Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Iowa
Review scope: Board communication read 1 November 2026
Evidence and limits
Evidence limitation: Microsoft's actual daily or annual water use in the West Des Moines system, the signed and dated agreement (the attachment is the form with a blank effective date), and whether the limitation period has ended.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Partially supported
Said by LG&E and KU · Kentucky
Review scope: Tariff, order and company page read 1 November 2026
Partially supported because only Louisville Gas and Electric's Rate EHLF tariff was checked; Kentucky Utilities' parallel tariff was not read.
Evidence and limits
Evidence limitation: Kentucky Utilities' parallel EHLF tariff was not read. Which customers have signed EHLF agreements and on what terms; agreements are to be filed with the Commission.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Entergy Louisiana · Meta Richland Parish Data Center
Review scope: Release and transcript read 1 November 2026
Evidence and limits
Evidence limitation: The electric service agreement's full terms, what Meta pays, and costs after the 15-year term. The written Order No. U-37425 could not be read; its terms here come from the session transcript.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Partially supported
Said by the Minnesota Public Utilities Commission · Minnesota
Review scope: Statute and PUC page read 1 November 2026
Borne out for new very large customers; the PUC's sentence omits the law's exemptions and its class definition, due by 15 December 2026 (issuance not verified).
Evidence and limits
Evidence limitation: The Commission's definition of the very large customer class, which existing data center agreements fall under the subdivision 3 exemption, any approved data center tariff or agreement, and whether specific upgrade costs have been charged to a data center.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Partially supported
Said by the Missouri Public Service Commission · Missouri
Review scope: PSC page and bill text read 1 November 2026
Evidence and limits
Evidence limitation: The text of the Commission's orders approving the Ameren Missouri and Evergy large load tariffs, including the 12-year minimum term and collateral terms the PSC describes; those orders could not be read.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Contradicted
Said by Mississippi Development Authority (Executive Director) · Mississippi
Review scope: Releases read 1 November 2026
Evidence and limits
Evidence limitation: How much Amazon has actually spent in Mississippi and how many direct jobs are filled. Any state incentive agreement terms for these projects were not read.
Read the answer and sources →
Checked 1 November 2026
Checked earlier: claims 7–261 October 2026 – 1 November 2026
Public statement checked
Verdict on the wording above: Partially supported
Said by Office of the Governor of North Carolina · North Carolina
Review scope: Release and interim report read 1 November 2026
Evidence and limits
Evidence limitation: The Energy Futures Group report behind the release's $50 billion figure, and the Task Force's next report, due 15 February 2027; the Task Force's work continues through December 2028.
Read the answer and sources →
Checked 1 November 2026
Documented fact
Verdict on the wording above: Supported
Said by the New Jersey Economic Development Authority · New Jersey
Review scope: NJEDA documents read 1 November 2026
Supported refers to the approval and its amount; it is not evidence that any credit has been issued or used.
Evidence and limits
Evidence limitation: CoreWeave's committed capital investment and job numbers, the board memo for this award, whether the project has been certified complete, whether any tax credit certificate has been issued or used, and whether the specially adopted rules were made permanent before their 23 September 2026 expiration date.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Partially supported
Said by Homer City Generation · Pennsylvania
Review scope: Developer release and DEP page read 1 November 2026
Evidence and limits
Evidence limitation: The text of Plan Approval 32-00457A (number and rating of turbines, permitted capacity), DEP's comment response on data center scope, whether construction has begun, whether power production will start in 2027, and any data center tenant. The plan approval documents could not be read.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Partially supported
Said by Greater Memphis Chamber · Tennessee
Review scope: Chamber release and MLGW update read 1 November 2026
Evidence and limits
Evidence limitation: Metered load at the site, whether the second 150 MW has since been approved and energized, and the substation numbering, which MLGW's update does not give.
