Power · KY

Customers on LG&E and KU's Extremely High Load Factor rate must sign a 15-year contract, commit to paying for at least 80% of the power they reserve, and provide deposits equal to between 12 and 24 months of their service.

A verdict applies only to the wording shown.

Public statement checked

Answer

Verdict on the wording above: Partially supported as of Tariff, order and company page read 1 November 2026 Partially supported because only Louisville Gas and Electric's Rate EHLF tariff was checked; Kentucky Utilities' parallel tariff was not read. How verdicts work →

Who stated it
Said by LG&E and KU · company statement in Rate Request - Investing to build a stronger system →
What the evidence establishes
Partly: borne out for LG&E; KU's tariff was not read. LG&E's Rate EHLF sheets, under the PSC's 16 February 2026 order, require a contract term of at least 15 years, billing demand of at least 80% of contract capacity, and collateral of 24 months of minimum bills, cut to 12 months only where the customer or guarantor is rated at least A and A2 and holds cash and equivalents of at least ten times the collateral.
Biggest limitation
Kentucky Utilities' parallel EHLF tariff was not read. Which customers have signed EHLF agreements and on what terms; agreements are to be filed with the Commission.
Checked
1 November 2026 · Next review: Kentucky Utilities' EHLF tariff sheets, or an EHLF electric service agreement filed with the Commission

Evidence

What the evidence supports

LG&E's tariff on file with the Commission, Rate EHLF (Original Sheets 26 to 26.2), is available only for new customers with a contract capacity greater than 50 MVA and an expected average monthly load factor above 85%. It says contracts 'shall be made for an Initial Contract Term of not less than fifteen (15) years'. Monthly billing demand for the Maximum Load Charge is the greater of measured loads or 80% of the contract capacity; energy is billed separately per kWh. Collateral is cash or a letter of credit equal to 24 months of minimum billed amounts at the largest contract capacity. It falls to 12 months of the annual minimum billed amounts only if the customer or its guarantor has an S&P credit rating of at least A and a Moody's rating of at least A2 and cash and cash equivalents on its audited balance sheet of at least ten times the collateral requirement. The sheets say they were issued by authority of the Commission's order of 16 February 2026 in Case 2025-00114, which approved the rate case settlement with modifications, including a 50 MVA threshold for Rate EHLF. These three terms are borne out for LG&E. The statement also covers KU, whose parallel tariff was not read, so that half is unverified. A tariff is not a bill.

Still unknown

Kentucky Utilities' parallel EHLF tariff was not read. Which customers have signed EHLF agreements and on what terms; agreements are to be filed with the Commission.

Sources

  1. Rate Request - Investing to build a stronger system → Company

    Exact location EHLF section: 15-year contract, at least 80% of reserved power, deposits of 12 to 24 months.

    What it supports The statement checked.

    Publication date unavailable · Accessed

  2. Louisville Gas and Electric Company electric tariff, P.S.C. Electric No. 14, Rate EHLF → Gov. record

    Exact location Original Sheet No. 26 (Availability; Rate, item 3 of billing demand), 26.1 (Term of Contract), 26.2 (Collateral Requirements).

    What it supports The 15-year minimum term, 80% billing demand floor and 12 or 24 months of collateral.

    Publication date · Accessed

  3. Order, Case No. 2025-00114 (LG&E rate case) → Gov. record

    Exact location Summary of the stipulation: Rate EHLF 50 MVA threshold; applies only to new customers.

    What it supports The order under which the tariff was issued and the EHLF eligibility terms.

    Publication date · Accessed

  4. PSC Issues Order for KU and LG&E Rate Cases → Gov. record

    Exact location Headline and first paragraph.

    What it supports The Commission approved the settlement with modifications on 16 February 2026.

    Publication date · Accessed

Review details

Scope

Unit
tariff terms (contract term, minimum billing demand, collateral)
Geography
Louisville Gas and Electric Company Rate EHLF; new customers above 50 MVA contract capacity
Period
tariff effective 16 February 2026
As of
Tariff, order and company page read 1 November 2026
Confidence
high — LG&E tariff sheets on file at the Kentucky PSC and the Commission's order and press release of 16 February 2026. Kentucky Utilities' tariff not read.
Kind
Public statement checked

Conflicting evidence

None recorded when this claim was checked. That records what we logged, not a finding that no conflicting record exists.

Chronology

  1. Published — Order, Case No. 2025-00114 (LG&E rate case)
  2. Published — PSC Issues Order for KU and LG&E Rate Cases
  3. Published — Louisville Gas and Electric Company electric tariff, P.S.C. Electric No. 14, Rate EHLF
  4. 4 sources retrieved
  5. Checked by DataCenterData
  6. Date not established Stated by LG&E and KU — statement date not established
  7. Date not established Next review: Kentucky Utilities' EHLF tariff sheets, or an EHLF electric service agreement filed with the Commission

Corrections and history

No corrections or wording changes recorded for this claim.