In plain English
Who it affects: Anyone proposing a data center as the main use of a property in Mesa. The standards prohibit it in every zoning district except General Industrial or Heavy Industrial land with a Planned Area Development overlay (an extra zoning layer), and then only if the City Council specifically permits it.
What it changes: The ordinance ends a 2023 zoning interpretation that treated data centers as indoor warehousing and storage, except on parcels with a waiver. Applicants must file water and sound studies and hold at least two neighborhood meetings. An overlay or special permit cannot change the development standards, apart from building height. A waiver lifts the zoning limit, not the standards.
Easy to misread: It does not reach data center projects approved, or with complete applications filed, before the effective date: those may proceed under the earlier rules even if they do not meet the new standards. Section 14 also says data centers in the Eastmark (Mesa Proving Grounds) Planned Community are not required to comply with these standards.
- Distance from homes: At least 400 feet from the property line of the nearest residential zoning district, residential use or other sensitive use, for the data center and all associated mechanical equipment (Section 11-31-36, Development Standards, item 2)
- Height: 60 feet maximum, including all associated equipment (Section 11-31-36, Development Standards, item 3)
- Sound limit: Sound from the data center may not exceed the ambient levels observed in the baseline study, at the property line of the nearest residential zoning district, residential use or other sensitive use (Section 11-31-36, Development Standards, item 4)
- Backup generator hours: 9:00 am to 5:00 pm, Monday through Friday, excluding holidays, unless supplying power during an outage or utility demand response event. Routine runs announced on a public website at least 24 hours ahead (Section 11-31-36, Operational Requirements, item 4)
- Smaller on-site data centers not covered: Serves only the enterprise functions of the on-site owner or tenant, leases no data services to third parties, and occupies no more than 10% of the total gross floor area of all buildings on the site (Section 11-31-36(A)(1))
- Waiver request: Written demand within three years of the effective date, by an owner who owned the parcel on that date, if it was zoned PEP, LI, GI, HI or DB-2 or was in listed parts of the Eastmark planned community (Ordinance No. 5957, Section 12)
Written from Ordinance No. 5957, as passed and adopted 8 July 2025, read on 3 November 2026. A reading aid, not legal advice. The document controls.
Summary
Mesa Ordinance No. 5957, passed and adopted by the City Council on 8 July 2025, makes data center a distinct land use that may be permitted only when the City Council specifically authorizes it while approving a Planned Area Development overlay district, and adopts location, design, screening and noise standards by reference. The ordinance takes effect thirty days after adoption, computed as 7 August 2025. It does not order an existing facility to close.
Scope
Mesa Ordinance No. 5957 amends the Mesa zoning ordinance to define data center as a distinct land use and provides in the land use tables that a data center may be permitted only if specifically authorized by the City Council at the time of approval of a Planned Area Development overlay district, with standards for location, design, screening and noise adopted by reference. Section 12 limits this to an overlay used in combination with General Industrial or Heavy Industrial zoning, and Section 14 says data centers within the Eastmark (Mesa Proving Grounds) Planned Community are not required to comply with Section 11-31-36. It is a City of Mesa zoning amendment and does not apply elsewhere in Arizona.
- Geographic scope
- Mesa, Arizona
- Jurisdiction
- Local
- Authority type
- Local government
- Issuing authority
- Mesa City Council
Dates
- Adopted
- 8 July 2025
- Effective
- 7 August 2025
- Scheduled expiration
- See completion condition
- Ended
- Not recorded as ended
- Completion condition
- The ordinance states no expiration. Its effective date is thirty days after adoption; 7 August 2025 is computed from the 8 July 2025 adoption.
- Source document
- 8 July 2025
- Last checked
- 3 November 2026
About this date
This record was last checked before the tracker date, 16 November 2026. An earlier check date does not by itself mean the record's status has changed.
What this does not establish
- 7 August 2025 is computed from Section 10 (effective thirty days after adoption); the ordinance does not print the calendar day.
- The Section 11-31-36 standards adopted by reference (Resolution No. 12395) were read as an attachment to Legistar matter 25-0589, not as a stamped clerk copy.
- Later amendments were not checked.
Unresolved questions
None recorded.
Relationships
Supersession means a later instrument replaces the earlier legal effect. Repeal links identify the repeal instrument and the measure it ends. A later implementation or related letter is not treated as a replacement unless the record says so.
- No related action is recorded.
Sources
Primary source: Mesa City Council page on mcclibraryfunctions.azurewebsites.us
- Section 11-31-36 standards, attachment to Legistar matter 25-0589 — standards adopted by reference; read on 3 November 2026; not a stamped clerk copy