Delmarva Power & Light Company service territory, Delaware

Delmarva interconnection pause for prospective loads of 25 MW or more

Grid-interconnection pause

In effect This instrument is recorded as currently in effect as of the dataset date.

Scope

Ordering paragraph 4 of Delaware Public Service Commission Order No. 10816 requires a revised large load tariff to be in place before Delmarva Power & Light Company interconnects prospective large load customers in its Delaware service territory whose monthly maximum demand is 25 megawatts or greater and who were not already interconnected when the order was entered. The class includes data centers but is not limited to them.

Geographic scope
Delmarva Power & Light Company service territory, Delaware
Jurisdiction
State
Authority type
Regulator or commission
Issuing authority
Delaware Public Service Commission

Dates

Adopted
3 September 2025
Effective
3 September 2025
Scheduled expiration
See completion condition
Ended
Not recorded as ended
Completion condition
The condition lasts until a revised large load tariff is in place. The order states no calendar end date, and whether the condition has since been lifted was not established.
Source document
3 September 2025
Last checked
23 September 2026 (earlier than tracker date 5 October 2026; not an automatic status change)

Summary

Delaware Public Service Commission Order No. 10816, entered on 3 September 2025, requires Delmarva Power & Light Company to have a revised large load tariff in place before interconnecting prospective Delaware customers with monthly maximum demand of 25 MW or more. It is a current interconnection condition for a broad large-load class that includes, but is not limited to, data centers. The tariff proceeding is recorded separately.

What this does not establish

  • The same source instrument also opens the separately recorded tariff proceeding; this record covers only the operative interconnection pause.
  • The order applies to all prospective Delmarva Delaware customers at or above the 25 MW threshold, not only data centers.
  • The official docket system is disallowed by its robots.txt for automated review, so whether a later order lifted this condition was not established from the complete docket.
  • The order's recital names the utility 'Delmarva Light & Power Company'; the ordering paragraphs use DPL.

Unresolved questions

  • Whether a revised tariff is now in place and the ordering-paragraph 4 interconnection condition has been lifted was not established.

Relationships

Supersession means a later instrument replaces the earlier legal effect. Repeal links identify the repeal instrument and the measure it ends. A later implementation or related letter is not treated as a replacement unless the record says so.

Sources

Primary source

https://depsc.delaware.gov/wp-content/uploads/sites/54/2025/09/Regular-Item-5d-Docket-25-0826-Order-10816-09-03-2025.pdf