Licensed discovery layer · Compute Atlas 1.33.0
Texas data center directory
Browse 112 licensed source rows in Texas. These discovery leads are not independently verified and are not a statewide census.
Texas map
Reported locations in Texas
112 licensed rows · 78 source localities · 6 map targets
Browse 6 mapped areas as links
- Dallas area34 source localities · 63 licensed rowsAbilene, Allen, Austin, AWS Project Spectrum (Somervell/Hood County), Big Digital Energy–10NetZero Hood County AI Data Center Campus, BlockchAIn Collin County AI GPU Hosting Site, Brady, CyrusOne Bosque County Campus (Thad Hill Energy Center), Dallas, Denton, Fairfield, Fort Spunky, Fort Worth, Garland, Grand Prairie, Hubbard, Irving, Lancaster, Mansfield, McGregor, Paris, Plano, Project Aquila, Prometheus Hyperscale Kaufman County Campus, Quinlan, Red Oak, Richardson, San Antonio, Talty, Temple, Tolar, Uhland, Waco, Westlake
- Abernathy area14 source localities · 18 licensed rowsAbernathy, Afton, Amarillo, Childress, Claude, Colorado City, Haskell, Pampa, Silverton, Snyder, Sweetwater, Turkey, Vantage Frontier Campus, Vernon
- Pecos area10 source localities · 11 licensed rowsAmazon Pecos County Data Center Campus, Andrews, BlockchAIn Reeves County AI GPU Hosting Site, GW Ranch, Pecos, Poolside Project Horizon AI Campus, San Angelo, San Angelo (Tankersley area, unincorporated), Texas Critical Data Centers (TCDC), Wink
- Boling area15 source localities · 15 licensed rowsBoling, Bryan, Castroville, Cedar Creek, CleanSpark Austin County AI Data Center Campus, CleanSpark Brazoria County (Second Texas) Campus, Cotulla, Huntsville, Katy, Lufkin, Round Rock, San Marcos, Site MAT 1177, Stargate Milam County Campus, Victoria
- El Paso1 licensed row · exact
- Laredo area4 source localities · 4 licensed rowsLaredo, Raymondville, Rio Hondo, Robstown
Map sources and method
The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record.
Two layers, two jobs. These licensed rows have not been independently verified by DataCenterData and are not a census. Reviewed evidence remains separate.
Browse by city
61 reported localities
City labels are reproduced as published. They are not inferred metro areas.
Showing 1–50 of 112 Texas licensed source rows.
-
source-reported under constructionPlanned 540 MWSource updated 6 July 2026exact locationView facility →
dcd-dir-000049 -
source-reported operationalOperational 60 MWSource updated 1 September 2026exact locationView facility →
dcd-dir-000036 -
source-reported operationalCapacity not statedSource updated 1 September 2026exact locationView facility →
dcd-dir-000037 -
source-reported proposedCapacity not statedSource updated 25 August 2026approximate locationView facility →
dcd-dir-000065 -
source-reported under constructionPlanned 384 MWSource updated 16 August 2026exact locationView facility →
dcd-dir-000526 -
AWS Project Eagle (Wharton County)
Eaglewood Road · Boling · Wharton County · Texas
source-reported proposedCapacity not statedSource updated 25 August 2026approximate locationView facility →dcd-dir-000157 -
source-reported proposedCapacity not statedSource updated 25 August 2026approximate locationView facility →
dcd-dir-000158 -
Big Digital Energy–10NetZero Hood County AI Data Center Campus
Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)
source-reported proposedPlanned 311 MWOperational 17 MWSource updated 8 September 2026approximate locationView facility →dcd-dir-000187 -
source-reported under constructionCapacity not statedSource updated 25 August 2026approximate locationView facility →
dcd-dir-000194 -
source-reported proposedCapacity not statedSource updated 25 August 2026approximate locationView facility →
dcd-dir-000195 -
source-reported under constructionPlanned 300 MWSource updated 26 July 2026exact locationView facility →
dcd-dir-000239 -
source-reported under constructionPlanned 300 MWSource updated 25 July 2026exact locationView facility →
dcd-dir-000240 -
source-reported proposedPlanned 1,000 MWSource updated 25 July 2026approximate locationView facility →
dcd-dir-000241 -
source-reported proposedPlanned 500 MWSource updated 16 August 2026approximate locationView facility →
dcd-dir-000244 -
source-reported proposedCapacity not statedSource updated 17 July 2026approximate locationView facility →
dcd-dir-000245 -
source-reported proposedCapacity not statedSource updated 26 July 2026approximate locationView facility →
dcd-dir-000246 -
source-reported proposedPlanned 70 MWSource updated 17 July 2026approximate locationView facility →
dcd-dir-000247 -
source-reported under constructionPlanned 100 MWSource updated 25 July 2026approximate locationView facility →
dcd-dir-000248 -
source-reported proposedPlanned 285 MWSource updated 25 August 2026approximate locationView facility →