Read the answer and sources →
Checked 1 November 2026
Documented fact
Verdict on the wording above: Supported
Said by Utah Legislature (S.B. 132, 2025 General Session) · Utah
Review scope: Enrolled bill read 1 November 2026
Evidence and limits
Evidence limitation: Which data center contracts have been filed or approved under the law, and how incremental costs have been calculated in practice.
Read the answer and sources →
Checked 1 November 2026
Public statement checked
Verdict on the wording above: Partially supported
Said by Loudoun County · Virginia
Review scope: County pages and adopted budget summaries read 1 November 2026
Partially supported means the 40% figure fits the adopted General Fund; it does not fit the $5.4 billion the county calls its budget, and the $1.3 billion was not independently confirmed.
Evidence and limits
Evidence limitation: The adopted budget's data center revenue lines (the $1.3 billion figure was not found in the adopted documents read) and which base the county meant by 'total budget'.
Read the answer and sources →
Checked 1 November 2026
Question reviewed
Verdict on the statement above: Supported
Question examined by DataCenterData · Arizona
Question: Did APS customers pay $587 million for data-center growth?
Answer to the question: A cost shift has not been established here. The attorney general requested an investigation into an analyst’s allegation about large users, including data centers. APS disputes it. Billing evidence and a commission determination were not reviewed.
Evidence and limits
Supported means these documents describe a dispute, not proof of a $587 million cost shift.
The financial question remains unresolved here. The underlying analysis, billing records and a commission determination were not reviewed.
Evidence limitation: The underlying analysis, billing and PSA records, and a commission determination were not reviewed. The allegation concerns large energy users including data centers; it is not an established data-center-only charge to residential customers. These sources do not determine which financial interpretation is correct or establish present regulator status.
Read the answer and sources →
Checked 12 October 2026
Question reviewed
Verdict on the statement above: Supported
Question examined by DataCenterData · Global AI (Colorado), LLC Data Center Project
Question: Does GlobalAI’s Weld County project need only 6,500 gallons of water a year?
Answer to the question: The complaint filed October 6 says GlobalAI represented that its closed-loop cooling system would require a 65,000-gallon initial fill and 6,500 gallons of annual replenishment. The plaintiffs allege that total water demand—including other site uses and periodic refills—was not quantified. The filing describes a cooling-replenishment figure, not a verified total for annual site water use.
Evidence and limits
Supported refers to this reading of the complaint. It does not verify the company’s figures, total site water use, the plaintiffs’ allegations or a court finding.
This is a party’s description of the Phase 1 application. Original applicant records and total site water demand were not reviewed.
Evidence limitation: These are a litigating party's descriptions and allegations about the Phase 1 application. The underlying applicant documents, hearing record, approval conditions and water-service agreements were not reviewed. Nothing here establishes measured use, total future demand, filing authenticity through the court docket, present litigation status or a court finding.
Read the answer and sources →
Checked 12 October 2026
Question reviewed
Verdict on the statement above: Supported
Question examined by DataCenterData · Illinois
Question: What does the Illinois study mean by “121,000 jobs”?
Answer to the question: Figure 8 separates 112,950 construction-related job-years over 2026–2035 from 7,998 annual operations-related jobs in 2035, including 2,819 permanent positions. These use different time units. They are forecasts, not 121,000 permanent jobs or a count of distinct workers. This check establishes what the report says; it does not validate its model or verify delivered jobs.
Evidence and limits
Supported refers to this explanation of the report’s figures, not proof that the forecast jobs will happen.
These are forecasts. This review does not establish delivered jobs, distinct workers, or whether the economic model is accurate.
Evidence limitation: Whether these projected jobs are delivered, the number of distinct construction workers, and independent validation of the economic model. The study’s employment forecast is not a measured payroll count.
Read the answer and sources →
Checked 12 October 2026
Documented fact
Verdict on the wording above: Supported
Said by the Delaware Public Service Commission · Delaware
Review scope: Delaware PSC documents captured 5 October 2026
Evidence and limits
Evidence limitation: Whether the Commission has approved a Delmarva large-load tariff, its terms, and whether any 25 MW-plus customer has been interconnected or has an interconnection date. The text of Order 10829, Delmarva's Dec 2025 tariff filing and the Hearing Examiner's findings were not read. Docket 25-0826 on DelaFile was not retrieved. No reviewed document in the sources checked establishes it.
