  "schema_version": "0.5",
  "source": "Projection of canonical data/claims.json.",
  "record_count": 50,
  "claims": [
    {
      "id": "indiana-count-60",
      "record_id": null,
      "topic": "Statewide count",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Treating CAC's queue of roughly 60 proposed hyperscale projects as 60 operating physical buildings.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Statewide count",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Citizens Action Coalition says approximately 60 large hyperscale data centers were proposed over two years and that only several are operating. Its public index is a useful proposal-discovery queue, including 18 entries it labels withdrawn—not a verified count of operating physical buildings. DataCenterData cites the queue but does not adopt it as a statewide facility total.",
      "unknown": "Independently reconstructed statewide operating-facility count.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Institution; Institution"
      },
      "sources": [
        {
          "title": "Citizens Action Coalition Indiana data-center map",
          "publisher": "Citizens Action Coalition",
          "class": "Institution",
          "published": "",
          "retrieved": "2026-09-10",
          "url": "https://www.citact.org/ai-data-centers",
          "locator": "https://www.citact.org/ai-data-centers",
          "supports": "CAC presents a proposal-discovery queue of roughly 60 hyperscale entries, including withdrawn labels; not a verified operating-building census."
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [],
      "href": "/claims/indiana-count-60/",
      "related_pages": [
        {
          "title": "DataCenterData Indiana coverage boundary",
          "url": "/indiana/#coverage"
        }
      ]
    },
    {
      "id": "aws-campus-complete",
      "record_id": "aws-new-carlisle",
      "topic": "Project status",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Treating AWS Project Rainier's operation as proof that the full New Carlisle campus is complete.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Project status",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Amazon says its multi-site Project Rainier compute cluster is operational and identifies New Carlisle as one site. That supports an operating milestone, not completion of every planned New Carlisle building or the full announced investment scope.",
      "unknown": "The remaining New Carlisle building count, buildout schedule and full-campus completion milestone are not established in the reviewed source.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Company; Institution"
      },
      "sources": [
        {
          "title": "Amazon Project Rainier operating update",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
          "locator": "Opening summary and the sections “A mountain of compute” and “Sustainability at scale”",
          "supports": "Amazon describes Project Rainier as operational across multiple U.S. data centers and identifies St. Joseph County as one Project Rainier site; it does not say every planned New Carlisle building or the full campus is complete."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported",
          "to": "Not independently verified",
          "reason": "The operating Project Rainier milestone does not establish completion of every planned New Carlisle building or the full campus.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Unknown",
          "reason": "This card tests a common inference, not an attributed outside statement. The operating milestone still does not establish completion of every planned building or the full campus.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-campus-complete/",
      "related_pages": [
        {
          "title": "DataCenterData AWS New Carlisle ledger",
          "url": "/projects/aws-new-carlisle/"
        }
      ]
    },
    {
      "id": "meta-lebanon-current-gw",
      "record_id": "meta-lebanon",
      "topic": "Power / timing",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Reading Meta Lebanon's 1 GW design as current measured grid demand.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power / timing",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Meta describes a 1 GW campus and reported a February 2026 groundbreaking. The reviewed sources do not establish current metered load, a completed buildout or a comparable utility-service commitment.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Company; Institution"
      },
      "sources": [
        {
          "title": "Meta Lebanon groundbreaking announcement",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-current-gw/",
      "related_pages": [
        {
          "title": "DataCenterData Meta Lebanon ledger",
          "url": "/projects/meta-lebanon/"
        }
      ]
    },
    {
      "id": "meta-closed-loop-zero-water",
      "record_id": "meta-lebanon",
      "topic": "Water / cooling",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Closed-loop liquid cooling means the Meta Lebanon campus will use no water.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "cooling-water design versus total campus water use",
        "scope": "Meta Lebanon campus, Indiana",
        "period": "future operation; completion date not established"
      },
      "supports": "Meta says the design will recirculate cooling water and use zero water for a majority of the year. That is narrower than zero annual or total campus water use and remains a future design claim until operating measurements exist.",
      "unknown": "Actual annual withdrawal and consumption, potable and nonpotable shares, the heat-rejection architecture used in operation, and operating measurements.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Meta company design statement; no operating measurements."
      },
      "sources": [
        {
          "title": "Meta Lebanon cooling description",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-14",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "Prioritizing Sustainability, first paragraph",
          "supports": "Meta says the future design will recirculate cooling water and use zero water for a majority of the year. It does not say zero annual campus water use."
        }
      ],
      "last_checked": "2026-09-14",
      "next_check": {
        "trigger": "Operating water withdrawal, consumption or utility records after the campus begins service",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported; unknowns not recorded",
          "to": "Not independently verified; operating water unknowns and the future design scope are explicit",
          "reason": "The second review found that a literal zero-water conclusion is not established by Meta's narrower future design statement.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Unknown",
          "reason": "The prior label is defined for an unverified statement by a non-company party. This card tests a common inference instead; the reviewed company source does not establish annual or total campus water use.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-closed-loop-zero-water/",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-14",
      "related_pages": [
        {
          "title": "DataCenterData cooling and water definitions",
          "url": "/water/"
        }
      ],
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "hammond-facility-closed",
      "record_id": "digital-crossroads-hammond",
      "topic": "Entity / lifecycle",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "The expiration of Hammond's CoreWeave agreement means the existing Digital Crossroad data center closed.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Entity / lifecycle",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Hammond says the separate agreement for the proposed 301 Digital Crossroads expansion expired. City records identify CoreWeave as an existing tenant at the operating 100 Digital Crossroads facility. The failed expansion and existing DX-1 site are not the same lifecycle event.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Gov. record"
      },
      "sources": [
        {
          "title": "City of Hammond agreement-expiration notice",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "locator": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "supports": ""
        },
        {
          "title": "Hammond Common Council minutes",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "digital-crossroads-hammond",
        "coreweave-hammond",
        "digital-crossroad-dx1"
      ],
      "href": "/claims/hammond-facility-closed/"
    },
    {
      "id": "microsoft-laporte-jobs-now",
      "record_id": "microsoft-la-porte",
      "topic": "Jobs / timing",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Microsoft La Porte already has more than 600 permanent Microsoft jobs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / timing",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Microsoft's 2026 groundbreaking update projects more than 600 permanent jobs in the first phase but gives no due date for that forecast. Indiana's 2024 announcement separately projected up to 200 jobs by the end of 2032. Neither announcement establishes current employment, and the two scopes have not been reconciled.",
      "unknown": "Observed employment; whether the 200-by-2032 and 600+ first-phase figures describe the same scope.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Company; Gov. record"
      },
      "sources": [
        {
          "title": "Microsoft La Porte groundbreaking update",
          "publisher": "Microsoft",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://local.microsoft.com/blog/microsoft-breaks-ground-on-la-porte-datacenter-project/",
          "locator": "Opening paragraph and paragraph beginning 'Beyond the thousands of construction jobs'",
          "supports": "Microsoft projects more than 600 permanent first-phase jobs; it does not report observed employment or a due date for the forecast."
