect | Permitting | 11 April 2026 | Scheduled 11 April 2027 | Luna Pier: one-year moratorium on data center applications (Ordinance No. 251) Primary source |
| Comstock Charter Township, Michigan Michigan | Comstock Charter Township Board of Trustees Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Comstock Charter Township: one-year moratorium on data center applications (Ordinance No. 565) Primary source |
| Erie Township, Michigan Michigan | Erie Township Board Local government | Local | Local construction moratorium | In effect | Permitting | 16 March 2026 | Not stored as one date — see completion condition | Erie Township: one-year moratorium on data center applications (Ordinance No. 132) Primary source |
| Big Rapids Charter Township, Michigan Michigan | Big Rapids Charter Township Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Big Rapids Charter Township: one-year data center moratorium (Data Center Moratorium Ordinance) Primary source |
| Monclova Township, Ohio Ohio | Monclova Township Board of Trustees Local government | Local | Local construction moratorium | In effect | More than one stage | 17 February 2026 | Scheduled 17 February 2027 | Monclova Township: 12-month pause on data center applications and approvals (Resolution 02172026-01) Primary source |
| Unincorporated Chatham County, North Carolina North Carolina | Chatham County Board of Commissioners Local government | Local | Local construction moratorium | In effect | Permitting | 11 February 2026 | Scheduled 11 February 2027 | Chatham County: 12-month pause on data center and cryptocurrency mining permitting (File 26-0061) Primary source |
| Breckinridge County, Kentucky Kentucky | Breckinridge County Fiscal Court Local government | Local | Local construction moratorium | In effect | More than one stage | Effective date not stated in the source | Not stored as one date — see completion condition | Breckinridge County: 365-day pause on data centers Primary source |
| Unincorporated Johnson County, Iowa Iowa | Johnson County Board of Supervisors Local government | Local | Local construction moratorium | Superseded | More than one stage | 6 November 2025 | Ended 15 October 2026 | Johnson County: 2025 data-center approval pause, later extended Primary source |
| Barberton, Ohio Ohio | Barberton City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Barberton: council moratorium on data centers within the city (Ordinance No. 157-2025) Primary source |
| Prince George's County, Maryland Maryland | Prince George's County Council Local government | Local | Local construction moratorium | Expired | Permitting | 16 September 2025 | Ended 16 March 2026 | Prince George's County: six-month data center subdivision pause (CR-098-2025, expired) Primary source |
| Clarke County, Iowa Iowa | Clarke County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Construction | 23 June 2025 | Not stored as one date — see completion condition | Clarke County: temporary moratorium on data center construction (Resolution 25-011) Primary source |
| Unincorporated Nassau County, Florida Florida | Nassau County Board of County Commissioners Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Nassau County: 12-month pause on data center rezoning, permit and site plan applications (Ord. 2026-044) Primary source |
| Baltimore City, Maryland Maryland | Mayor and City Council of Baltimore Local government | Local | Local construction moratorium | In effect | Permitting | Several dates apply; see the source | Not stored as one date — see completion condition | Baltimore City: temporary citywide prohibition of data centers as a zoning use (Ord. 26-128) Primary source |
| Marengo Township, Michigan Michigan | Marengo Township Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Marengo Township: one-year data center moratorium (Ordinance No. 2026-1) Primary source |
| Meridian Charter Township, Michigan Michigan | Meridian Charter Township Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Meridian Charter Township: six-month moratorium on data center applications (Ordinance 2026-03) Primary source |
| City of Reno, Nevada Nevada | Reno City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | Permitting | Effective status not verified | Not stored as one date — see completion condition | Reno: pause on data center conditional use permit applications to 31 August 2027 (council resolution) Primary source |
| Town of Clifton Park, New York New York | Clifton Park Town Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Town of Clifton Park: 12-month moratorium on data storage center applications (Local Law No. 9 of 2026) Primary source |
| Town of DeWitt, New York New York | DeWitt Town Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Town of DeWitt: data center application moratorium through 31 December 2027 (Local Law No. 4-2026) Primary source |
| Town of York, New York New York | York Town Board Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Town of York: 12-month pause on data center land use approvals and permits (Local Law 3 of 2026) Primary source |
| City of Vermilion, Ohio Ohio | Vermilion City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Vermilion: data center development moratorium through 23 March 2027 (Ordinance 2026-17) Primary source |
| City of Memphis, Tennessee Tennessee | Memphis City Council Local government | Local | Local construction moratorium | Adopted; effective status unverified | More than one stage | Effective status not verified | Not stored as one date — see completion condition | Memphis: 135-day pause on new data center approvals (Substitute Ord. 5986), per the city Primary source |
| Nashville and Davidson County, Tennessee Tennessee | Metropolitan Council of Nashville and Davidson County Local government | Local | Local construction moratorium | Expired | Permitting | Effective date not stated in the source | Ended 31 July 2026 | Nashville and Davidson County (Metropolitan Government): temporary data center permit moratorium (BL2026-1448, ended) Primary source |
| Dane County, Wisconsin (towns under county zoning) Wisconsin | Dane County Board of Supervisors Local government | Local | Local construction moratorium | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Dane County: 18-month pause on hyperscale data center zoning permits Primary source · Archived copy (4 October 2026) |
| Madison, Wisconsin Wisconsin | Madison Common Council Local government | Local | Local construction moratorium | In effect | Permitting | Effective date not stated in the source | Not stored as one date — see completion condition | Madison: temporary pause on data center zoning certificates Primary source |
Download the policy dataset (JSON). Policy actions are not facility, project, claim, update, public-post or directory counts.