dcd-dir-000251 -
source-reported proposedPlanned 300 MWSource updated 2 August 2026approximate locationView facility →
dcd-dir-000252 -
source-reported under constructionPlanned 1,200 MWSource updated 26 August 2026exact locationView facility →
dcd-dir-000254 -
source-reported proposedPlanned 2,000 MWSource updated 16 August 2026exact locationView facility →
dcd-dir-000299 -
source-reported operationalPlanned 200 MWOperational 16 MWSource updated 3 August 2026approximate locationView facility →
dcd-dir-000313 -
source-reported under constructionPlanned 260 MWSource updated 16 August 2026approximate locationView facility →
dcd-dir-000314 -
source-reported under constructionPlanned 1,500 MWSource updated 8 July 2026exact locationView facility →
dcd-dir-000316 -
Crow Holdings Stemmons Corridor Data Center Campus
Crow Holdings (developed and leased by CleanArc Data Centers)
Dallas · Dallas County · Texas
source-reported proposedPlanned 245 MWSource updated 26 August 2026approximate locationView facility →dcd-dir-000346 -
source-reported proposedPlanned 200 MWSource updated 26 August 2026approximate locationView facility →
dcd-dir-000349 -
source-reported proposedPlanned 1,500 MWSource updated 26 July 2026exact locationView facility →
dcd-dir-000348 -
source-reported under constructionPlanned 400 MWSource updated 26 August 2026approximate locationView facility →
dcd-dir-000359 -
source-reported operationalPlanned 50 MWSource updated 26 July 2026exact locationView facility →
dcd-dir-000365 -
CyrusOne Freestone Energy Center Campus
1366 FM488 · Fairfield · Freestone County · Texas · 75840
source-reported under constructionPlanned 760 MWSource updated 26 August 2026approximate locationView facility →dcd-dir-000367 -
CyrusOne SAT1 (San Antonio)
9999 Westover Hills Boulevard · San Antonio · Bexar County · Texas · 78251
source-reported operationalCapacity not statedSource updated 23 July 2026exact locationView facility →dcd-dir-000381 -
source-reported operationalCapacity not statedSource updated 24 July 2026exact locationView facility →
dcd-dir-000382 -
source-reported proposedPlanned 5,000 MWSource updated 10 September 2026approximate locationView facility →
dcd-dir-000390 -
source-reported operationalCapacity not statedSource updated 23 July 2026exact locationView facility →
dcd-dir-000462 -
source-reported operationalOperational 24 MWSource updated 26 August 2026approximate locationView facility →
dcd-dir-000553 -
Element Critical Austin One
8025 North Interstate Highway 35 Service Road · Austin · Travis County · Texas
source-reported operationalOperational 5 MWSource updated 23 July 2026exact locationView facility →dcd-dir-000557 -
source-reported under constructionPlanned 500 MWSource updated 8 September 2026approximate locationView facility →
dcd-dir-000568 -
source-reported operationalCapacity not statedSource updated 26 August 2026approximate locationView facility →
dcd-dir-000577 -
Equinix Dallas DA12 (West Dallas)
1550 W Mockingbird Lane · Dallas · Dallas County · Texas · 75235
source-reported proposedCapacity not statedSource updated 26 August 2026approximate locationView facility →dcd-dir-000578 -
Flexential Dallas - Downtown Dallas
1950 North Stemmons Freeway · Dallas · Dallas County · Texas · 75207
source-reported operationalCapacity not statedSource updated 23 July 2026approximate locationView facility →dcd-dir-000640 -
source-reported operationalOperational 13 MWSource updated 24 July 2026exact locationView facility →
dcd-dir-000641 -
Flexential Dallas - Richardson
3010 Waterview Parkway · Richardson · Dallas County · Texas · 75080
source-reported operationalCapacity not statedSource updated 23 July 2026exact locationView facility →dcd-dir-000642 -
source-reported proposedPlanned 108 MWSource updated 25 August 2026approximate locationView facility →
dcd-dir-000649 -
source-reported under constructionPlanned 168 MWSource updated 26 July 2026exact locationView facility →
dcd-dir-000677 -
source-reported proposedPlanned 100 MWSource updated 26 July 2026exact locationView facility →
dcd-dir-000682 -
source-reported under constructionPlanned 1,630 MWSource updated 9 July 2026exact locationView facility →
dcd-dir-000690 -
source-reported under constructionPlanned 933 MWSource updated 16 August 2026exact locationView facility →
dcd-dir-000705 -
source-reported under constructionCapacity not statedSource updated 7 July 2026exact locationView facility →
dcd-dir-000714 -
source-reported under constructionCapacity not statedSource updated 8 July 2026exact locationView facility →
dcd-dir-000723
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. DataCenterData normalized selected fields and added stable IDs. Download the attributed JSON →