Read the answer and sources →
Checked 5 October 2026
Documented fact
Verdict on the wording above: Supported
Said by Georgia Department of Revenue · Georgia
Review scope: Department pages captured 5 October 2026
Evidence and limits
Evidence limitation: The county threshold numbers (in the two linked PDFs, not captured), the number of certificates issued, the amount of tax exempted for any project, and jobs actually created and maintained. The Department's annual-report requirement was only seen as a link. No reviewed document in the sources checked establishes it.
Read the answer and sources →
Checked 5 October 2026
Documented fact
Verdict on the wording above: Supported
Said by the City of Gilroy · Gilroy Data Center
Review scope: City of Gilroy project page captured 5 October 2026
Evidence and limits
Evidence limitation: Any state, county or utility incentive, tax credit or discount; the ordinance, development agreement or conditions of approval that would document the absence of a city abatement; actual assessed value and taxes paid after operations begin. No reviewed document in the sources checked establishes it.
Read the answer and sources →
Checked 5 October 2026
Documented fact
Verdict on the wording above: Not yet due
Said by the City of Gilroy · Gilroy Data Center
Review scope: City of Gilroy project page captured 5 October 2026
Evidence and limits
Evidence limitation: Measured potable or recycled water use after opening; the recycled-water volume; the recycled-water agreements' terms and whether they were completed; the Water Supply Assessment (the page lists it as Appendix O of the environmental review, not read); and the conditions-of-approval text.
Read the answer and sources →
Checked 5 October 2026
Documented fact
Verdict on the wording above: Supported
Said by Kansas Legislature (K.S.A. 66-101j) · Kansas
Review scope: Statute text captured 5 October 2026
Evidence and limits
Evidence limitation: The definition of qualified data center in K.S.A. 74-50,331 and its thresholds; whether any Kansas utility serves a data center under a commission-approved contract rate outside this section; what tariff or contract any named Kansas project, including the tracked Beale Data Center record, would take service under; and the 'cooperative' exclusion's effect on data centers served by cooperatives. No reviewed document in the sources checked establishes it.
Read the answer and sources →
Checked 5 October 2026
Documented fact
Verdict on the wording above: Supported
Said by Governor of Maryland · Maryland
Review scope: Executive order text captured 5 October 2026
Evidence and limits
Evidence limitation: Whether the Task Force has issued any Framework Determination, Framework Guidance or Dashboard listing, and whether any data-center project has applied for a State incentive under the order. Which specific Maryland incentive programs are discretionary within the order's meaning, and whether any statutory by-right incentive is outside it. The Next Generation Energy Act of 2025 and Utility RELIEF Act of 2026, which the order cites, were not read. No reviewed document in the sources checked establishes it.
Read the answer and sources →
Checked 5 October 2026
Documented fact
Verdict on the wording above: Supported
Said by Governor of Nevada · Nevada
Review scope: Executive order text captured 5 October 2026
Evidence and limits
Evidence limitation: Which applications are pending, whether any application has been brought to the Board under the order, and what rate or amount any approved abatement carries. The published standard form of the Community Support Commitment (due 2026-11-06) was not found in the sources checked. Whether the 4.6 percent combined rate equals the ordinary statewide combined rate was not established from the documents read. No reviewed document in the sources checked establishes it.
Read the answer and sources →
Checked 5 October 2026
Question reviewed
Verdict on the wording above: Partially supported
Question examined by DataCenterData · Ohio
Evidence and limits
Evidence limitation: Whether generation, transmission, capacity-market, wholesale-market or pre-tariff contracts can affect household bills remains a separate question from this tariff arithmetic. The saved record holds the tariff sheets and the PUCO docket listing, not a PUCO or Ohio Consumers' Counsel analysis of household bill effects and not the text of the 5 August 2026 order or the 30 September 2026 entry on rehearing.
