Power / developer claim · OH · vantage-oh2-millersport
Company claimSaid by Vantage (company) in Vantage Millersport campus FAQ.
Checked 17 September 2026
The natural-gas power facility described as adjacent to Vantage's planned Millersport campus means the campus will not affect electricity costs for local residents or businesses.
What the evidence supports
Vantage says the proposed Fairfield Energy Center would power its adjacent campus without connecting to the local or regional grid. A preserved OPSB summary describes a proposed 1,300 MW gas facility with up to 1,000 MW of battery storage; the developer instead reports up to 1,350 MW net generation and approximately 1,040 MW storage. Those figures are not data-center IT capacity. No certificate or hearing outcome has been verified; the evidentiary hearing is noticed for 17 September 2026. The plans cannot establish future retail-bill effects as an observed outcome.
Still unknown
The underlying OPSB application, hearing outcome, certificate status, and future effect on retail bills.
Evidence details
-
Vantage Millersport campus FAQ → Institution
Exact location https://vantagemillersportcampus.com/faq/
What it supports Company prediction that the campus will not affect local electricity costs. Not an observed or regulatory finding.
-
Fairfield Energy Center major-utility-facility page (OPSB case 26-0160-EL-BGN) → Institution
Exact location https://fairfieldenergycenter.com/home/utility-facility
What it supports Developer-reported pending OPSB application. Generation and storage figures are not data-center IT capacity and are not a certificate or construction authorization.
Counterevidence
None recorded.
Next check
Official OPSB docket 26-0160-EL-BGN after the 17 September 2026 hearing
History
Correction · 12 September 2026 · Software-assisted second check
vantage-oh2-millersport → Power / developer claim
Field Power / developer claim
From Only company descriptions of the proposed adjacent power facility were cited.
To The preserved official OPSB case summary is cited separately from the developer's differing generation and storage figures.
Why Primary-record follow-up confirmed the proposal and hearing date while preserving the unresolved MW discrepancy and outcome hold.
Evidence https://fairfieldenergycenter.com/home/utility-facility →
Correction · 17 September 2026 · Editorial classification update
vantage-oh2-millersport → Power / developer claim
Field Power / developer claim
From The source link used an OPSB case-summary URL that now returns 404.
To The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.
Why The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.
Evidence https://fairfieldenergycenter.com/home/utility-facility →
Data + actions