        },
        {
          "title": "Indiana's 2024 Microsoft announcement",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://iedc.in.gov/events/news/details/2024/06/04/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana",
          "locator": "Body dateline June 3, 2024 and opening paragraph; URL path is dated June 4",
          "supports": "State announcement projects up to 200 jobs by the end of 2032. It is not an employment or payroll record."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "First-phase completion notice or a payroll record",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Not yet due",
          "to": "Not independently verified",
          "reason": "The 600-plus first-phase forecast has no retrieved due date; the 2032 date belongs to a different 200-job scope.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Contradicted",
          "reason": "The claim says the projected jobs already exist, while the cited company source still describes a forecast and the government source describes a different job scope.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "microsoft-la-porte"
      ],
      "href": "/claims/microsoft-laporte-jobs-now/",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-12",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "meta-jeffersonville-job-unit",
      "record_id": "meta-jeffersonville",
      "topic": "Jobs / unit",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Meta Jeffersonville's hundreds of construction jobs are hundreds of permanent operating jobs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / unit",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Indiana's project announcement separates approximately 100 operational jobs from hundreds of construction jobs. Neither category is treated as observed until employment evidence and the relevant due date are established.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Indiana Meta Jeffersonville announcement",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/01/25/gov.-holcomb-announces-meta-to-build-an-800m-data-center-campus-in-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/01/25/gov.-holcomb-announces-meta-to-build-an-800m-data-center-campus-in-indiana",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-jeffersonville"
      ],
      "href": "/claims/meta-jeffersonville-job-unit/",
      "related_pages": [
        {
          "title": "DataCenterData Indiana project index",
          "url": "/indiana/#projects"
        }
      ]
    },
    {
      "id": "sabey-cost-allocation-generalized",
      "record_id": "sabey-indianapolis",
      "topic": "Power / cost allocation",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "One Indianapolis developer cost commitment proves no Indiana data center can affect other customers' electricity costs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power / cost allocation",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "The reviewed Indianapolis filing says Sabey will pay costs related to the project's substation, generation, transmission and distribution needs. That is meaningful site-specific evidence; it does not establish every tariff, wholesale-market effect or project in Indiana.",
      "unknown": "Effects outside the reviewed site-specific commitment, including other tariffs, projects and wholesale-market costs, are not established here.",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Indianapolis petitioner appendix, cases 2025-CAP-856 / 2025-CVR-856",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf",
          "locator": "Petitioner presentation, PDF pages 24–25, commitment concerning the proposed substation and energy needs",
          "supports": "The petitioner describes a commitment to pay costs related to the proposed substation and the site's energy needs; that site-specific statement does not establish statewide cost effects for every data center."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported",
          "to": "Not independently verified",
          "reason": "One site's cost commitment cannot establish the statewide claim shown.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Partially supported",
          "reason": "The cited commitment supports cost allocation for one site, but it cannot establish the statewide generalization shown.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "sabey-indianapolis"
      ],
      "href": "/claims/sabey-cost-allocation-generalized/",
      "related_pages": [
        {
          "title": "DataCenterData Indiana project index",
          "url": "/indiana/#projects"
        }
      ]
    },
    {
      "id": "ohio-count-200",
      "record_id": null,
      "topic": "Statewide count",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Ohio has more than 200 data centers.",
      "claimant": {
        "name": "Ohio Consumers' Counsel",
        "role": "advocate",
        "said_on": null,
        "said_where": {
          "title": "Ohio Consumers' Counsel quick facts",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "section 'Data Centers in Ohio'"
        }
      },
      "unit_scope": {
        "unit": "Statewide count",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Ohio's consumer advocate repeats a commercial-directory count. It is useful as a market signal, but the linked directory's counting unit, lifecycle scope and deduplication have not been reconciled here. OCC's web page says more than 200; a retained PDF at its March-path URL says about 200, while the live page now links to a different May-path PDF that was not retrieved. DataCenterData does not adopt 200-plus as its own count.",
      "unknown": "A statewide census with consistent record units, lifecycle rules, deduplication and a dated coverage audit.",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution; Gov. record"
      },
      "sources": [
        {
          "title": "Ohio Consumers' Counsel quick facts",
          "publisher": "Ohio Consumers' Counsel",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "supports": "OCC web fact sheet repeats a commercial-directory count of more than 200."
        },
        {
          "title": "Data Centers in Ohio (OCC fact sheet PDF, March 2026)",
          "publisher": "Ohio Consumers' Counsel",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://occ.ohio.gov/sites/default/files/2026-03/OCC-Data-Centers-in-Ohio.pdf",
          "locator": "'Ohio has about 200 data centers, making it the fifth highest state in the country.'",
          "supports": "OCC March 2026 PDF uses 'about 200', not 'more than 200'."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "Reconcile OCC's current linked PDF and independently reconstruct the statewide denominator",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "Ohio's consumer advocate repeats a commercial directory count. It is useful as a market signal, but the underlying unit can include buildings, suites and campuses and is not a state census. DataCenterData does not adopt 200+ as its own count.",
          "to": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
          "reason": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
          "evidence_url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "by": "DataCenterData review",
          "evidence": [
            {
              "title": "Quick Facts: Data Centers in Ohio (web page)",
              "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
              "locator": "'Ohio has more than 200 data centers, making it the fifth-highest state in the country.'"
            },
            {
              "title": "Data Centers in Ohio (OCC fact sheet PDF, March 2026)",
              "url": "https://occ.ohio.gov/sites/default/files/2026-03/OCC-Data-Centers-in-Ohio.pdf",
              "locator": "'Ohio has about 200 data centers, making it the fifth highest state in the country.'"
            }
          ]
        },
        {
          "date": "2026-09-12",
          "kind": "wording-changed",
          "from": "The directory denominator can include buildings, suites and campuses; March 2026 PDF",
          "to": "The directory unit and deduplication are unreconciled; retained March-path PDF differs from the live page's current May-path target",
          "reason": "The second review removed an unsupported description of the directory denominator and distinguished URL-path timing from publication date.",
          "by": "Software-assisted second check"
        }
      ],
      "entity_ids": [],
      "href": "/claims/ohio-count-200/",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-12",
      "related_pages": [
        {
          "title": "DataCenterData Ohio coverage definition",
          "url": "/ohio/#coverage"
        }
      ],
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating Ohio's 85% data-center tariff as proof that residents cannot be affected by data-center-driven power costs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "large-load tariff risk allocation and contracted demand",
        "scope": "AEP Ohio service territory",
        "period": "tariff effective 2025-07-23; AEP load update 2026-02-13"
      },
      "supports": "The PUCO-approved AEP Ohio tariff allocates substantial underuse and cancellation risk to new loads over 25 MW. PUCO describes the concern as cost shifting from significant transmission infrastructure and other underused investment serving data centers. These protections are real, but the reviewed sources do not prove that residents can never be affected by generation, transmission, wholesale-market or pre-tariff costs. Under AEP's published contract-capacity formula, DataCenterData calculates a minimum of about 72.5% at 50 MW and 82.5% at 100 MW; a separate historical-demand ratchet can produce a higher billed demand. AEP reports that 12,219 of 17,861 MW of contracted data-center projects were signed before the tariff took effect; contracted projects are not current measured load.",
      "unknown": "Whether generation, transmission, wholesale-market or pre-tariff contracts can affect household bills remains a separate question from this tariff arithmetic.",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "PUCO government explanation plus AEP company tariff and load disclosures; absolute household-bill conclusion not established."
      },
      "sources": [
        {
          "title": "PUCO approves AEP Ohio data-center tariff",
          "publisher": "Public Utilities Commission of Ohio",
          "class": "Gov. record",
          "published": "2025-07-09",
          "retrieved": "2026-09-12",
          "url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/3e8bb79",
          "locator": "Paragraphs following Chair Jenifer French's quotation: significant transmission infrastructure and underused-investment cost shifting",
          "supports": "PUCO's stated concern and its rationale for safeguards; not proof that household bills can never be affected."
        },
        {
          "title": "Ohio Consumers' Counsel quick facts",
          "publisher": "Ohio Consumers' Counsel",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "supports": "OCC describes the 85% contracted-capacity payment term; it does not prove household bills cannot be affected."
        },
        {
          "title": "AEP Ohio Schedule DCT terms",
          "publisher": "AEP Ohio",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
          "locator": "Minimum Demand Charges, numbered limbs 1-2; Aggregation; Contract Term; Mandatory Process step 3. Tariff effective 2025-07-23; page publication date not established.",
          "supports": "Published Schedule DCT minimum-demand formula. Arithmetic below is DataCenterData's, not an AEP quotation."