Read the answer and sources →
Checked 3 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by EdgeCore Digital Infrastructure · Nevada
Review scope: EdgeCore Reno page checked 1 October 2026
Evidence and limits
Evidence limitation: The completion year. Whether any building or substation is finished. Utility capacity as distinct from the 216 MW critical IT figure. Measured water use.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Google · Texas
Review scope: Google PDF and blog checked 1 October 2026
Evidence and limits
Evidence limitation: Measured withdrawal, consumption, discharge, or make-up water. Whether the air-cooling design is built. What the $10 million fund spends, and where.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Google · Texas
Review scope: Google PDF and blog checked 1 October 2026
Evidence and limits
Evidence limitation: Whether any of that generation is built, energized, or metered. The split of the gigawatt figure among wind, solar, and batteries. The capacity of the on-site gas. Data-center IT load. Hourly matching between generation and the data center.
Read the answer and sources →
Checked 1 October 2026
Checked earlier: claims 27–4621 September 2026 – 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Google · Texas
Review scope: Google PDF checked 1 October 2026
Evidence and limits
Evidence limitation: The tariff, rate, or interconnection agreement that would show who pays. Any later bill or regulator order.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Google · Texas
Review scope: Google PDF and blog checked 1 October 2026
Evidence and limits
Evidence limitation: A counted permanent headcount, construction payroll, or opening date. How many of the stated jobs are at the data center rather than the company-wide multiplier.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by TotalEnergies · Texas
Review scope: TotalEnergies release checked 1 October 2026
Evidence and limits
Evidence limitation: The individual Clearway contracts, their dates, and whether any energy is generated or matched to a named facility. The linked social post was inaccessible; its wording was not reviewed.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by TotalEnergies · Texas
Review scope: TotalEnergies release checked 1 October 2026
Evidence and limits
Evidence limitation: Whether the plants are built or the energy is generated. Which Google facility takes it. Hourly or physical matching. The contract text itself.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Vantage Data Centers · Virginia
Review scope: Vantage campus page checked 1 October 2026
Evidence and limits
Evidence limitation: Whether construction has started, any building is operating, or the stated IT load, area, or water-use figure has been measured. Utility power is a separate figure on the same page.
Read the answer and sources →
Checked 1 October 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · Virginia
Review scope: Vantage campus page checked 1 October 2026
Evidence and limits
Evidence limitation: The wording of the unopened social post and wire release. Any permit or company record that states a phase size or a job count.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Vantage Data Centers · Virginia
Review scope: Vantage campus page checked 1 October 2026
Evidence and limits
Evidence limitation: Whether the substation is built or energized, and any utility filing that states its capacity.
Read the answer and sources →
Checked 1 October 2026
Public statement checked
Verdict on the wording above: Company claim
Said by DataBank · Virginia
Review scope: DataBank pages captured 25 September 2026
Evidence and limits
Evidence limitation: Whether either building is under construction or operating. Utility power. Metered load. The wording of the unopened construction post.
Read the answer and sources →
Checked 25 September 2026
Public statement checked
Verdict on the wording above: Unknown
Said by the City of Hammond · CoreWeave / Digital Crossroads expansion
Evidence and limits
Evidence limitation: Whether the $25 million was ever written into an executed instrument; the executed agreement, the extension resolutions and any City payment ledger are not in the saved record.
Read the answer and sources →
Checked 21 September 2026
Public statement checked
Verdict on the wording above: Outdated
Said by the City of Hammond · CoreWeave / Digital Crossroads expansion
Evidence and limits
Evidence limitation: The executed agreement and its payment-trigger clauses, the two extension resolutions, which milestones failed and any City payment ledger are not in the saved record; whether any payment was ever due or made is not established.
