PPL Electric Utilities service territory, Pennsylvania

PPL Rate Schedule LP-6 for large load (data center) interconnections

Enacted legislation or regulation

In effect This instrument is recorded as currently in effect as of the dataset date.

In plain English

Who it affects: This covers PPL Electric data center customers starting service on or after 1 October 2025 at 69,000 volts or higher, peaking at 50 MW or more at one facility or at least 75 MW combined within 10 miles. A 50 to 75 MW facility causing no transmission network upgrade costs could move to Rate LP-5 with commission approval.

What it changes: Each customer pays on the greater of its actual peak or a set share of its planned load, even if it uses less. Leaving early means an exit fee: the remaining minimum load guarantee or remaining security obligation, whichever is greater. Choosing interruptible instead of firm service cuts the minimum to 60% for five years, then 30% for five.

Easy to misread: The $999.11 monthly customer charge is not the whole bill: transmission and generation supply charges apply under separate rate schedules.

  • Size and voltage: Supplied from lines of 69,000 volts or higher, with peak demand of 50 MW or greater at a single facility, or at least equal to 75 MW in the aggregate among facilities at or above 69 kV within a 10-mile radius (First Revised Page No. 35C)
  • Start of service: On or after 1 October 2025 (First Revised Page No. 35C)
  • Minimum agreement length: Initial term of not less than ten years (First Revised Page No. 35D)
  • Security: Equal to the cost of upgrades needed to serve the customer that are placed into rate base and recovered through transmission rates (First Revised Page No. 35D)
  • Minimum load payment: The greater of actual peak demand or 80% of the load ramp schedule until the security obligation is satisfied; after that, 80% for the first five years of the initial term and 50% for the second five years (First Revised Page No. 35E)
  • Universal service costs: $11 million of Universal Service Rider costs allocated annually to Rate Schedule LP-6, beginning 1 January 2027 (First Revised Page No. 20)

Written from PPL Electric Utilities tariff, Supplement No. 2 to Electric Pa. P.U.C. No. 202, Rate Schedule LP-6 (pages 35C to 35F), read on 3 November 2026. A reading aid, not legal advice. The document controls.

Summary

PPL Electric Utilities' Rate Schedule LP-6, in effect from 1 July 2026, is a distribution rate class for large load (data center) customers taking service at 69 kV or above with at least 50 MW at one facility or 75 MW in aggregate nearby. It requires a service agreement of at least ten years with a load ramp schedule, security equal to upgrade costs placed in rate base, and minimum payment terms, and it assigns the class $11 million a year of Universal Service Rider costs, for programs for residential customers, from 2027. It is a utility tariff, and it says the Pennsylvania PUC approved it in an order entered on 11 June 2026.

Scope

PPL Electric Utilities' Rate Schedule LP-6, Large Load Interconnections (First Revised Page No. 35C, Supplement No. 2 to Electric Pa. P.U.C. No. 202, effective 1 July 2026), applies to large load (data center) customers served at 69 kV or higher that began service on or after 1 October 2025 with peak demand of 50 MW or more at one facility or at least 75 MW in aggregate within a 10-mile radius. Each LP-6 customer must sign an Electric Service Agreement with an initial term of at least ten years, a load ramp schedule and security for upgrade costs, and from 1 January 2027 the LP-6 class is allocated $11 million a year of Universal Service Rider costs.

Geographic scope
PPL Electric Utilities service territory, Pennsylvania
Jurisdiction
Utility territory
Authority type
Utility
Issuing authority
PPL Electric Utilities Corporation (tariff filed with the Pennsylvania Public Utility Commission)

Dates

Adopted
No adoption day is recorded
Effective
1 July 2026
Scheduled expiration
See completion condition
Ended
Not recorded as ended
Completion condition
The tariff page states no end date.
Source document
30 June 2026
Last checked
3 November 2026
About this date

This record was last checked before the tracker date, 16 November 2026. An earlier check date does not by itself mean the record's status has changed.

What this does not establish

  • The Pennsylvania PUC order approving the tariff (rate case Docket No. R-2025-3057164) was not opened: the puc.pa.gov robots.txt did not respond, so the site was not accessed automatically.
  • The page is a First Revised page canceling an Original Page No. 35C; when LP-6 first took effect was not established.
  • Rates and all ESA terms beyond those quoted are not restated.

Unresolved questions

None recorded.

Relationships

Supersession means a later instrument replaces the earlier legal effect. Repeal links identify the repeal instrument and the measure it ends. A later implementation or related letter is not treated as a replacement unless the record says so.

  • No related action is recorded.

Sources

Primary source: PPL Electric Utilities Corporation (tariff filed with the Pennsylvania Public Utility Commission) page on pplelectric.com