Public statement checked
Answer
Verdict on the wording above: Company claim as of DataBank pages captured 2026-09-25 The only support is the company or its agents. Shown as stated, not adopted. Not a finding that it is true or false. How verdicts work →
- Who stated it
- Said by DataBank · company statement in DataBank Culpeper campus and building pages →
- What the evidence establishes
- DataBank's IAD5 page states 72 MW of planned critical IT load for the first building, and the IAD6 page states 120 MW for the second. The campus page states 192 MW for both. Those are planned company figures, not operating load. Shown as the company's statement, not as a finding either way.
- Biggest limitation
- Whether either building is under construction or operating. Utility power. Metered load. The wording of the unopened construction post.
- Checked
- 25 September 2026 · Next review: A construction, occupancy, or utility record for IAD5 or IAD6
Evidence
What the evidence supports
The IAD5 page says IAD5 will be the first data center constructed on the Culpeper campus and prints 72 MW Critical IT Load. The IAD6 page says IAD6 will be the second and prints 120 MW Critical IT Load. The campus page says an 85-acre campus will accommodate two facilities totaling 1.4 million raw square feet and 192 MW of critical IT load. The building figures add to the campus figure. The campus acreage and square footage are not assigned to one building. All three pages describe planned facilities. A construction-company social post about IAD5 was not opened and is not evidence that either building is open.
Still unknown
Whether either building is under construction or operating. Utility power. Metered load. The wording of the unopened construction post.
Sources
-
DataBank IAD5 page → Company
Exact location IAD5 is described as the first data center to be constructed on the Culpeper campus. The critical-IT figure on that page is 72 MW.
What it supports States 72 MW of critical IT load for the first building, as a plan.
-
DataBank IAD6 page → Company
Exact location IAD6 is described as the second data center to be constructed on the Culpeper campus. The critical-IT figure on that page is 120 MW.
What it supports States 120 MW of critical IT load for the second building, as a plan.
-
DataBank Culpeper campus page → Company
Exact location 85-acre campus that will accommodate 2 facilities totaling 1.4M raw square feet and 192MW of critical IT load.
What it supports States 192 MW of critical IT load for the two-facility campus, plus campus area figures that are not one building.
Review details
Scope
- Unit
- planned critical IT MW by scope
- Geography
- DataBank Culpeper campus, 14601 Germanna Highway, Culpeper, Virginia; IAD5 and IAD6
- Period
- pages captured 2026-09-25; both buildings described as not yet constructed
- As of
- DataBank pages captured 2026-09-25
- Confidence
- medium — Saved operator pages captured 2026-09-25. No permit or utility record reviewed for this check.
- Kind
- Public statement checked
Conflicting evidence
None recorded when this claim was checked. That records what we logged, not a finding that no conflicting record exists.
Chronology
- 3 sources retrieved
- Checked by DataCenterData
- Date not established Stated by DataBank — statement date not established
- Date not established Next review: A construction, occupancy, or utility record for IAD5 or IAD6
Corrections and history
No corrections or wording changes recorded for this claim.