Read the answer and sources →
Checked 21 September 2026
Public statement checked
Verdict on the wording above: Outdated
Said by the City of Hammond · CoreWeave / Digital Crossroads expansion
Evidence and limits
Evidence limitation: The executed agreement, any separate abatement or deduction instrument (and whether one was ever adopted, claimed or received), the extension resolutions and any payment or abatement ledger are not in the saved record.
Read the answer and sources →
Checked 21 September 2026
Public statement checked
Verdict on the wording above: Unknown
Said by the City of Hammond · CoreWeave / Digital Crossroads expansion
Evidence and limits
Evidence limitation: Whether a NIPSCO agreement was ever executed, and which milestones failed; the executed development agreement, the extension resolutions and any NIPSCO filing for this expansion are not in the saved record.
Read the answer and sources →
Checked 21 September 2026
Public statement checked
Verdict on the wording above: Supported
Said by the City of Gilroy · Gilroy Data Center
Evidence and limits
Evidence limitation: Critical IT capacity; measured load; owner/operator legal roles distinct from applicant; actual occupancy or opening date (the city's revenue FAQ projects the first building 'expected online in 2028').
Read the answer and sources →
Checked 21 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Global AI (Colorado), LLC Data Center Project
Evidence and limits
Evidence limitation: Whether any construction-related permit has since issued; current construction or opening status; street address and parcel (not given on the county news page).
Read the answer and sources →
Checked 21 September 2026
Documented fact
Verdict on the wording above: Supported
Said by Chesterfield County · Google Bermuda Hundred Data Center Campus
Review scope: Chesterfield table as of July 2026
Evidence and limits
Evidence limitation: Current measured withdrawal or consumption; operator and title-owner legal roles; reconciliation of 2100 versus 2400 and 2700 Bermuda Hundred Road.
Read the answer and sources →
Checked 21 September 2026
Public statement checked
Verdict on the wording above: Not independently verified
Said by the Indiana Economic Development Corporation · Meta Lebanon
Evidence and limits
Evidence limitation: Executed agreement, phase-completion definition, first due date and receipts.
Read the answer and sources →
Checked 21 September 2026
Public statement checked
Verdict on the wording above: Supported
Said by Texas Comptroller of Public Accounts · Microsoft Corporation (SAT 89-90)
Evidence and limits
Evidence limitation: Exemption dollar value (the list does not state one); exemption end date for this row; construction or operating status; IT load.
Read the answer and sources →
Checked 21 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Project Baccara
Evidence and limits
Evidence limitation: Maricopa County approval; Luke Air Force Base approval; construction start; critical IT capacity; operator.
Read the answer and sources →
Checked 21 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Project Cannoli
Evidence and limits
Evidence limitation: MPSC final disposition of U-22058; whether load has materialized; measured load; critical IT capacity; executed public (non-confidential) contract text.
Read the answer and sources →
Checked 21 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Project Jupiter
Review scope: NMED docket checked 21 September 2026
Evidence and limits
Evidence limitation: Rescheduled hearing date and outcome; whether NSR 10883 is later issued, denied, or withdrawn; data-center IT load; utility demand.
Read the answer and sources →
Checked 21 September 2026
Checked earlier: claims 47–6612 September 2026 – 21 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · Sabey Decatur Technology Park
Evidence and limits
Evidence limitation: Effects outside the reviewed site-specific commitment, including other tariffs, projects and wholesale-market costs, are not established here.
Read the answer and sources →
Checked 21 September 2026
Public statement checked
Verdict on the statement above: Company claim
Said by Fairfield Energy · Vantage Data Centers OH2 Millersport campus
Question: Has the proposed Fairfield Energy Center received its power-siting certificate?
Answer to the question: The reviewed evidence does not establish a certificate. Fairfield Energy describes an application, which is not an approval. The September hearing notice is historical, and the outcome remains unverified. Shown as the company’s statement, not as a finding either way.
Evidence and limits
The underlying filing, hearing outcome and any certificate remain unverified. Company generation figures are not data-center IT capacity.
Evidence limitation: Underlying application and staff report; reason for the official/company MW discrepancy; hearing outcome; any OPSB certificate or construction authorization.