        },
        {
          "title": "AEP Ohio Updates PUCO on Data Center Load: Figures Show Tariff is Working (2026-02-13)",
          "publisher": "AEP Ohio",
          "class": "Company",
          "published": "2026-02-13",
          "retrieved": "2026-09-12",
          "url": "https://www.aepohio.com/company/news/view?releaseID=10753",
          "locator": "'in addition to 12,219 MW of data center contracts signed before the tariff went into effect'; 'AEP Ohio now has 17,861 MW of contracted data center projects'",
          "supports": "AEP reports contracted quantities, not current consumption."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "PUCO rider, transmission-cost or rate-case filings that quantify residential allocation",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "The PUCO-approved AEP Ohio tariff allocates substantial underuse and cancellation risk to new loads over 25 MW. That is real protection against stranded distribution investment; it is not proof that generation, transmission or wholesale-market costs can never affect household bills.",
          "to": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
          "reason": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
          "evidence_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
          "by": "DataCenterData review",
          "evidence": [
            {
              "title": "AEP Ohio Data Center Tariff (minimum demand charges)",
              "url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
              "locator": "minimum demand formula: 'the minimum demand cannot exceed 85% of the total contract capacity'"
            },
            {
              "title": "AEP Ohio Updates PUCO on Data Center Load: Figures Show Tariff is Working (2026-02-13)",
              "url": "https://www.aepohio.com/company/news/view?releaseID=10753",
              "locator": "'in addition to 12,219 MW of data center contracts signed before the tariff went into effect'; 'AEP Ohio now has 17,861 MW of contracted data center projects'"
            }
          ]
        },
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported; framed as stranded distribution investment",
          "to": "Not independently verified; scope narrowed to AEP Ohio and infrastructure/transmission risk",
          "reason": "The second review found that the tariff supports risk allocation but not the absolute household-bill conclusion, and PUCO's own description is not limited to distribution.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Partially supported",
          "reason": "The tariff supports part of the risk-allocation claim, but it does not prove that generation, transmission or wholesale-market costs can never affect household bills.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [],
      "href": "/claims/aep-ratepayer-protection/",
      "derivation": "AEP published formula: 15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity.",
      "computed_by": "DataCenterData",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-12",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "new-albany-payroll-equivalent",
      "record_id": null,
      "topic": "Taxes / jobs",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Reading New Albany's $178 million payroll-equivalent figure as actual operator payroll.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "payroll-equivalent revenue comparison",
        "scope": "one unnamed hyperscaler in the City of New Albany, Ohio",
        "period": "tax year 2024, payable 2025"
      },
      "supports": "The city calls $178 million a payroll equivalent: the amount of payroll that would yield the same revenue at its 2% income-tax rate. It is a city-reported comparison for one hyperscaler, not the operator's reported payroll, a headcount or an independently reconciled tax-receipt audit.",
      "unknown": "The hyperscaler's identity, underlying component revenue records, actual payroll and employee or contractor headcount.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "New Albany city-finance page",
          "publisher": "City of New Albany",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://datacenters.newalbanyohio.org/city-finances/",
          "locator": "Data Centers are a Financial Benefit to New Albany, first paragraph; 2% rate under How does New Albany's minimum annual service payment formula work?, item 3",
          "supports": "City-reported payroll-equivalent tax-base figure at a 2% income-tax rate, not operator payroll or headcount."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "Company-level tax receipt, service-payment or TIRC record identifying the hyperscaler and components",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "wording-changed",
          "from": "Statewide tax/jobs scope; underlying operator not specified",
          "to": "One unnamed New Albany hyperscaler, tax year 2024 payable 2025; city-reported comparison",
          "reason": "The second review narrowed the place, taxpayer and time scope and made the missing underlying records explicit.",
          "by": "Software-assisted second check"
        }
      ],
      "entity_ids": [],
      "href": "/claims/new-albany-payroll-equivalent/",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-12",
      "related_pages": [
        {
          "title": "DataCenterData New Albany ledger",
          "url": "/projects/new-albany/"
        }
      ],
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "ohio-data-centers-no-taxes",
      "record_id": null,
      "topic": "Taxes / incentives",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Reading Ohio's equipment sales-and-use-tax exemption as meaning a qualifying project pays no taxes.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Taxes / incentives",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Ohio Revised Code §122.175 still supplies the eligibility framework: at least $100 million in project investment and at least $1.5 million in annual qualifying payroll, with agreement and annual verification requirements. It authorizes a complete or partial sales-and-use-tax exemption for qualifying data-center equipment. It does not by itself mean a qualifying project pays no taxes, and it does not repeal existing agreements. Whether new exemption requests remain paused is a separate claim (ohio-exemption-pause).",
      "unknown": "Net fiscal result of any named project; whether a named project complied with or received an exemption.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Ohio data-center tax-exemption statute",
          "publisher": "Ohio Legislative Service Commission / Ohio Revised Code",
          "class": "Gov. record",
          "published": "2025-09-30",
          "retrieved": "2026-09-12",
          "url": "https://codes.ohio.gov/ohio-revised-code/section-122.175",
          "locator": "https://codes.ohio.gov/ohio-revised-code/section-122.175",
          "supports": "The statute authorizes a complete or partial equipment sales-and-use-tax exemption for qualifying projects. It does not erase payroll withholding, all real-property taxes, local charges or negotiated payments, and it does not repeal existing agreements."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported",
          "to": "Contradicted",
          "reason": "The statute authorizes a complete or partial equipment sales-and-use-tax exemption; it does not establish that a qualifying project pays no taxes.",
          "by": "Software-assisted second check"
        }
      ],
      "entity_ids": [],
      "href": "/claims/ohio-data-centers-no-taxes/"
    },
    {
      "id": "meta-nuclear-direct",
      "record_id": "meta-new-albany-oh",
      "topic": "Power source",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Reading Meta's nuclear agreements as dedicated plants directly wired to the New Albany campus.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power source",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Meta says the agreements will deliver power to regional grids supporting its operations. New Albany says the campus draws from the regional grid. That is different from a dedicated wire or plant serving only the data center.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Company; Gov. record"
      },
      "sources": [
        {
          "title": "Meta nuclear-energy announcement",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-01",
          "retrieved": "2026-09-12",
          "url": "https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/",
          "locator": "https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/",
          "supports": "Meta announced nuclear-energy projects as company plans, not a proven direct supply relationship for a named Ohio campus."
        },
        {
          "title": "City of New Albany statement",
          "publisher": "City of New Albany",
          "class": "Gov. record",
          "published": "2026-01",
          "retrieved": "2026-09-12",
          "url": "https://newalbanyohio.org/news/2026/01/statement-regarding-metas-nuclear-energy-projects/",
          "locator": "https://newalbanyohio.org/news/2026/01/statement-regarding-metas-nuclear-energy-projects/",
          "supports": "Municipal statement about Meta's announcement; not independent proof of a completed nuclear-to-campus power contract."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-new-albany-oh"
      ],
      "href": "/claims/meta-nuclear-direct/"
    },
    {
      "id": "microsoft-jobs-now",
      "record_id": "microsoft-new-albany-oh",
      "topic": "Jobs / timing",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating Microsoft's roughly 50 operating employees per facility as current observed employment across three sites.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / timing",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Microsoft projects about 50 employees per facility once operational and says three facilities are to be operational by the end of 2029. Current construction activity and modeled jobs are not observed permanent operating headcount.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Not yet due",
      "confidence": {
        "level": "medium",
        "basis": "Company; Company"
      },
      "sources": [
        {
          "title": "Microsoft Licking County impact brief",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://local.microsoft.com/wp-content/uploads/2026/06/Economic-Impact_LickingCountyOH_FY26Q4.pdf",
          "locator": "https://local.microsoft.com/wp-content/uploads/2026/06/Economic-Impact_LickingCountyOH_FY26Q4.pdf",
          "supports": ""
        },
        {
          "title": "Microsoft Heath construction update",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
          "locator": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "microsoft-new-albany-oh",
        "microsoft-heath-oh",
        "microsoft-hebron-oh"
      ],
      "href": "/claims/microsoft-jobs-now/"
    },
    {
      "id": "ohio-water-permit",
      "record_id": null,
      "topic": "Water / permits",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating Ohio EPA's draft general permit as final blanket permission or proof of actual discharge.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Water / permits",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Ohio EPA's Community Notice dated 21 July 2026 states that draft permit OHD000001 will not be finalized and that individual NPDES permitting remains the appropriate path. The official notice was retrieved and preserved on 12 September; a later live recheck was unavailable. The abandoned draft was never blanket permission, and an individual permit is still permission—not proof of actual discharge or site compliance.",
      "unknown": "Individual permits for named data-center outfalls were not inventoried. An individual NPDES permit is permission, not measured discharge or proof of compliance.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Preserved Ohio EPA notice; government corroboration; newspaper republication"
      },
      "sources": [
        {
          "title": "Ohio EPA draft OHD000001",
          "publisher": "Ohio EPA",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://dam.assets.ohio.gov/image/upload/epa.ohio.gov/Portals/35/permits/Data_Centers/OHD000001_Draft.pdf",
          "locator": "https://dam.assets.ohio.gov/image/upload/epa.ohio.gov/Portals/35/permits/Data_Centers/OHD000001_Draft.pdf",
          "supports": "Draft OHD000001 was never blanket permission."
        },
        {
          "title": "Ohio EPA Community Notice: proposed data-center general permit will not be finalized",
          "publisher": "Ohio EPA",
          "class": "Gov. record",
          "published": "2026-07-21",
          "retrieved": "2026-09-12",
          "url": "https://epa.ohio.gov/divisions-and-offices/surface-water/permitting/npdes-general-permits",
          "locator": "Recent Activities → Ohio EPA Will NOT Finalize Proposed Data Center General Permit → Community Notice (July 21, 2026)",
          "supports": "Official agency notice that the draft general permit will not be finalized and individual NPDES permitting remains the appropriate path. The preserved official page was reviewed; a later live recheck returned unavailable."
        },
        {
          "title": "Ohio EPA notice republished by The Clermont Sun (July 21, 2026)",
          "publisher": "The Clermont Sun (republication of Ohio EPA notice)",
          "class": "Institution",
          "published": "2026-07-22",
          "retrieved": "2026-09-11",
          "url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
          "locator": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
          "supports": "Newspaper republication of the agency notice. This is not the agency record itself."
