State, local and federal policy

Texas policy actions

Recorded policy actions for Texas. This is not a finding about every local government in the state.

Texas overview · Texas source listings over time, in 3D

Texas: Temporary approval and permit pauses pending reviews—not a permanent ban on existing facilities.

How the Texas actions fit together

These Texas records are related instruments. None is recorded as superseding another. Together, the approval and permit directives are a temporary approval and permit pause pending an audit. This is not a permanent ban on existing facilities. The 3 August 2026 letter tells the Public Utility Commission and ERCOT to audit data centers advancing through ERCOT interconnection before any additional data centers are approved to move forward. It states no end date. ERCOT's 3 August 2026 market notice postponed Batch Zero classification of large loads past 7 August 2026. ERCOT's 20 August 2026 presentation says energization approvals are paused for data centers and virtual-currency mining facilities of 75 MW or greater until Batch Zero eligibility verification is complete. The 14 September 2026 board update says that pause continues until the verification and audit and the community-impact review are complete. Those materials give 10 December 2026 as a report-filing goal, not as a legal expiration. That energization pause does not, on ERCOT's description, apply to non-data-center large loads or to medium loads. The 21 September 2026 letter tells TCEQ to halt permits sought by data centers until ERCOT completes its review, and it says no other state agency should move regulatory approvals forward until the requested information is acquired. 19 October 2026 is a compliance-update date, not an expiration. The same letter says the governor will seek legislation to eliminate data-center financial incentives. That legislation is not recorded as enacted. The Comptroller was still describing the sales-tax exemption program on 22 September 2026. The Public Utility Commission's rule 16 TAC section 25.194, adopted on 18 September 2026 with an effective date of 8 October 2026, implements Senate Bill 6 for large loads generally; it is a separate instrument and does not end these pauses. ERCOT's 14 September 2026 request for information (M-B091426-01) sets a 12 October 2026 response date; that is a response deadline, not an expiration. TCEQ's 19 October 2026 letter says the agency has paused issuance of permits for infrastructure directly supporting data centers and is screening pending applications. The STEERS page marked modified on 22 October 2026 says that filing system is temporarily down for that review. Neither document ends the pause or lists individual permits. 19 October 2026 remains a compliance-update date, not an expiration.

Showing recorded actions for Texas only. This is not a finding about every local government in the state.

Filter records issued for Texas

Status and action type combine within this jurisdiction. The lifecycle headings show published totals; the result below counts matches. Federal and multistate instruments remain separate.

Choose both filters

13 published records issued for this jurisdiction.

12 records

Current

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

TCEQ data-center permit pause

In effect This instrument is recorded as currently in effect as of the dataset date.

Geographic scope
Texas
Jurisdiction
State
Issuing authority
Governor of Texas
Effective
21 September 2026

Primary source

ERCOT large-load interconnection pause

In effect This instrument is recorded as currently in effect as of the dataset date.

Geographic scope
ERCOT region in Texas
Jurisdiction
Regional grid
Issuing authority
Electric Reliability Council of Texas
Source document
20 August 2026

Primary source

Data center sales-tax exemption

In effect This instrument is recorded as currently in effect as of the dataset date.

Geographic scope
Texas
Jurisdiction
State
Issuing authority
Texas Comptroller of Public Accounts
Last checked
23 September 2026

Primary source

0 records

Pending or nonbinding

No pending or nonbinding record issued for Texas is published in this tracker.

History

1 record

Expired, repealed, vetoed, failed, blocked, superseded and completed measures remain visible without being presented as current.

2 federal or multistate records

Federal and multistate instruments that cover all or part of Texas

These federal, reliability-organization and multistate grid or utility instruments are stored once and listed for every jurisdiction they name. They do not add to the record count, in-effect total or map shading for Texas. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.

Federal and multistate instruments that cover all or part of Texas
ScopeAuthorityJurisdictionActionStatusStageEffectiveTimingRecord
Southwest Power Pool region (multistate)
Listed coverage: part of Texas · Covered jurisdictions
Federal Energy Regulatory Commission
Regulator or commission
Regional gridEnacted legislation or regulationIn effectInterconnection1 July 2026No expiration date recordedSouthwest Power Pool: Conditional High Impact Large Load Service accepted by FERC (ER26-1323)
Primary source
Southwest Power Pool region (multistate)
Listed coverage: part of Texas · Covered jurisdictions
Federal Energy Regulatory Commission
Regulator or commission
Regional gridEnacted legislation or regulationIn effectInterconnection15 January 2026No expiration date recordedSouthwest Power Pool: High Impact Large Load study processes accepted by FERC (ER26-247)
Primary source
More national filters: authority and jurisdiction

Download the policy dataset (JSON). Policy actions are not facility, project, claim, update, public-post or directory counts.