Read the answer and sources →
Checked 17 September 2026
Public statement checked
Verdict on the statement above: Company claim
Said by Vantage · Vantage Data Centers OH2 Millersport campus
Question: Does Millersport's proposed power plant guarantee no impact on electricity bills?
Answer to the question: No such guarantee has been independently established. Vantage describes a separate power supply, but plans do not establish future electricity-bill effects. The hearing outcome and certificate remain unverified. Shown as the company’s statement, not as a finding either way.
Evidence and limits
The hearing notice is historical. Its outcome and any certificate remain unverified; the follow-up is overdue.
Evidence limitation: The underlying OPSB application, hearing outcome, certificate status, and future effect on retail bills.
Read the answer and sources →
Checked 17 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · Google Fort Wayne
Evidence and limits
Evidence limitation: Cooling architecture, source water, and permitted or measured withdrawal, consumption, and discharge.
Read the answer and sources →
Checked 16 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Google · Google The Dalles
Evidence and limits
Evidence limitation: Site-specific cooling design, cooling-water source, and measured data-center withdrawal, consumption, and discharge.
Read the answer and sources →
Checked 16 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · Meta Jeffersonville
Evidence and limits
Evidence limitation: Cooling architecture, source water, and permitted or measured withdrawal, consumption, and discharge.
Read the answer and sources →
Checked 16 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Microsoft · Microsoft Mount Pleasant
Evidence and limits
Evidence limitation: Operating configuration, initial-fill volume, other site water uses, and measured withdrawal, consumption, and discharge.
Read the answer and sources →
Checked 16 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · Meta Lebanon
Evidence and limits
Evidence limitation: Actual annual withdrawal and consumption, potable and nonpotable shares, the heat-rejection architecture used in operation, and operating measurements.
Read the answer and sources →
Checked 14 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · AWS New Carlisle
Evidence and limits
Evidence limitation: The remaining New Carlisle building count, buildout schedule and full-campus completion milestone are not established in the reviewed source.
Read the answer and sources →
Checked 12 September 2026
Public statement checked
Verdict on the wording above: Supported
Said by the Indiana Economic Development Corporation · AWS New Carlisle
Evidence and limits
Evidence limitation: Benefits earned, claimed and received; the meaning of DATA's $611,502,328 Paid/Certified to Date field; whether SEF is executed; RTC status meaning; independently observed jobs and placed-in-service investment.
Read the answer and sources →
Checked 12 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Google · Google New Albany campus
Evidence and limits
Evidence limitation: Independent utility/meter corroboration; cooling share; peak-day demand; operators other than Google.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Partially supported
Question examined by DataCenterData · Microsoft La Porte
Evidence and limits
Evidence limitation: Adopted resolution text and full legal effect; whether the IEDC DATA offer has been executed.
Read the answer and sources →
Checked 12 September 2026
Public statement checked
Verdict on the wording above: Supported
Said in US EPA case study · Microsoft Quincy
Review scope: EPA observations spanning operation from 2021, 2022 connection status and early-2023 context
Evidence and limits
Evidence limitation: Current measured withdrawal, consumption and discharge; a reconciled explanation of Microsoft's separate 380-million-gallon estimate; and operating changes after EPA's dated observations.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · Vantage Data Centers OH1 campus
Review scope: December 2025 target
Evidence and limits
Evidence limitation: Whether any OH1 building has opened or is serving load.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Meta New Albany campus / Prometheus expansion
Evidence and limits
Review limitation: No limitation was recorded in this review. That does not establish that none exists.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Microsoft La Porte
Evidence and limits
Evidence limitation: Observed employment; whether the 200-by-2032 and 600+ first-phase figures describe the same scope.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Ohio
Evidence and limits
Evidence limitation: The hyperscaler's identity, underlying component revenue records, actual payroll and employee or contractor headcount.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · Ohio
Evidence and limits
Evidence limitation: Independent utility/meter records; cooling-only share; peak-day demand; operators other than Google's company-reported 2025 campus rows.
