Power · TX

A new data center in Gray and Roberts Counties, Texas, co-located with more than a gigawatt of wind, solar, and battery storage.

A verdict applies only to the wording shown.

Company claims are shown as stated; they are not findings.

Public statement checked

Answer

Verdict on the wording above: Company claim as of Google PDF and blog checked 2026-10-01 The only support is the company or its agents. Shown as stated, not adopted. Not a finding that it is true or false. How verdicts work →

Who stated it
Said by Google · company statement in Google and Intersect announcement · 4 June 2026 →
What the evidence establishes
Google's 4 June 2026 announcement describes planned wind, solar and battery capacity of more than one gigawatt beside a new data center, with a minority of demand met by on-site gas. The same-day blog states co-located generation and does not state that gigawatt figure. This is not data-center IT load. Shown as the company's statement, not as a finding either way.
Biggest limitation
Whether any of that generation is built, energized, or metered. The split of the gigawatt figure among wind, solar, and batteries. The capacity of the on-site gas. Data-center IT load. Hourly matching between generation and the data center.
Checked
1 October 2026 · Next review: A utility, permit, or meter record for this generation, or a stated data-center IT capacity

Evidence

What the evidence supports

The PDF datelined Gray and Roberts Counties, Texas, 4 June 2026, says the Meitner Energy Center includes a data center co-located with more than a gigawatt of wind, solar, and battery storage systems. It says the majority of the site's power will come from clean energy on Day One, with a minority of demand met by on-site gas. The same day's Google blog says the data center is co-located with new energy generation and dedicated clean power, and it does not state a gigawatt figure or on-site gas. Neither page states a data-center IT capacity, an in-service date, or metered output. The PDF's Haskell County Quantum project, described there as 640 MW of solar and 1.3 GWh of storage, is a different site.

Still unknown

Whether any of that generation is built, energized, or metered. The split of the gigawatt figure among wind, solar, and batteries. The capacity of the on-site gas. Data-center IT load. Hourly matching between generation and the data center.

Sources

  1. Google and Intersect announcement, Gray and Roberts Counties → Company

    Exact location Section 'Supporting the grid, powering the future': a data center co-located with more than a gigawatt of wind, solar, and battery storage; majority clean energy on Day One; minority on-site gas.

    What it supports States the gigawatt wind, solar, and storage figure and the minority on-site gas share. Does not state data-center IT capacity or metered output.

    Publication date · Accessed

  2. Google blog: Meitner Energy Center → Company

    Exact location Opening paragraphs: construction of the Meitner Energy Center; a data center co-located with new energy generation and dedicated clean power. The blog links to the PDF.

    What it supports States co-located generation and dedicated clean power. Does not state a gigawatt figure or on-site gas.

    Publication date · Accessed

Review details

Scope

Unit
planned co-located generation
Geography
Meitner Energy Center, Gray and Roberts Counties, Texas
Period
announced 2026-06-04; no completion date stated
As of
Google PDF and blog checked 2026-10-01
Confidence
medium — Company announcement and same-day company blog. No utility, permit, or meter record reviewed.
Kind
Public statement checked

Conflicting evidence

None recorded when this claim was checked. That records what we logged, not a finding that no conflicting record exists.

Chronology

  1. Stated by Google
  2. Published — Google and Intersect announcement, Gray and Roberts Counties
  3. Published — Google blog: Meitner Energy Center
  4. 2 sources retrieved
  5. Checked by DataCenterData
  6. Date not established Next review: A utility, permit, or meter record for this generation, or a stated data-center IT capacity

Corrections and history

No corrections or wording changes recorded for this claim.

Data

This claim as JSON →

Suggest a correction

Suggest a correction → Claim ID meitner-gray-roberts-generation and this page are prefilled. Accepted material corrections appear publicly on Changes.