        },
        {
          "title": "Rep. Rader Applauds Ohio EPA Decision to Require Individual Wastewater Permits for Data Centers",
          "publisher": "Ohio House of Representatives",
          "class": "Gov. record",
          "published": "2026-07-21",
          "retrieved": "2026-09-12",
          "url": "https://ohiohouse.gov/members/tristan-rader/news/rep-rader-applauds-ohio-epa-decision-to-require-individual-wastewater-permits-for-data-centers-147223",
          "locator": "press release: Ohio EPA would not finalize a proposed statewide general wastewater discharge permit and would continue with individual NPDES permits",
          "supports": "Ohio House government page corroborates the agency decision."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "Draft Ohio data-center general NPDES permit treated as if it were a final, measured water authorization.",
          "to": "Ohio EPA said on July 21, 2026 that it would not finalize draft OHD000001 and would continue with individual NPDES permits. A permit is not measured discharge.",
          "reason": "Correction chronology uses the recorded date, not the 21 July agency-event date.",
          "evidence_url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
          "by": "DataCenterData review"
        },
        {
          "date": "2026-09-12",
          "kind": "locator-changed",
          "from": "The direct Ohio EPA decision notice had not been retrieved.",
          "to": "The preserved official Ohio EPA Community Notice is cited with its dated heading and exact page location.",
          "reason": "Primary-record follow-up recovered the agency's own notice, and the second review re-read it; a later live recheck was unavailable and is not treated as a retraction.",
          "evidence_url": "https://epa.ohio.gov/divisions-and-offices/surface-water/permitting/npdes-general-permits",
          "by": "Software-assisted second check"
        }
      ],
      "entity_ids": [],
      "href": "/claims/ohio-water-permit/",
      "review_status": "second_review_complete",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "new-albany-water-capacity",
      "record_id": null,
      "topic": "Water / capacity",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating New Albany's no-additional-capacity statement as proof that facility-level water impact is negligible.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Water / capacity",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "The city says it has not needed additional water capacity because of data centers. That city page still does not provide facility-level withdrawals. Google later published company-reported 2025 campus figures for New Albany, Lancaster and Lockbourne; those remain company claims with third-party limited assurance, not municipal meter audits. Independent utility/meter records, cooling share and peak-day demand remain missing for other operators.",
      "unknown": "Independent utility/meter records; cooling-only share; peak-day demand; operators other than Google's company-reported 2025 campus rows.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "City of New Albany data-center information",
          "publisher": "City of New Albany",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://datacenters.newalbanyohio.org/",
          "locator": "https://datacenters.newalbanyohio.org/",
          "supports": "City says it has not needed additional water capacity because of data centers. That is not facility-level metered withdrawal, consumption, discharge or peak-day demand."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [],
      "href": "/claims/new-albany-water-capacity/",
      "related_pages": [
        {
          "title": "DataCenterData water field definitions",
          "url": "/water/"
        }
      ]
    },
    {
      "id": "millersport-rate-impact",
      "record_id": "vantage-oh2-millersport",
      "topic": "Power / developer claim",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "The natural-gas power facility described as adjacent to Vantage's planned Millersport campus means the campus will not affect electricity costs for local residents or businesses.",
      "claimant": {
        "name": "Vantage",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Vantage Millersport campus FAQ",
          "url": "https://vantagemillersportcampus.com/faq/",
          "locator": "FAQ page"
        }
      },
      "unit_scope": {
        "unit": "Power / developer claim",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Vantage says the proposed Fairfield Energy Center would power its adjacent campus without connecting to the local or regional grid. A preserved OPSB summary describes a proposed 1,300 MW gas facility with up to 1,000 MW of battery storage; the developer instead reports up to 1,350 MW net generation and approximately 1,040 MW storage. Those figures are not data-center IT capacity. No certificate or hearing outcome has been verified; the evidentiary hearing is noticed for 17 September 2026. The plans cannot establish future retail-bill effects as an observed outcome.",
      "unknown": "The underlying OPSB application, hearing outcome, certificate status, and future effect on retail bills.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "Institution; Institution"
      },
      "sources": [
        {
          "title": "Vantage Millersport campus FAQ",
          "publisher": "Vantage Data Centers",
          "class": "Institution",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://vantagemillersportcampus.com/faq/",
          "locator": "https://vantagemillersportcampus.com/faq/",
          "supports": "Company prediction that the campus will not affect local electricity costs. Not an observed or regulatory finding."
        },
        {
          "title": "Fairfield Energy Center major-utility-facility page (OPSB case 26-0160-EL-BGN)",
          "publisher": "Fairfield Energy",
          "class": "Institution",
          "published": "",
          "retrieved": "2026-09-17",
          "url": "https://fairfieldenergycenter.com/home/utility-facility",
          "locator": "https://fairfieldenergycenter.com/home/utility-facility",
          "supports": "Developer-reported pending OPSB application. Generation and storage figures are not data-center IT capacity and are not a certificate or construction authorization."
        }
      ],
      "last_checked": "2026-09-17",
      "next_check": {
        "trigger": "Official OPSB docket 26-0160-EL-BGN after the 17 September 2026 hearing",
        "date": "2026-09-17"
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "locator-changed",
          "from": "Only company descriptions of the proposed adjacent power facility were cited.",
          "to": "The preserved official OPSB case summary is cited separately from the developer's differing generation and storage figures.",
          "reason": "Primary-record follow-up confirmed the proposal and hearing date while preserving the unresolved MW discrepancy and outcome hold.",
          "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-17",
          "kind": "locator-changed",
          "from": "The source link used an OPSB case-summary URL that now returns 404.",
          "to": "The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.",
          "reason": "The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.",
          "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "vantage-oh2-millersport"
      ],
      "href": "/claims/millersport-rate-impact/",
      "review_status": "second_review_complete",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "claim:meta-lebanon:investment",
      "record_id": "meta-lebanon",
      "topic": "investment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than $10 billion",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "investment",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "More than $10 billion",
      "unknown": "Completed or placed-in-service capital.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company and government announcement"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        },
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Company claim",
          "reason": "The exact investment figure is a Meta projection. The government announcement repeats it but does not establish completed or placed-in-service capital.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-investment/"
    },
    {
      "id": "claim:meta-lebanon:permanent-jobs",
      "record_id": "meta-lebanon",
      "topic": "permanent jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Approximately 300",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "permanent jobs",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "Approximately 300",
      "unknown": "Operating payroll and delivery schedule.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company and government projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        },
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Company claim",
          "reason": "The figure is a company projection; neither cited announcement is an observed payroll or employment record.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-permanent-jobs/"
    },
    {
      "id": "claim:meta-lebanon:construction-jobs",
      "record_id": "meta-lebanon",
      "topic": "construction jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than 4,000 at peak",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "construction jobs",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "More than 4,000 at peak",
      "unknown": "Observed peak, period and job-years.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company and government projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        },
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Company claim",
          "reason": "The peak construction-jobs figure is a company projection, not an observed workforce count or job-years measure.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-construction-jobs/"
    },
    {
      "id": "claim:meta-lebanon:power",
      "record_id": "meta-lebanon",
      "topic": "power",
      "state": "IN",
      "kind": "record-claim",
      "claim": "1 GW designed capacity",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "power",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "1 GW designed capacity",
      "unknown": "Contracted, energized and measured load.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company design claim"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-power/"
    },
    {
      "id": "claim:meta-lebanon:city-impact-payment",
      "record_id": "meta-lebanon",
      "topic": "city impact payment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "$1.5 million annually per completed phase, up to six phases",
      "claimant": {
        "name": "Indiana Economic Development Corporation",
        "role": "government",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Indiana Economic Development Corporation",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "city impact payment",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "$1.5 million annually per completed phase, up to six phases",
      "unknown": "Executed agreement, phase-completion definition, first due date and receipts.",
      "counterevidence": [],
      "verdict": "Supported",
      "confidence": {
        "level": "medium",
        "basis": "government-described term"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Supported",
          "reason": "The government announcement supports the stated term. It does not establish an executed agreement, a due date or any payment received.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-city-impact-payment/"
    },
    {
      "id": "claim:meta-lebanon:state-sales-tax-exemption",
      "record_id": "meta-lebanon",
      "topic": "state sales-tax exemption",
      "state": "IN",
      "kind": "record-claim",
      "claim": "35 years, extendable to 50",
      "claimant": {
        "name": "Indiana Economic Development Corporation",
        "role": "government",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Indiana Economic Development Corporation",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "state sales-tax exemption",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "35 years, extendable to 50",
      "unknown": "Controlling agreement and exemptions claimed.",
      "counterevidence": [],
      "verdict": "Supported",
      "confidence": {
        "level": "medium",
        "basis": "government-described performance thresholds"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Supported",
          "reason": "The government announcement supports the stated term. It does not establish the controlling agreement or exemptions actually claimed.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-state-sales-tax-exemption/"
    },
    {
      "id": "claim:meta-lebanon:cooling-water",
      "record_id": "meta-lebanon",
      "topic": "cooling water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Closed-loop liquid cooling; zero cooling water for most of the year",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "cooling water",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "Closed-loop liquid cooling; zero cooling water for most of the year",
