Public statement checked
Vantage says its Fredericksburg campus is planned for 192 MW of critical IT load, 929,000 square feet on 82 acres, N+1 electrical and mechanical design, and near-zero water-use effectiveness, with the first building in late 2027.
Said by Vantage Data Centers · Virginia
Review scope: Vantage campus page checked 1 October 2026
Evidence and limits
Evidence limitation: Whether construction has started, any building is operating, or the stated IT load, area, or water-use figure has been measured. Utility power is a separate figure on the same page.
Read the answer and sources →Checked 1 October 2026