Read the answer and sources →
Checked 12 September 2026
Public statement checked
Verdict on the wording above: Not independently verified
Said by Ohio Consumers' Counsel · Ohio
Evidence and limits
Evidence limitation: A statewide census with consistent record units, lifecycle rules, deduplication and a dated coverage audit.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Ohio
Evidence and limits
Evidence limitation: Net fiscal result of any named project; whether a named project complied with or received an exemption.
Read the answer and sources →
Checked 12 September 2026
Checked earlier: claims 67–8611 September 2026 – 12 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Ohio
Evidence and limits
Evidence limitation: The governor's direct May communication was not independently retrieved. Official Tax Credit Authority text of the pause was not obtained.
Read the answer and sources →
Checked 12 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Ohio
Evidence and limits
Evidence limitation: Individual permits for named data-center outfalls were not inventoried. An individual NPDES permit is permission, not measured discharge or proof of compliance.
Read the answer and sources →
Checked 12 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by AWS economic-development manager · AWS New Carlisle
Evidence and limits
Evidence limitation: Final campus scope and completion.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by AWS economic-development manager · AWS New Carlisle
Evidence and limits
Evidence limitation: Recipient-level awards and payment records.
Read the answer and sources →
Checked 11 September 2026
Question reviewed
Verdict on the wording above: Unknown
Question examined by DataCenterData · AWS New Carlisle
Evidence and limits
Evidence limitation: Source water, permitted quantity, current metered withdrawal/consumption, and completion.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by AWS economic-development manager · AWS New Carlisle
Evidence and limits
Evidence limitation: Eligible-capital, placed-in-service and geographic scope.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by AWS economic-development manager · AWS New Carlisle
Evidence and limits
Evidence limitation: Annual gross taxes, abatements and net receipts.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by AWS economic-development manager · AWS New Carlisle
Evidence and limits
Evidence limitation: Project-specific CF-1, payroll definition, count date, residency and contractor treatment.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by AWS economic-development manager · AWS New Carlisle
Evidence and limits
Evidence limitation: Permit quantity, current metered withdrawal/consumption, source-water mix and completion.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Outdated
Said by the City of Hammond · CoreWeave / Digital Crossroads expansion
Evidence and limits
Evidence limitation: Exact unsatisfied milestones.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Outdated
Said by the City of Hammond · CoreWeave / Digital Crossroads expansion
Evidence and limits
Evidence basis: city-council projection
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Meta · Meta Lebanon
Evidence and limits
Evidence limitation: Observed peak, period and job-years.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Meta · Meta Lebanon
Evidence and limits
Evidence limitation: Operating configuration, total site water and measured consumption.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Meta · Meta Lebanon
Evidence and limits
Evidence limitation: Completed or placed-in-service capital.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Meta · Meta Lebanon
Evidence and limits
Evidence limitation: Operating payroll and delivery schedule.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Meta · Meta Lebanon
Evidence and limits
Evidence limitation: Contracted, energized and measured load.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Company claim
Said by Meta · Meta Lebanon
Evidence and limits
Evidence limitation: Utility contract and regulatory cost-allocation record.
Read the answer and sources →
Checked 11 September 2026
Public statement checked
Verdict on the wording above: Supported
Said by the Indiana Economic Development Corporation · Meta Lebanon
Evidence and limits
Evidence limitation: Controlling agreement and exemptions claimed.
Read the answer and sources →
Checked 11 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Digital Crossroad Hammond campus
Evidence and limits
Evidence limitation: These records do not freshly confirm the existing facility’s current operating status.
Read the answer and sources →
Checked 11 September 2026
Question reviewed
Verdict on the wording above: Contradicted
Question examined by DataCenterData · Meta Jeffersonville
Evidence and limits
Review limitation: No limitation was recorded in this review. That does not establish that none exists.
Read the answer and sources →
Checked 11 September 2026
A verdict applies only to the wording shown.