      "unknown": "Operating configuration, total site water and measured consumption.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company design claim"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-cooling-water/"
    },
    {
      "id": "claim:meta-lebanon:ratepayer-protection",
      "record_id": "meta-lebanon",
      "topic": "ratepayer protection",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Meta says it will pay its full energy and utility costs",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "ratepayer protection",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "Meta says it will pay its full energy and utility costs",
      "unknown": "Utility contract and regulatory cost-allocation record.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company statement only"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-ratepayer-protection/"
    },
    {
      "id": "claim:aws-new-carlisle:investment",
      "record_id": "aws-new-carlisle",
      "topic": "investment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "$11 billion baseline; $13.8 billion later reported",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "investment",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "$11 billion baseline; $13.8 billion later reported",
      "unknown": "Eligible-capital, placed-in-service and geographic scope.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2024-04-25",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "supports": "Baseline investment, jobs, incentives and road contribution."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Chamber",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/pages/aws-economic/",
          "locator": "https://www.sbrchamber.com/pages/aws-economic/",
          "supports": "Reported 1,056 full-time AWS employees and other regional metrics."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-investment/"
    },
    {
      "id": "claim:aws-new-carlisle:permanent-jobs",
      "record_id": "aws-new-carlisle",
      "topic": "permanent jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "permanent jobs",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
      "unknown": "Project-specific CF-1, payroll definition, count date, residency and contractor treatment.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company/chamber-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2024-04-25",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "supports": "Baseline investment, jobs, incentives and road contribution."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Chamber",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/pages/aws-economic/",
          "locator": "https://www.sbrchamber.com/pages/aws-economic/",
          "supports": "Reported 1,056 full-time AWS employees and other regional metrics."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
          "to": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
          "reason": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
          "evidence_url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "by": "DataCenterData review"
        }
      ],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-permanent-jobs/"
    },
    {
      "id": "claim:aws-new-carlisle:buildout",
      "record_id": "aws-new-carlisle",
      "topic": "buildout",
      "state": "IN",
      "kind": "record-claim",
      "claim": "18 buildings reported vertical",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "buildout",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "18 buildings reported vertical",
      "unknown": "Final campus scope and completion.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-buildout/"
    },
    {
      "id": "claim:aws-new-carlisle:local-property-taxes",
      "record_id": "aws-new-carlisle",
      "topic": "local property taxes",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than $1 billion over 35 years",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "local property taxes",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "More than $1 billion over 35 years",
      "unknown": "Annual gross taxes, abatements and net receipts.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Chamber",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/pages/aws-economic/",
          "locator": "https://www.sbrchamber.com/pages/aws-economic/",
          "supports": "Reported 1,056 full-time AWS employees and other regional metrics."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-local-property-taxes/"
    },
    {
      "id": "claim:aws-new-carlisle:water",
      "record_id": "aws-new-carlisle",
      "topic": "water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Approximately 18 million gallons per year at full buildout",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "water",
        "scope": "AWS New Carlisle",
        "period": "full-buildout projection; undated as to operating year"
      },
      "supports": "AWS-authored/company-linked projection of about 18 million gallons per year at full buildout. Not permitted quantity, current metered use, or an independent delivery finding.",
      "unknown": "Permit quantity, current metered withdrawal/consumption, source-water mix and completion.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-water/"
    },
    {
      "id": "claim:aws-new-carlisle:community-grants",
      "record_id": "aws-new-carlisle",
      "topic": "community grants",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than $1.5 million",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "community grants",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "More than $1.5 million",
      "unknown": "Recipient-level awards and payment records.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-community-grants/"
    },
    {
      "id": "claim:aws-new-carlisle:state-incentives",
      "record_id": "aws-new-carlisle",
      "topic": "state incentives",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Up to $98.3 million is the sum of the four listed credit/grant programs and excludes the separately authorized 50-year sales-and-use-tax exemption, whose value is not stated here.",
      "claimant": {
        "name": "Indiana Economic Development Corporation",
        "role": "government",
        "said_on": "2024-04-25",
        "said_where": {
          "title": "Indiana Economic Development Corporation",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "state incentives",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "IEDC's 2024 announcement described up to $98.3 million across four listed credit/grant programs, a separate DATA sales-and-use-tax exemption, and up to $7 million for roads. Project 424567 portal records retrieved 12 September 2026 show HBI $55 million Executed with $0 paid/certified; EDGE $18.3 million Executed with $160,947 paid/certified; RTC $20 million in Post Term Reporting Period with $20 million paid/certified; and SEF $5 million Pending Accepted Offer. The DATA agreement lists an $800 million minimum qualified investment by 31 December 2038, an $11 billion extension test by 31 December 2043, and a maximum exemption deadline of 31 December 2073; section 6.D preserves IEDC discretion to deny, suspend, or extend the exemption if the $11 billion extension test is missed. These are portal fields and contract terms—not proof that benefits, jobs, or completed investment were independently observed.",
      "unknown": "Benefits earned, claimed and received; the meaning of DATA's $611,502,328 Paid/Certified to Date field; whether SEF is executed; RTC status meaning; independently observed jobs and placed-in-service investment.",
      "counterevidence": [],
      "verdict": "Supported",
      "confidence": {
        "level": "medium",
        "basis": "government-described performance package"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2024-04-25",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "supports": "Baseline investment, jobs, incentives and road contribution."
        },
        {
          "title": "IEDC Project 424567 — HBI contract detail",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/570abf9a0557ee11be6e001dd804e299",
          "locator": "Incentive Details and Project Performance Details: HBI $55,000,000; Executed; contract date 2025-11-06; Paid/Certified to Date $0",
          "supports": "Attributed portal status and fields for one incentive instrument; not proof of a cash payment or observed project outcome."
        },
        {
          "title": "IEDC Project 424567 — EDGE contract detail",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/b80e878e0557ee11be6e001dd804e792",
          "locator": "Incentive Details and Project Performance Details: EDGE $18,300,000; Executed; contract date 2025-11-06; Paid/Certified to Date $160,947",
          "supports": "Attributed portal status and fields for one incentive instrument; not proof of independently observed jobs."
        },
        {
          "title": "IEDC Project 424567 — RTC contract detail",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/570e921d0657ee11be6e001dd804e894",
          "locator": "Incentive Details and Project Performance Details: RTC $20,000,000; Post Term Reporting Period; contract date 2025-11-06; Paid/Certified to Date $20,000,000",
          "supports": "Attributed portal status and fields. The status is not relabeled Executed and the displayed amount is not characterized as cash paid."
        },
        {
          "title": "IEDC Project 424567 — SEF contract detail",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/d6f50dc00557ee11be6e001dd804e5c0",
          "locator": "Incentive Details: SEF $5,000,000; Pending Accepted Offer; no contract date or posted agreement PDF",
          "supports": "The training-grant instrument remains pending in the portal; it is not treated as executed."
        },
        {
          "title": "IEDC Project 424567 — DATA contract detail",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/8c0f68149feaee11904d001dd8306d4e",
          "locator": "Incentive Details and Project Performance Details: DATA Executed; contract date 2024-11-08; blank contract amount; Paid/Certified to Date $611,502,328; Actual Qualified Investment $8,735,747,538",
          "supports": "Attributed portal fields for the DATA instrument. The displayed figures are not characterized as cash paid or an independently audited placed-in-service total."
        },
        {
          "title": "IEDC DATA Center Tax Exemption Agreement — Project 424567",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2024-11-08",
          "retrieved": "2026-09-12",
          "url": "https://transparencyportal.iedc.in.gov/iedc-transparency-api/api/contract/8c0f68149feaee11904d001dd8306d4e/pdf",
          "locator": "PDF p. 1 sections 3.C and 3.E; p. 2 sections 6.C–D; p. 13 Exhibit A section 2.A–B; p. 15 Exhibit B",
          "supports": "Contractual investment thresholds, extension test, IEDC remedies and maximum exemption deadline. The agreement does not compel construction or prove benefits earned."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "locator-changed",
          "from": "The contract split was held because no independent retrieval was recorded.",
          "to": "Five Project 424567 portal instruments and the DATA agreement are cited with exact fields and contract locators.",
          "reason": "The second review reproduced the portal records while preserving the difference between authorized terms, portal fields, and observed outcomes.",
          "evidence_url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/8c0f68149feaee11904d001dd8306d4e",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Supported",
          "reason": "The government announcement, portal fields and agreement support the carefully limited description of authorized terms. They do not prove delivery, jobs or completed investment.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-state-incentives/",
      "review_status": "second_review_complete",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "claim:coreweave-hammond:expansion-design",
      "record_id": "coreweave-hammond",
      "topic": "expansion design",
      "state": "IN",
      "kind": "record-claim",
      "claim": "450,000 square feet; 180 MW; contemplated 20-year CoreWeave lease",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-10",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/hammond-approves-development-agreement-for-new-data-center/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "expansion design",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Development agreement expired; expansion not delivered.",
      "unknown": "Exact unsatisfied milestones.",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-approved proposal"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-10",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/hammond-approves-development-agreement-for-new-data-center/",
          "locator": "https://www.gohammond.com/hammond-approves-development-agreement-for-new-data-center/",
          "supports": "Approval, proposed building, tenant, power requirement and contingencies."
