The reviewed utility order establishes Google Fort Wayne's cooling design and water use.
Limit: Cooling architecture, source water, and permitted or measured withdrawal, consumption, and discharge.
Claims · by operator
3 checked claims so far about projects whose record names Google as operator or developer. “About” is not “said by”: 2 were said by a company and 1 are common readings or statements by others. Not a count of Google facilities.
3 claims · newest check first
A verdict applies only to the wording shown.
Company claims are shown as stated; they are not findings.
Limit: Cooling architecture, source water, and permitted or measured withdrawal, consumption, and discharge.
Limit: Site-specific cooling design, cooling-water source, and measured data-center withdrawal, consumption, and discharge.
Limit: Independent utility/meter corroboration;
What this covers. 3 checked claims so far about Google projects. They concern data-center projects in Indiana (1), Ohio (1) and Oregon (1). That is because those are the Google claims DataCenterData has checked, not a count of claims or of data centers. Where a state, operator, project or topic shows no checked claim, read it as “not yet checked by DataCenterData”.
What a verdict means. A verdict applies only to the wording shown and the evidence linked on the check date. “Unknown” means the reviewed evidence did not establish the point; it never means zero or false.
All 50 checked claims and what they cover → · Corrections log →