In plain English
Who it affects: This schedule covers data centers in Ohio Power's territory using more than 25,000 kW (kilowatts), at one location or across contracts, including movable facilities and cryptocurrency mining. Load signed by its effective date is Existing Load, including later expansions of up to 25,000 kW. Other later agreements are New Load. A larger expansion is New Load, and without separate metering the original load is too.
What it changes: During the initial contract, New Load owes minimum charges even if it reduces or ends service. Its billing demand, normally its highest 30-minute peak in a month, cannot fall below set floors. Unless both sides agree otherwise, it is billed on contract capacity even if service is never switched on.
Easy to misread: A request for service does not mean service starts at once: the schedule says service will not begin until Ohio Power has enough capacity to meet the contract.
- Size that brings a data center under the schedule: Aggregate monthly maximum demand of greater than 25,000 kW (1st Revised Sheet No. 223-1)
- New Load contract length: Not less than the Load Ramp Period plus 8 years; a 4-year ramp means 12 years (1st Revised Sheet No. 223-5)
- New Load minimum during the ramp: Monthly billing demand not less than 85% of the Load Ramp Contract Capacity (1st Revised Sheet No. 223-4)
- New Load minimum after the ramp: The greater of 85% of the highest monthly billing demand in the past 11 months, or Minimum Demand: for 25,001 kW to 75,000 kW of total contract capacity, 15,000 kW plus 85% of the amount over 25,000 kW; for 75,001 kW and above, 57,500 kW plus 100% of the amount over 75,000 kW, not above 85% of total contract capacity (1st Revised Sheet No. 223-4)
- Existing Load minimum: Monthly billing demand not less than 60% of (a) the customer contract capacity or (b) the highest monthly billing demand in the past 11 months (1st Revised Sheet No. 223-3)
- Leaving a New Load contract: After the fifth contract year following the ramp, by paying an exit fee equal to minimum charges for 36 months after notice (1st Revised Sheet No. 223-6)
Written from Ohio Power Company tariff book, P.U.C.O. No. 22, November 2026, Schedule DCT (1st Revised Sheets 223-1 to 223-8), read on 3 November 2026. A reading aid, not legal advice. The document controls.
Summary
AEP Ohio's Schedule DCT is the data center tariff in Ohio Power Company's current tariff book. It applies to data centers with an aggregate monthly maximum demand above 25,000 kW, sets minimum billing demand and long contract terms for new data center load, and requires, for new load, collateral of 50% of total minimum charges from customers that do not meet its credit tests. The sheets in the November 2026 tariff book are 1st Revised Sheets issued and effective on 28 August 2026, filed under the Commission's April 2026 rate-case order and its 5 August 2026 order in Case No. 26-113-EL-ATA. The schedule itself took effect earlier, after the Commission's order in Case No. 24-508-EL-ATA.
Scope
Schedule DCT (Data Center Tariff) in Ohio Power Company's tariff P.U.C.O. No. 22, 1st Revised Sheets 223-1 through 223-8, is available to customers that operate a Data Center, defined as a centralized facility used primarily or exclusively for electronic information services that has an aggregate monthly maximum demand of greater than 25,000 kW. For New Load, monthly billing demand during the load ramp may not be less than 85% of the Load Ramp Contract Capacity, contracts run at least the Load Ramp Period plus 8 years, and a customer may exit only after the fifth contract year following the ramp by paying an exit fee equal to 36 months of minimum charges. Service will not commence until the Company has sufficient capacity. The current sheets also carry interim procedures, under the Commission's 5 August 2026 Finding and Order in Case No. 26-113-EL-ATA, that apply until otherwise ordered by the Commission.
- Geographic scope
- AEP Ohio (Ohio Power Company) service territory, Ohio
- Jurisdiction
- Utility territory
- Authority type
- Utility
- Issuing authority
- Ohio Power Company (AEP Ohio)
Dates
- Adopted
- No adoption day is recorded
- Effective
- Several dates apply; see the source
- Scheduled expiration
- See completion condition
- Ended
- Not recorded as ended
- Completion condition
- The tariff sheets state no expiration. The interim standard-service-offer procedures apply until otherwise ordered by the Commission.
- Source document
- 28 August 2026
- Last checked
- 3 November 2026
About this date
This record was last checked before the tracker date, 16 November 2026. An earlier check date does not by itself mean the record's status has changed.
What this does not establish
- 28 August 2026 is the issue and effective date printed on the current revised sheets, not the first day the schedule applied. AEP Ohio's data center tariff page states that the tariff became effective on 23 July 2025; that date is not stored as this record's effective date.
- The tariff book file is named for November 2026 (November_2026_Ohio_Power_Tariff_Book.pdf, read on 3 November 2026) and may be replaced by a later monthly book at a different address; the October 2026 book address answered HTTP 404 on 3 November 2026.
- The Commission's approval of the original tariff pages is the separate record oh-puco-24-0508-el-ata-aep-schedule-dct-20250723.
- The schedule does not pause connections. It says service under it will not commence until the Company has sufficient capacity, and this record does not describe any customer's queue position.
Unresolved questions
- Whether the Commission's 30 September 2026 Entry on Rehearing in Case No. 26-113-EL-ATA, which the docket lists as denying the applications for rehearing (text not captured), or a later phase of that proceeding changes the interim procedures on sheet 223-5. The November 2026 book still prints those procedures.
- Outcome of the Supreme Court of Ohio appeal (Case No. 2025-1458) of the Commission's order in Case No. 24-508-EL-ATA.
Relationships
Supersession means a later instrument replaces the earlier legal effect. Repeal links identify the repeal instrument and the measure it ends. A later implementation or related letter is not treated as a replacement unless the record says so.
- Related, not a replacement PUCO denial of rehearing on the AEP Ohio data center tariff (In effect)
- Related, not a replacement PUCO interim SSO rules for AEP Ohio data center customers (In effect)
- Related, not a replacement PUCO approval of AEP Ohio data center tariff pages (In effect)
Sources
Primary source: Ohio Power Company (AEP Ohio) page on aepohio.com
- AEP Ohio data center tariff page โ utility summary; states the 23 July 2025 effective date
- Superseded September 2026 tariff book โ earlier copy of the same Schedule DCT sheets; answered HTTP 404 on 2 October 2026
- Superseded October 2026 tariff book โ earlier copy of the same Schedule DCT sheets; answered HTTP 404 on 3 November 2026