        },
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "DataCenterData review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-expansion-design/"
    },
    {
      "id": "claim:coreweave-hammond:permanent-jobs",
      "record_id": "coreweave-hammond",
      "topic": "permanent jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "35 to 90 jobs paying more than $75,000",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "permanent jobs",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Not delivered; due status not established.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-council projection"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "DataCenterData review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-permanent-jobs/"
    },
    {
      "id": "claim:coreweave-hammond:community-impact-payments",
      "record_id": "coreweave-hammond",
      "topic": "community impact payments",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Up to $4 million per year for 20 years",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "community impact payments",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Not shown due or paid.",
      "unknown": "Executed agreement and payment-trigger clauses.",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-council description"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        },
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "DataCenterData review"
        },
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "DataCenterData review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-community-impact-payments/"
    },
    {
      "id": "claim:coreweave-hammond:additional-payment",
      "record_id": "coreweave-hammond",
      "topic": "additional payment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "$25 million lump sum discussed",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-12-22",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10"
        }
      },
      "unit_scope": {
        "unit": "additional payment",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Minutes say it was not yet in the agreement.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "verbal concept in council discussion"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "DataCenterData review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-additional-payment/"
    },
    {
      "id": "claim:coreweave-hammond:incentives",
      "record_id": "coreweave-hammond",
      "topic": "incentives",
      "state": "IN",
      "kind": "record-claim",
      "claim": "10-year construction abatement and 20-year 100% technology deduction",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "incentives",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Claimed or received amounts not established.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-council description"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        },
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "DataCenterData review"
        },
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "DataCenterData review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-incentives/"
    },
    {
      "id": "claim:coreweave-hammond:power-agreement",
      "record_id": "coreweave-hammond",
      "topic": "power agreement",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Final NIPSCO agreement explicitly described as gating",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "power agreement",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "No executed agreement located; exact failed milestones undisclosed.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "city-council record"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        },
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "DataCenterData review"
        },
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "DataCenterData review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-power-agreement/"
    },
    {
      "id": "claim:coreweave-hammond:existing-facility",
      "record_id": "coreweave-hammond",
      "topic": "existing facility",
      "state": "IN",
      "kind": "record-claim",
      "claim": "DX-1 operating; operator publishes 105,000 square feet and up to 20 MW",
      "claimant": {
        "name": "Digital Crossroad",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Digital Crossroad Indiana data center page",
          "url": "https://digitalcrossroad.com/data-centers/indiana-data-center/",
          "locator": "operator facility page"
        }
      },
      "unit_scope": {
        "unit": "existing facility",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "DX-1 operating; operator publishes 105,000 square feet and up to 20 MW",
      "unknown": "Capacity scope is not classified as critical IT load.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "operator-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Digital Crossroad",
          "class": "Company",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-10",
          "url": "https://digitalcrossroad.com/data-centers/indiana-data-center/",
          "locator": "https://digitalcrossroad.com/data-centers/indiana-data-center/",
          "supports": "Existing facility operation, published area and up-to-20-MW capacity."
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-existing-facility/"
    },
    {
      "id": "claim:microsoft-quincy:cooling-water",
      "record_id": "microsoft-quincy",
      "topic": "Cooling + water",
      "state": "WA",
      "kind": "record-claim",
      "claim": "EPA documents an operating water-reuse system serving Microsoft's Quincy campus.",
      "claimant": {
        "name": "US EPA case study",
        "role": "government",
        "said_on": null,
        "said_where": {
          "title": "US EPA case study",
          "url": "https://www.epa.gov/waterreuse/water-reuse-case-study-quincy-washington",
          "locator": "Project Highlights; Solution paragraphs 2-4; Make-up Water Sources paragraphs 2 and 4"
        }
      },
      "unit_scope": {
        "unit": "cooling-water reuse; estimated annual potable savings; reported annual canal makeup; annual potable makeup share",
        "scope": "City of Quincy reuse system serving Microsoft's Quincy campus",
        "period": "operation since 2021; connection status reported for 2022 with some early-2023 context"
      },
      "supports": "EPA documents operation beginning June 30, 2021 and describes a city-operated treatment and recirculation system serving Microsoft's campus. EPA estimates 138 million gallons per year of potable-water savings, reports about 260 million gallons per year of canal-water makeup and says potable groundwater supplies about 5% of annual makeup. These are different measures and are not additive total consumption or a current meter audit.",
      "unknown": "Current measured withdrawal, consumption and discharge; a reconciled explanation of Microsoft's separate 380-million-gallon estimate; and operating changes after EPA's dated observations.",
      "counterevidence": [
        {
          "title": "Microsoft launch account 380 million gallon figure",
          "url": "https://local.microsoft.com/blog/partnering-with-the-city-of-quincy-to-open-washingtons-first-industrial-water-reuse-center/",
          "locator": "company launch story",
          "shows": "A different potable-savings estimate than EPA 138M."
        }
      ],
      "verdict": "Supported",
      "confidence": {
        "level": "high",
        "basis": "government case study"
      },
      "sources": [
        {
          "title": "US EPA case study",
          "publisher": "US Environmental Protection Agency",
          "class": "Gov. record",
          "published": "updated 2026-07-06; original publication not established",
          "retrieved": "2026-09-12",
          "url": "https://www.epa.gov/waterreuse/water-reuse-case-study-quincy-washington",
          "locator": "Project Highlights; Solution paragraphs 2-4; Make-up Water Sources paragraphs 2 and 4",
          "supports": "Operation since 2021, reuse-system design, estimated potable-water savings and reported makeup-water figures. Not current total consumption."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "Recheck current operating status against a later agency or utility record",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "wording-changed",
          "from": "Microsoft Quincy: Supported as delivered; combined measures and a 2021-2022 observation window",
          "to": "EPA documents an operating reuse system; distinct estimates and dated observations are separated",
          "reason": "The second review separated estimated savings, canal makeup and potable makeup share and removed an unsupported original-publication year.",
          "by": "Software-assisted second check"
        }
      ],
      "entity_ids": [
        "microsoft-quincy"
      ],
      "href": "/claims/microsoft-quincy-cooling-water/",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-12",
      "as_of": "EPA observations spanning operation from 2021, 2022 connection status and early-2023 context",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "claim:microsoft-mount-pleasant:cooling-water",
      "record_id": "microsoft-mount-pleasant",
      "topic": "Cooling + water",
      "state": "WI",
      "kind": "record-claim",
      "claim": "Microsoft says its Mount Pleasant pilot will use closed-loop chip-level cooling without evaporating water for cooling.",
      "claimant": {
        "name": "Microsoft",
        "role": "company",
        "said_on": "2024-12-09",
        "said_where": {
          "title": "Microsoft design disclosure",
          "url": "https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/12/09/sustainable-by-design-next-generation-datacenters-consume-zero-water-for-cooling/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "cooling-water design",
        "scope": "Microsoft Mount Pleasant pilot, Wisconsin",
        "period": "2026 and late 2027"
      },
      "supports": "Microsoft says Mount Pleasant will pilot the closed-loop design in 2026 and says sites using the new design will begin coming online in late 2027. This is a design claim, not an operating measurement.",
      "unknown": "Operating configuration, initial-fill volume, other site water uses, and measured withdrawal, consumption, and discharge.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company announcement"
      },
      "sources": [
        {
          "title": "Microsoft design disclosure",
          "publisher": "",
          "class": "Company",
          "published": "2024-12-09",
          "retrieved": "2026-09-16",
          "url": "https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/12/09/sustainable-by-design-next-generation-datacenters-consume-zero-water-for-cooling/",
          "locator": "https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/12/09/sustainable-by-design-next-generation-datacenters-consume-zero-water-for-cooling/",
          "supports": "Closed-loop cooling design, initial-fill boundary, Mount Pleasant pilot timing, and stated online timing."
        }
      ],
      "last_checked": "2026-09-16",
      "next_check": {
        "trigger": "Mount Pleasant pilot operating evidence or a site-specific water-use disclosure",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-16",
          "kind": "wording-changed",
          "from": "Microsoft Mount Pleasant: Announced",
          "to": "Microsoft says its Mount Pleasant pilot will use closed-loop chip-level cooling without evaporating water for cooling.",
          "reason": "A source re-read replaced a generated status label with the exact company claim and restored a concise unit boundary.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "microsoft-mount-pleasant"
      ],
      "href": "/claims/microsoft-mount-pleasant-cooling-water/"
    },
    {
      "id": "claim:google-the-dalles:cooling-water",
      "record_id": "google-the-dalles",
      "topic": "Cooling + water",
      "state": "OR",
      "kind": "record-claim",
      "claim": "Google says The Dalles aquifer project added more than 100 million gallons a year of stored-water capacity for the community.",
      "claimant": {
        "name": "Google",
        "role": "company",
        "said_on": "2025-10-22",
        "said_where": {
          "title": "Google project announcement",
          "url": "https://blog.google/company-news/outreach-and-initiatives/sustainability/the-dalles-oregon-water/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "stored-water capacity",
        "scope": "City of The Dalles aquifer storage project; not data-center water use",
        "period": "annual"
      },
      "supports": "Google says it transferred the aquifer storage and recovery system and associated groundwater rights to the city, providing the community with more than 100 million additional gallons annually. The figure is not data-center consumption.",
      "unknown": "Site-specific cooling design, cooling-water source, and measured data-center withdrawal, consumption, and discharge.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company announcement"
      },
      "sources": [
        {
          "title": "Google project announcement",
          "publisher": "",
          "class": "Company",
          "published": "2025-10-22",
          "retrieved": "2026-09-16",
          "url": "https://blog.google/company-news/outreach-and-initiatives/sustainability/the-dalles-oregon-water/",
          "locator": "https://blog.google/company-news/outreach-and-initiatives/sustainability/the-dalles-oregon-water/",
          "supports": "Completion and transfer of the aquifer storage system and Google's stated annual community-capacity figure."
