Vantage says its Fredericksburg campus is planned for 192 MW of critical IT load, 929,000 square feet on 82 acres, N+1 electrical and mechanical design, and near-zero water-use effectiveness, with the first building in late 2027.

A verdict applies only to the wording shown.

Company claims are shown as stated; they are not findings.

Public statement checked

Answer

Verdict on the wording above: Company claim as of Vantage campus page checked 2026-10-01 The only support is the company or its agents. Shown as stated, not adopted. Not a finding that it is true or false. How verdicts work →

Who stated it
Said by Vantage Data Centers · company statement in Vantage Fredericksburg VA4 campus page →
What the evidence establishes
Vantage's campus page states 192 MW of planned critical IT load, 929,000 square feet and 82 acres across three buildings, with the first building slated for late 2027. N+1 design and a near-zero water-use figure on the same page are design statements, not measured use. Shown as the company's statement, not as a finding either way.
Biggest limitation
Whether construction has started, any building is operating, or the stated IT load, area, or water-use figure has been measured. Utility power is a separate figure on the same page. Source-access disclosure added 10 November 2026: the 9 November audit reported HTTP 404 for the cited Vantage page, and the 10 November follow-through reported HTTP 403 from its retrieval tool. These results do not establish cancellation or revised figures. The archive reported by the earlier audit was not independently reverified in the follow-through. The substantive source review remains dated 1 October 2026.
Checked
1 October 2026 · Next review: A permit, utility filing, or later Vantage record with operating IT load or a measured water figure

Evidence

What the evidence supports

The Vantage page says the Fredericksburg campus will hold three two-story facilities with a combined critical IT load of 192 MW, on 82 acres, with 929,000 square feet. The overview also prints 192 MW and 929K. It says the first building is slated to be operational late 2027, with further phases through 2028, and that the campus brings Vantage's stated Virginia footprint to 782 MW. It says the campus will offer N+1 redundancy across its electrical systems and N+1 redundancy across all mechanical systems. It says a closed-loop chiller system will keep water-use effectiveness near zero, in liters per kilowatt-hour. An average density of 500 kW per row is a design density, not the 192 MW critical IT total. No publication date is printed on the page. These are planned company figures, not an operating campus.

Still unknown

Whether construction has started, any building is operating, or the stated IT load, area, or water-use figure has been measured. Utility power is a separate figure on the same page. Source-access disclosure added 10 November 2026: the 9 November audit reported HTTP 404 for the cited Vantage page, and the 10 November follow-through reported HTTP 403 from its retrieval tool. These results do not establish cancellation or revised figures. The archive reported by the earlier audit was not independently reverified in the follow-through. The substantive source review remains dated 1 October 2026.

Sources

  1. Vantage Data Centers, Fredericksburg VA4 campus page → Company

    Exact location Campus paragraph: three facilities, combined critical IT load of 192 MW, 82 acres, 929,000 square feet, first building late 2027, phases through 2028. Electrical and mechanical sections: N+1 redundancy. Cooling section: WUE near zero.

    What it supports States the planned campus IT, area, acreage, schedule, N+1 design, and water-use design figure. Source-access disclosure added 10 November 2026: the 9 November audit reported HTTP 404 for the cited Vantage page, and the 10 November follow-through reported HTTP 403 from its retrieval tool. These results do not establish cancellation or revised figures. The archive reported by the earlier audit was not independently reverified in the follow-through. The substantive source review remains dated 1 October 2026.

    Publication date unavailable · Accessed

Review details

Scope

Unit
planned campus critical IT, area and design
Geography
VA4, 225 Centreport Parkway, Fredericksburg, Virginia
Period
first building slated for late 2027; further phases stated through 2028; page date not stated
As of
Vantage campus page checked 2026-10-01
Confidence
medium — Operator campus page opened 2026-10-01. No permit or utility record reviewed. No publication date on the page.
Kind
Public statement checked

Conflicting evidence

None recorded when this claim was checked. That records what we logged, not a finding that no conflicting record exists.

Chronology

  1. Source retrieved
  2. Checked by DataCenterData
  3. Date not established Stated by Vantage Data Centers — statement date not established
  4. Date not established Next review: A permit, utility filing, or later Vantage record with operating IT load or a measured water figure

Corrections and history

No corrections or wording changes recorded for this claim.

Data

This claim as JSON →

Suggest a correction

Suggest a correction → Claim ID vantage-fredericksburg-campus-plan and this page are prefilled. Accepted material corrections appear publicly on Changes.