Water & cooling · Google Bermuda Hundred Data Center Campus · VA

Chesterfield County's July 2026 status table lists a maximum water usage of 6.000 MGD for Peanut LLC at 2100 Bermuda Hundred Road.

A verdict applies only to the wording shown.

Company claims are shown as stated; they are not findings.

In short

Supported as of Chesterfield table as of July 2026 Independent evidence supports the claim as stated, for the stated period. Not permanent; not proof of related claims. How verdicts work →

Who said it
Said by Chesterfield County · government record in Chesterfield County Data Centers — Project Status as of July 2026
What the evidence supports
The county page heading is 'Data Center Project Status as of July 2026' and states that maximum water usage is shown in million gallons per day (MGD). Applies to the wording and period shown (Chesterfield table as of July 2026).
Biggest limitation
Current measured withdrawal or consumption;
Checked
21 September 2026 · Next check: when A later county status table, or a metered or billed water figure for this row

Evidence

What the evidence supports

The county page heading is 'Data Center Project Status as of July 2026' and states that maximum water usage is shown in million gallons per day (MGD). The Peanut LLC row lists 2100 Bermuda Hundred Road, status 'Under construction; three buildings,' and maximum water usage 6.000 MGD. That is the table's published maximum-water-usage figure for that row, not metered consumption, wastewater, or IT load. A FAQ on the same page says Google's Bermuda Hundred Road property has an agreement allowing a maximum of 6 million gallons per day; that sentence names Google as an agreement party and is not used here as operator, title owner, or current use. The Peanut Tax Rate and Water Agreement PDF linked from the same page describes tracts at 2400 and 2700 Bermuda Hundred Road; those street numbers are not reconciled with the table's 2100.

Still unknown

Current measured withdrawal or consumption; operator and title-owner legal roles; reconciliation of 2100 versus 2400 and 2700 Bermuda Hundred Road.

Sources

  1. Chesterfield County Data Centers — Project Status as of July 2026 → Archived copy Gov. record

    Exact location Heading 'Data Center Project Status as of July 2026'; table row 'Peanut LLC / 2100 Bermuda Hundred Road / Under construction; three buildings / 6.000 MGD'. FAQ paragraph: agreement maximum of 6 million gallons per day at Google's Bermuda Hundred Road property. Original page-publication date not established.

    What it supports Table maximum water usage of 6.000 MGD for the Peanut LLC row. Not measured use, not IT load, and not an operator finding.

    Publication date unavailable · Accessed

Scope

Unit
maximum water usage (MGD), as labeled in the county table
Geography
Peanut LLC row, 2100 Bermuda Hundred Road
Period
county table as of July 2026; page retrieved 2026-09-21
As of
Chesterfield table as of July 2026
Confidence
high — Chesterfield County data-centers page opened 2026-09-21; 6.000 MGD is the table cell for the Peanut LLC row.
Kind
Statement by a named party

Conflicting evidence

None recorded when this claim was checked. That records what we logged, not a finding that no conflicting record exists.

Chronology

  1. Source retrieved
  2. Sources re-read (software-assisted second check, not an outside audit)
  3. Checked by DataCenterData
  4. Date not established Stated by Chesterfield County — statement date not established
  5. Date not established Next check: when A later county status table, or a metered or billed water figure for this row

Corrections and history

No corrections or wording changes recorded for this claim.

Data and actions

This claim as JSON →

Suggest a correction → Claim ID claim:google-bermuda-hundred-data-center-campus-va:max-public-water and this page are prefilled. Accepted material corrections appear publicly on Changes.