        }
      ],
      "last_checked": "2026-09-16",
      "next_check": {
        "trigger": "A utility, permit, or operating disclosure that separates data-center water use from the city aquifer project",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-16",
          "kind": "wording-changed",
          "from": "Google The Dalles: Mixed evidence",
          "to": "Google says The Dalles aquifer project added more than 100 million gallons a year of stored-water capacity for the community.",
          "reason": "A source re-read replaced a generated status label with the exact company claim and separated community storage capacity from data-center water use.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "google-the-dalles"
      ],
      "href": "/claims/google-the-dalles-cooling-water/"
    },
    {
      "id": "claim:aws-new-carlisle:cooling-water",
      "record_id": "aws-new-carlisle",
      "topic": "Cooling + water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Source-water mix, permitted quantity, and current metered withdrawal/consumption at AWS New Carlisle.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "water source and metered use",
        "scope": "AWS New Carlisle",
        "period": "current operating period not established"
      },
      "supports": "The reviewed AWS-authored account does not establish source-water mix, a permit quantity, or current metered withdrawal/consumption. The 18-million-gallon figure is a company full-buildout projection tracked on claim:aws-new-carlisle:water.",
      "unknown": "Source water, permitted quantity, current metered withdrawal/consumption, and completion.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "AWS-authored opinion hosted by the South Bend Regional Chamber"
      },
      "sources": [
        {
          "title": "AWS economic-development account",
          "publisher": "",
          "class": "Chamber",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-cooling-water/"
    },
    {
      "id": "claim:google-fort-wayne:cooling-water",
      "record_id": "google-fort-wayne",
      "topic": "Cooling + water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "The reviewed utility order establishes Google Fort Wayne's cooling design and water use.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "cooling design and water use",
        "scope": "Google Fort Wayne campus, Indiana",
        "period": "through the order approved 2026-04-29"
      },
      "supports": "The order establishes that the site was energized in November 2024 and that Google had begun operation, but it does not establish cooling architecture or a water metric.",
      "unknown": "Cooling architecture, source water, and permitted or measured withdrawal, consumption, and discharge.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "low",
        "basis": "utility commission final order"
      },
      "sources": [
        {
          "title": "Indiana IURC order 46276",
          "publisher": "",
          "class": "Gov. record",
          "published": "2026-04-29",
          "retrieved": "2026-09-16",
          "url": "https://www.in.gov/iurc/files/ord_46276_042926.pdf",
          "locator": "https://www.in.gov/iurc/files/ord_46276_042926.pdf",
          "supports": "November 2024 energization and begun-operation status; no cooling or water metric."
        }
      ],
      "last_checked": "2026-09-16",
      "next_check": {
        "trigger": "A water permit, utility disclosure, or site-specific cooling statement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-16",
          "kind": "wording-changed",
          "from": "Google Fort Wayne: Not verifiable",
          "to": "The reviewed utility order establishes Google Fort Wayne's cooling design and water use.",
          "reason": "A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "google-fort-wayne"
      ],
      "href": "/claims/google-fort-wayne-cooling-water/"
    },
    {
      "id": "claim:meta-jeffersonville:cooling-water",
      "record_id": "meta-jeffersonville",
      "topic": "Cooling + water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Meta's Jeffersonville announcement establishes the campus's cooling design and water use.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "cooling design and water use",
        "scope": "Meta Jeffersonville campus, Indiana",
        "period": "announcement published 2024-01-25"
      },
      "supports": "The announcement describes campus size, investment, jobs, renewable-energy support, and a LEED goal, but does not state cooling architecture or a water quantity.",
      "unknown": "Cooling architecture, source water, and permitted or measured withdrawal, consumption, and discharge.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "low",
        "basis": "company announcement"
      },
      "sources": [
        {
          "title": "Meta project announcement",
          "publisher": "",
          "class": "Company",
          "published": "2024-01",
          "retrieved": "2026-09-16",
          "url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
          "locator": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
          "supports": "Campus announcement contents and the absence of a site-specific cooling or water-use disclosure."
        }
      ],
      "last_checked": "2026-09-16",
      "next_check": {
        "trigger": "A water permit, utility disclosure, or site-specific cooling statement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-16",
          "kind": "wording-changed",
          "from": "Meta Jeffersonville: Not verifiable",
          "to": "Meta's Jeffersonville announcement establishes the campus's cooling design and water use.",
          "reason": "A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.",
          "by": "Editorial classification update"
        },
        {
          "date": "2026-09-16",
          "kind": "verdict-changed",
          "from": "Company claim",
          "to": "Unknown",
          "reason": "The page tests a common inference about what the announcement establishes; Meta did not make the cooling-and-water statement shown.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-jeffersonville"
      ],
      "href": "/claims/meta-jeffersonville-cooling-water/"
    },
    {
      "id": "claim:microsoft-la-porte:incentives",
      "record_id": "microsoft-la-porte",
      "topic": "Incentives",
      "state": "IN",
      "kind": "record-claim",
      "claim": "La Porte Common Council terminated Microsoft's local tax abatement and the state DATA exemption is executed.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "local and state incentive status",
        "scope": "Microsoft La Porte",
        "period": "minutes 2026-03-02; IEDC portal observation 2026-09-11"
      },
      "supports": "The 2 March 2026 council minutes record unanimous adoption of Resolution R-3-2026, whose agenda title describes rescission of the 2024 Microsoft taxpayer agreement, including termination of the tax abatement. DataCenterData has not obtained the adopted resolution text and therefore does not independently state its full legal effect. IEDC showed the state DATA exemption as a pending accepted offer when checked.",
      "unknown": "Adopted resolution text and full legal effect; whether the IEDC DATA offer has been executed.",
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Municipal minutes describe adoption of a titled resolution; controlling signed text was not obtained."
      },
      "sources": [
        {
          "title": "La Porte Common Council minutes, March 2, 2026",
          "publisher": "City of La Porte",
          "class": "Gov. record",
          "published": "2026-03-02",
          "retrieved": "2026-09-12",
          "url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
          "locator": "Introduction of a Resolution; Bert Cook remarks identifying the 2024 Microsoft agreement; Motion/Vote – Adopt Resolution R-3-2026; and the following resolution caption",
          "supports": "Minutes record introduction and unanimous adoption of R-3-2026 under that agenda title. They are not the signed resolution text."
        },
        {
          "title": "IEDC Transparency Portal contract record, Microsoft Corporation (Project ID 425481, fund type DATA)",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "current as reviewed 2026-09-11",
          "retrieved": "2026-09-11",
          "url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/210ab15f3de5ee11904d001dd8306d4e",
          "locator": "status 'Pending Accepted Offer'; expected qualified investment $2,980,000,000; expected new jobs by contract end 200; no agreement PDF posted",
          "supports": "Portal observation that the state DATA exemption remained a pending accepted offer when checked. Not an executed agreement."
        }
      ],
      "next_check": {
        "trigger": "Obtain the signed text of Resolution R-3-2026 and any executed IEDC DATA agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "35-year state sales-tax exemption for at least $1B eligible capital, with possible extensions; local and NIPSCO incentives referenced but not yet reconciled.",
          "to": "Minutes record unanimous adoption of R-3-2026 under a title describing rescission of the 2024 taxpayer agreement and termination of its tax abatement; adopted resolution text not obtained; IEDC DATA exemption pending.",
          "reason": "Correction chronology uses the recorded date 2026-09-11; the source event date remains 2026-03-02.",
          "evidence_url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
          "by": "DataCenterData review"
        }
      ],
      "href": "/claims/microsoft-la-porte-incentives/",
      "counterevidence": [],
      "entity_ids": [
        "microsoft-la-porte"
      ],
      "last_checked": "2026-09-12",
      "review_status": "second_review_complete",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "claim:google-ohio:2025-campus-water",
      "record_id": null,
      "topic": "Water",
      "state": "OH",
      "kind": "record-claim",
      "claim": "Google reported 2025 withdrawal, discharge and consumption figures for its New Albany, Lancaster and Lockbourne campuses.",
      "claimant": {
        "name": "Google",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Google 2026 Environmental Report, p. 97",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "locator": "physical and printed p. 97, Water use by data center location — 2025"
        }
      },
      "unit_scope": {
        "unit": "million gallons",
        "scope": "Google-named Ohio campuses",
        "period": "calendar year 2025"
      },
      "supports": "Google's 2026 Environmental Report p. 97 publishes company-reported calendar-year 2025 figures, in million gallons: New Albany withdrawal 1,008.1 / discharge 172.4 / consumption 835.7; Lancaster 307.1 / 171.3 / 135.8; Lockbourne 460.8 / 101.3 / 359.5. DataCenterData independently re-extracted Google's table; that does not independently measure the underlying water. These are not city-meter evidence, cooling-only measures, or peak-day rates. Lockbourne remains a source label and is not attached to the Columbus campus record.",
      "unknown": "Independent utility/meter corroboration; cooling share; peak-day demand; operators other than Google.",
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "Company environmental report; not a municipal meter audit."
