Power · Vantage Data Centers OH2 Millersport campus · OH

Does Millersport's proposed power plant guarantee no impact on electricity bills?

Public statement checked

Statement checked The natural-gas power facility described as adjacent to Vantage's planned Millersport campus means the campus will not affect electricity costs for local residents or businesses.

Verdict on the statement above: Company claim The only support is the company or its agents. Shown as stated, not adopted. Not a finding that it is true or false. How verdicts work →

Answer to the question

Who made the statement
Said by Vantage · company statement in Vantage Millersport campus FAQ →
What the evidence establishes
No such guarantee has been independently established. Vantage describes a separate power supply, but plans do not establish future electricity-bill effects. The hearing outcome and certificate remain unverified. Shown as the company’s statement, not as a finding either way.
Biggest limitation
The hearing notice is historical. Its outcome and any certificate remain unverified; the follow-up is overdue.
Checked
17 September 2026 · Next review: Follow-up overdue since 17 September 2026 — Official OPSB docket 26-0160-EL-BGN after the 17 September 2026 hearing. A newer evidence review is still needed. · History (3) →

Evidence

What the evidence supports

Vantage says the proposed Fairfield Energy Center would power its adjacent campus without connecting to the local or regional grid. A preserved OPSB summary describes a proposed 1,300 MW gas facility with up to 1,000 MW of battery storage; the developer instead reports up to 1,350 MW net generation and approximately 1,040 MW storage. Those figures are not data-center IT capacity. The previously reviewed notice scheduled an evidentiary hearing for 17 September 2026; no hearing outcome or certificate has been verified. The plans cannot establish future retail-bill effects as an observed outcome.

Sources

  1. Vantage Millersport campus FAQ → Institution

    Exact location https://vantagemillersportcampus.com/faq/

    What it supports Company prediction that the campus will not affect local electricity costs. Not an observed or regulatory finding.

    Publication date unavailable · Accessed

  2. Fairfield Energy Center major-utility-facility page (OPSB case 26-0160-EL-BGN) → Archived copy Institution

    Exact location https://fairfieldenergycenter.com/home/utility-facility

    What it supports Developer-reported pending OPSB application. Generation and storage figures are not data-center IT capacity and are not a certificate or construction authorization.

    Publication date unavailable · Accessed

Corrections and history

Correction · 12 September 2026 · Software-assisted second check

vantage-oh2-millersport → Power / developer claim

Field Power / developer claim

From Only company descriptions of the proposed adjacent power facility were cited.

To The preserved official OPSB case summary is cited separately from the developer's differing generation and storage figures.

Why Primary-record follow-up confirmed the proposal and hearing date while preserving the unresolved MW discrepancy and outcome hold.

Evidence https://fairfieldenergycenter.com/home/utility-facility →

Correction · 17 September 2026 · Editorial classification update

vantage-oh2-millersport → Power / developer claim

Field Power / developer claim

From The source link used an OPSB case-summary URL that now returns 404.

To The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.

Why The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.

Evidence https://fairfieldenergycenter.com/home/utility-facility →

Correction · 12 October 2026 · Editorial classification update

vantage-oh2-millersport → Power / developer claim

Field Power / developer claim

From The evidentiary hearing is noticed for 17 September 2026.

To The previously reviewed notice scheduled the hearing for 17 September 2026; outcome and certificate remain unverified, with follow-up overdue.

Why Clarified historical notice and unresolved follow-up. No factual outcome, source date, substantive check date or company verdict changed.

Evidence https://fairfieldenergycenter.com/home/utility-facility →

Review details

Scope

Unit
Power / developer claim
Geography
Ohio
Period
None recorded
Confidence
medium
Kind
Public statement checked

Full limitation

The underlying OPSB application, hearing outcome, certificate status, and future effect on retail bills.

Conflicting evidence

None recorded when this claim was checked. That records what we logged, not a finding that no conflicting record exists.

Chronology

  1. Source retrieved
  2. Changed source locator recorded
  3. Source retrieved
  4. Changed source locator recorded
  5. Checked by DataCenterData
  6. Follow-up overdue — Official OPSB docket 26-0160-EL-BGN after the 17 September 2026 hearing
  7. Changed wording recorded
  8. Date not established Stated by Vantage — statement date not established

Data

This claim as JSON →

Suggest a correction