Plain-English guide · Types of data center

Types of data center

A campus built by one internet company, a leased colocation building, a landlord’s building where networks meet, an organization’s own computer room and a small site out on a network work in different ways. Each page shows how power and heat move through one, how it differs from the others and what to ask about it.

Choose a site to explore

Start with a drawing, then turn the model and walk through its parts, power and cooling. These are illustrations of types, not plans of particular facilities. Layouts vary; the drawings are not to scale.

The pictures illustrate parts, not relative size, capacity or efficiency. These categories can overlap. Follow power or cooling to read the steps, then open a step in 3D.

What the sources say differs

Hyperscale campus and Colocation and leased campuses

Hyperscale campus and Carrier hotel (telecom hotel)

These guides do not make a direct comparison of this pair. Use the individual definitions and questions above; no additional difference is inferred here.

Hyperscale campus and Enterprise and government

Hyperscale campus and Edge sites

  • Assumption in Lawrence Berkeley National Laboratory’s 2024 model: A national lab’s model treats edge sites as small, with lower power-supply efficiency and narrower temperature ranges.[1] That is an assumption about categories, not a ranking. Read in the Hyperscale campus guide
  • A hyperscale site is built at massive scale. Edge sites are small and placed out across a network.[1] Read in the Edge sites guide

Colocation and leased campuses and Carrier hotel (telecom hotel)

Colocation and leased campuses and Enterprise and government

Colocation and leased campuses and Edge sites

These guides do not make a direct comparison of this pair. Use the individual definitions and questions above; no additional difference is inferred here.

Carrier hotel (telecom hotel) and Enterprise and government

These guides do not make a direct comparison of this pair. Use the individual definitions and questions above; no additional difference is inferred here.

Carrier hotel (telecom hotel) and Edge sites

  • A carrier hotel is a landlord’s building with many tenants. A telecom edge site is the communications company’s own equipment.[1] Read in the Edge sites guide

Enterprise and government and Edge sites

  • Branch-office closets and server rooms are smaller still, and are counted separately.[1] Read in the Enterprise and government guide
  • Federal reporting draws a line here: the budget office treats small server closets and telecom closets as spaces not designed to be data centers.[3] That is federal reporting only, and it does not decide what counts as an edge site elsewhere. Read in the Edge sites guide

The five types on these pages

Types of data center, what each one is, and one example
TypeWhat it isOne example
Hyperscale campusHyperscale data centers are large-scale facilities built and run by major technology companies that deploy internet services and platforms at massive scale. This page calls a site with several of these buildings a campus.[1]Meta Richland Parish Data Center
Colocation and leased campusesA colocation data center, also called multitenant, rents space to companies that host their own hardware there, with power, cooling, security and networking provided.[1]Polaris Forge 1
Carrier hotel (telecom hotel)A carrier hotel, or telecom hotel, is a building where a commercial landlord rents floor space to many network companies, as a 2003 federal report defined it.[2]60 Hudson Street
Enterprise and governmentAn enterprise data center is run by an organization, internally, for its own use.[1]VELCO New Haven Operations Facility
Edge sitesAn edge site is a small place to run computing out across a network: a closet, a small room or a very small data center.[1]Greensparc Cordova Data Center (Humpback Creek Hydro)

These pages use 5 examples chosen by hand. Most records on this site are not typed. 3,110 of the 3,115 source listings on the opening map have no type assigned here. Listings can overlap, so neither number counts distinct data centers.

AI workloads and on-site power do not have pages of their own. Both are covered inside the hyperscale page: AI workloads and on-site power.

Closer looks at parts of a site

Go further on this site

How data centers work · The 3D map · The full map

Sources

  1. 2024 United States Data Center Energy Usage Report (LBNL-2001637). Lawrence Berkeley National Laboratory. National laboratory. Cited at Table 4.1, p. 36; p. 36; p. 42; pp. 42-43; p. 38; p. 35; p. 37. Captured 3 November 2026.
  2. Vulnerabilities Task Force Report, Concentration of Assets: Telecom Hotels. President's National Security Telecommunications Advisory Committee, hosted by CISA. Government. Cited at section 3.0, pp. 1-2; section 3.0. Captured 3 November 2026.
  3. M-19-19, Update to Data Center Optimization Initiative. Executive Office of the President, Office of Management and Budget. Government. Cited at p. 4. Captured 3 November 2026.

Each type’s page lists all of its own sources.