      },
      "sources": [
        {
          "title": "Google 2026 Environmental Report",
          "publisher": "Google",
          "class": "Company",
          "published": "2026",
          "retrieved": "2026-09-12",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "locator": "physical and printed p. 97 of 117, Water use by data center location — 2025; withdrawal, discharge and consumption columns; endnote 224",
          "supports": "Company-reported 2025 withdrawal, discharge and consumption by named campus. Google says water is potable unless specified. Third-party limited assurance is not a municipal meter audit."
        }
      ],
      "next_check": {
        "trigger": "Municipal or utility meter records for the named campuses",
        "date": null
      },
      "entity_ids": [
        "google-new-albany-oh",
        "google-lancaster-oh"
      ],
      "related_pages": [
        {
          "title": "Ohio projects",
          "url": "/ohio/#projects"
        }
      ],
      "href": "/claims/google-ohio-2025-campus-water/",
      "counterevidence": [],
      "history": [
        {
          "date": "2026-09-12",
          "kind": "locator-changed",
          "from": "The evidence link opened the report landing page and described the unit as million US gallons.",
          "to": "The evidence link opens the report PDF, cites the exact p. 97 table, and uses its printed unit, million gallons.",
          "reason": "Independent re-extraction confirmed the three Google-reported Ohio rows without turning company reporting into municipal measurement.",
          "evidence_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "by": "Software-assisted second check"
        }
      ],
      "last_checked": "2026-09-12",
      "review_status": "second_review_complete",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "ohio-exemption-pause",
      "record_id": null,
      "topic": "Taxes / incentives",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Ohio's data-center sales-and-use-tax exemption statute has been repealed, or existing agreements were cancelled, by Governor DeWine's pause.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "new exemption-request pause",
        "scope": "Ohio",
        "period": "pause announced 2026-05-27; currentness reported 2026-08-06"
      },
      "supports": "ORC §122.175 remains the statute and still sets the $100 million capital / $1.5 million payroll thresholds. The pause applies to new requests and does not repeal the statute or existing agreements. WOSU / Statehouse News Bureau reported on 6 August 2026 that Governor DeWine said the freeze 'will continue until I leave office.'",
      "unknown": "The governor's direct May communication was not independently retrieved. Official Tax Credit Authority text of the pause was not obtained.",
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Statute opened 2026-09-12; currentness attributed to WOSU/Statehouse News Bureau 2026-08-06, also opened 2026-09-12."
      },
      "sources": [
        {
          "title": "Ohio Revised Code §122.175",
          "publisher": "Ohio Legislative Service Commission",
          "class": "Gov. record",
          "published": "2025-09-30",
          "retrieved": "2026-09-12",
          "url": "https://codes.ohio.gov/ohio-revised-code/section-122.175",
          "locator": "§122.175(A)(5) $100 million capital / $1.5 million annual qualifying payroll; (B) complete or partial exemption",
          "supports": "The statute remains in force as the eligibility framework."
        },
        {
          "title": "DeWine: Ohio data center tax break is for next governor to decide on",
          "publisher": "WOSU / Statehouse News Bureau",
          "class": "News",
          "published": "2026-08-06",
          "retrieved": "2026-09-12",
          "url": "https://www.wosu.org/2026-08-06/dewine-ohio-data-center-tax-break-is-for-next-governor-to-decide-on",
          "locator": "paragraphs quoting Gov. Mike DeWine: 'That will continue until I leave office.' Published August 6, 2026.",
          "supports": "Attributed currentness of the new-request pause through the remainder of Governor DeWine's term. Not an independently retrieved governor communication."
        }
      ],
      "next_check": {
        "trigger": "Official Tax Credit Authority or governor record of the pause, or a successor action after DeWine leaves office",
        "date": null
      },
      "href": "/claims/ohio-exemption-pause/",
      "counterevidence": [],
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported",
          "to": "Contradicted",
          "reason": "The reviewed statute remains in force, and the reported pause concerns new requests rather than repeal or cancellation of existing agreements.",
          "by": "Software-assisted second check"
        }
      ],
      "entity_ids": [],
      "last_checked": "2026-09-12"
    },
    {
      "id": "claim:vantage-oh1-new-albany:opening",
      "record_id": "vantage-oh1-new-albany",
      "topic": "Opening status",
      "state": "OH",
      "kind": "record-claim",
      "claim": "Vantage OH1's first building opened by December 2025 and is now operating.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "opening / operating milestone",
        "scope": "Vantage OH1, three-building campus",
        "period": "projected December 2025; checked 2026-09-12"
      },
      "supports": "The operator page supports a planned three-building campus with 192 MW of planned critical IT load. It still carries a December 2025 first-building target and does not say the building opened. Actual opening is unknown. The passed December 2025 target is stale.",
      "unknown": "Whether any OH1 building has opened or is serving load.",
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Operator page rechecked 2026-09-12; it states a target, not an opening confirmation."
      },
      "sources": [
        {
          "title": "Vantage OH1 campus overview",
          "publisher": "Vantage Data Centers",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "locator": "planned three-building campus, 192 MW critical IT load, December 2025 first-building target without opening confirmation",
          "supports": "Planned specifications and a stale opening target. Not current load, grid demand, or an opening confirmation."
        }
      ],
      "next_check": {
        "trigger": "Dated operator or municipal opening confirmation",
        "date": null
      },
      "as_of": "December 2025 target",
      "href": "/claims/vantage-oh1-new-albany-opening/",
      "counterevidence": [],
      "history": [
        {
          "date": "2026-09-12",
          "kind": "correction",
          "from": "The tested opening proposition was attributed directly to Vantage Data Centers.",
          "to": "The proposition is labeled as a common reading; Vantage is cited only for its December 2025 opening target.",
          "reason": "The operator page states a forecast and does not claim that the first building opened or is operating.",
          "evidence_url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "by": "Software-assisted second check"
        }
      ],
      "entity_ids": [
        "vantage-oh1-new-albany"
      ],
      "last_checked": "2026-09-12",
      "review_status": "second_review_complete",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "claim:vantage-oh2-millersport:opsb-status",
      "record_id": "vantage-oh2-millersport",
      "topic": "OPSB / generation status",
      "state": "OH",
      "kind": "record-claim",
      "claim": "Fairfield Energy says it submitted an OPSB application for up to 1,350 MW of net gas generation and approximately 1,040 MW of battery storage.",
      "claimant": {
        "name": "Fairfield Energy",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Fairfield Energy utility-facility page",
          "url": "https://fairfieldenergycenter.com/home/utility-facility",
          "locator": "OPSB Case 26-0160-EL-BGN"
        }
      },
      "unit_scope": {
        "unit": "OPSB application status and MW kind",
        "scope": "Fairfield Energy Center adjacent to Vantage OH2",
        "period": "application pending; hearing noticed for 2026-09-17"
      },
      "supports": "A preserved OPSB summary describes a proposed 1,300 MW gas facility with up to 1,000 MW of battery storage. Fairfield Energy's page instead says it submitted the same case for up to 1,350 MW net gas generation plus approximately 1,040 MW of battery storage. Those figures are separate from Vantage OH2's 696 MW planned critical-IT capacity and cannot be added to it. The underlying filing was not obtained, so the discrepancy remains unresolved. The evidentiary hearing is noticed for 17 September 2026; no hearing outcome or certificate has been verified.",
      "unknown": "Underlying application and staff report; reason for the official/company MW discrepancy; hearing outcome; any OPSB certificate or construction authorization.",
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "Developer page; official docket documents were not retrieved."
      },
      "sources": [
        {
          "title": "Fairfield Energy Center major-utility-facility page (OPSB case 26-0160-EL-BGN)",
          "publisher": "Fairfield Energy",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-17",
          "url": "https://fairfieldenergycenter.com/home/utility-facility",
          "locator": "OPSB Case 26-0160-EL-BGN; up to 1,350 MW net gas plus approximately 1,040 MW battery; construction cannot begin until required approvals",
          "supports": "Developer-reported pending application. Not a certificate, and not data-center IT capacity."
        }
      ],
      "next_check": {
        "trigger": "Official OPSB docket 26-0160-EL-BGN after the 17 September 2026 hearing",
        "date": "2026-09-17"
      },
      "href": "/claims/vantage-oh2-millersport-opsb-status/",
      "counterevidence": [],
      "history": [
        {
          "date": "2026-09-12",
          "kind": "locator-changed",
          "from": "The claim cited only Fairfield Energy's application description.",
          "to": "The claim now separates the preserved OPSB summary's 1,300/1,000 MW figures from Fairfield Energy's 1,350/1,040 MW figures.",
          "reason": "The official and company summaries disagree; neither is converted to data-center IT capacity and the underlying filing remains unavailable.",
          "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-17",
          "kind": "locator-changed",
          "from": "The source link used an OPSB case-summary URL that now returns 404.",
          "to": "The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.",
          "reason": "The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.",
          "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "vantage-oh2-millersport"
      ],
      "last_checked": "2026-09-17",
      "review_status": "second_review_complete",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    }
  ],
  "publication": {
    "license": null,
    "reuse_scope": "reference only unless a record is explicitly rights-cleared",
    "rights_manifest": "/data/rights-manifest.json"
  }
}