Power · NV

Upon completion, EdgeCore says its Reno campus will support 216 MW of critical IT load across about one million square feet on 56 acres.

A verdict applies only to the wording shown.

Company claims are shown as stated; they are not findings.

Public statement checked

Answer

Verdict on the wording above: Company claim as of EdgeCore Reno page checked 2026-10-01 The only support is the company or its agents. Shown as stated, not adopted. Not a finding that it is true or false. How verdicts work →

Who stated it
Said by EdgeCore Digital Infrastructure · company statement in EdgeCore Reno campus page →
What the evidence establishes
EdgeCore's page states 216 MW of critical IT capability upon completion, three buildings, and 56 acres. The prose says nearly 1 million square feet and a details line says 1 million. A water-use rating below 0.01 is a design statement. No completion year is stated. Shown as the company's statement, not as a finding either way.
Biggest limitation
The completion year. Whether any building or substation is finished. Utility capacity as distinct from the 216 MW critical IT figure. Measured water use.
Checked
1 October 2026 · Next review: A later EdgeCore or utility record with a completion date, operating IT load, or a separate utility capacity

Evidence

What the evidence supports

The EdgeCore Reno page says that upon completion the campus will total nearly 1 million square feet and have the capability to support 216 MW of critical IT load. A later sentence says it will provide 216 MW of critical IT load across nearly 1 million square feet on 56 acres, in three buildings. A market-details line on the same page reads 216 MW, 1 million square feet, and 3 data centers. Both area wordings are on the page. The page says an air-cooled, closed-loop design uses very little water and carries a water-use effectiveness rating below 0.01 liters per kilowatt-hour. It says power availability is contracted in the near term and does not state a calendar year, a finished substation, or a utility megawatt figure. No publication date is printed as the statement date. A template timestamp on the fetched page is not that date.

Still unknown

The completion year. Whether any building or substation is finished. Utility capacity as distinct from the 216 MW critical IT figure. Measured water use.

Sources

  1. EdgeCore Reno data center page → Company

    Exact location Opening: upon completion, nearly 1 million square feet and 216 MW of critical IT load. Later: 216 MW across nearly 1 million square feet on 56 acres, three buildings. Details line: 216 MW, 1 million square feet, 3 data centers. Water section: WUE below 0.01 L/kWh.

    What it supports States planned critical IT capability, area, acres, and a design water-use rating. Does not state a completion year.

    Publication date unavailable · Accessed

Review details

Scope

Unit
planned campus critical IT capability
Geography
EdgeCore Reno campus, Tahoe-Reno Industrial Center, Nevada
Period
stated as applying upon completion; no completion date on the page
As of
EdgeCore Reno page checked 2026-10-01
Confidence
medium — Operator campus page opened 2026-10-01. No permit or utility record reviewed.
Kind
Public statement checked

Conflicting evidence

None recorded when this claim was checked. That records what we logged, not a finding that no conflicting record exists.

Chronology

  1. Source retrieved
  2. Checked by DataCenterData
  3. Date not established Stated by EdgeCore Digital Infrastructure — statement date not established
  4. Date not established Next review: A later EdgeCore or utility record with a completion date, operating IT load, or a separate utility capacity

Corrections and history

No corrections or wording changes recorded for this claim.

Data

This claim as JSON →

Suggest a correction

Suggest a correction → Claim ID edgecore-reno-campus-capability and this page are prefilled. Accepted material corrections appear publicly on Changes.