Licensed discovery layer · Compute Atlas 1.34.1
Texas data centers
113 listings from a licensed directory. They are not independently verified and are not a statewide census.
Texas map
Reported locations in Texas
113 licensed rows · 80 source localities · 6 map targets
Browse 6 mapped areas as links
- Dallas-Fort Worth-Arlington, TX Metro Area64 licensed rows · 35 source locality labelsAbilene, Allen, Austin, AWS Project Spectrum (Somervell/Hood County), Big Digital Energy–10NetZero Hood County AI Data Center Campus, BlockchAIn Collin County AI GPU Hosting Site, Brady, CyrusOne Bosque County Campus (Thad Hill Energy Center), Dallas, Denton, Fairfield, Fort Spunky, Fort Worth, Garland, Grand Prairie, Hubbard, Irving, Lancaster, Mansfield, McGregor, Midlothian, Paris, Plano, Project Aquila, Prometheus Hyperscale Kaufman County Campus, Quinlan, Red Oak, Richardson, San Antonio, Talty, Temple, Tolar, Uhland, Waco, Westlake
- Abernathy area17 licensed rows · 14 source locality labelsAbernathy, Afton, Amarillo, Childress, Claude, Colorado City, Haskell, Pampa, Silverton, Snyder, Sweetwater, Turkey, Vantage Frontier Campus, Vernon
- Pecos area11 licensed rows · 10 source locality labelsAmazon Pecos County Data Center Campus, Andrews, BlockchAIn Reeves County AI GPU Hosting Site, GW Ranch, Pecos, Poolside Project Horizon AI Campus, San Angelo, San Angelo (Tankersley area, unincorporated), Texas Critical Data Centers (TCDC), Wink
- Boling area16 licensed rows · 16 source locality labelsBoling, Bryan, Castroville, Cedar Creek, CleanSpark Austin County AI Data Center Campus, CleanSpark Brazoria County (Second Texas) Campus, Cotulla, Huntsville, Katy, Lufkin, Martindale, Round Rock, San Marcos, Site MAT 1177, Stargate Milam County Campus, Victoria
- El Paso1 licensed row · approximate
- Laredo area4 licensed rows · 4 source locality labelsLaredo, Raymondville, Rio Hondo, Robstown
Map sources and method
The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Two layers, two jobs. These licensed rows have not been independently verified by DataCenterData and are not a census. Reviewed evidence remains separate.
Separate layer
Also listed by operators
Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.
113 operator-listed sites (mixed units; not added to licensed rows) in Texas →
Separate layer
Listed in the federal EPA registry
Street addresses where the U.S. EPA facility registry lists a registration whose name says data center or whose registrant is a known operator under industry code 518210, and that are not rows in the licensed directory or operator-listed sites. Each is one or more registry records, not a building count, and is never added to the counts above.
Separate layer
State and local registry records
Government records that name a data-center project or facility and are not already a licensed row, operator-listed site, federal registry address, or reviewed record. A permit or application is not an operating data center. These records are never added to the counts above.
12 state and local registry records (not added to licensed rows) in Texas →
Browse by city
63 reported localities
City labels are reproduced as published. They are not inferred metro areas.
Showing 1–50 of 113 Texas licensed source rows.
-
source-reported under constructionReported planned 540 MWSource updated 6 July 2026approximate location
-
source-reported operationalReported operational 60 MWSource updated 1 September 2026exact location (provider label)
-
source-reported operationalCapacity not statedSource updated 1 September 2026exact location (provider label)
-
source-reported proposedCapacity not statedSource updated 25 August 2026approximate location
-
source-reported under constructionReported planned 384 MWSource updated 16 August 2026exact location (provider label)
-
AWS Project Eagle (Wharton County)
Eaglewood Road · Boling · Wharton County · Texas
source-reported proposedCapacity not statedSource updated 25 August 2026approximate location -
source-reported proposedCapacity not statedSource updated 25 August 2026approximate location
-
Big Digital Energy–10NetZero Hood County AI Data Center Campus
Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)
source-reported proposedCapacity not established; source review excludes the published figureSource updated 8 September 2026approximate location -
source-reported under constructionCapacity not statedSource updated 25 August 2026approximate location
-
source-reported proposedCapacity not statedSource updated 25 August 2026approximate location
-
source-reported under constructionReported planned 300 MWSource updated 26 July 2026approximate location
-
source-reported under constructionReported planned 300 MWSource updated 25 July 2026approximate location
-
source-reported proposedReported planned 1,000 MWSource updated 21 September 2026approximate location
-
source-reported proposedReported planned 500 MWSource updated 16 August 2026approximate location
-
source-reported proposedCapacity not statedSource updated 17 July 2026approximate location
-
source-reported proposedCapacity not statedSource updated 26 July 2026approximate location
-
source-reported proposedReported planned 70 MWSource updated 17 July 2026approximate location
-
source-reported under constructionReported planned 100 MWSource updated 25 July 2026approximate location
-
source-reported proposedReported planned 285 MWSource updated 25 August 2026approximate location
-
source-reported proposedReported planned 300 MWSource updated 2 August 2026approximate location
-
CloudBurst San Marcos GigaCenter
2955 Francis Harris Lane · San Marcos · Hays County · Texas
source-reported under constructionReported planned 1,200 MWSource updated 14 October 2026approximate location -
source-reported proposedReported planned 2,000 MWSource updated 16 August 2026approximate location
-
source-reported operationalReported planned 200 MWReported operational 16 MWSource updated 21 September 2026approximate location
-
source-reported under constructionReported planned 260 MWSource updated 16 August 2026approximate location
-
source-reported under constructionReported planned 1,500 MWSource updated 8 July 2026approximate location
-
Crow Holdings Stemmons Corridor Data Center Campus
Crow Holdings (developed and leased by CleanArc Data Centers)
Dallas · Dallas County · Texas
source-reported proposedReported planned 245 MWSource updated 26 August 2026approximate location -
source-reported proposedReported planned 200 MWSource updated 14 October 2026approximate location
-
source-reported proposedReported planned 1,500 MWSource updated 26 July 2026approximate location
-
source-reported under constructionReported planned 400 MWSource updated 26 August 2026approximate location
-
source-reported operationalCapacity not established; source review excludes the published figureSource updated 21 September 2026exact location (provider label)
-
CyrusOne Freestone Energy Center Campus
1366 FM488 · Fairfield · Freestone County · Texas · 75840
source-reported under constructionReported planned 760 MWSource updated 26 August 2026approximate location -
CyrusOne SAT1 (San Antonio)
9999 Westover Hills Boulevard · San Antonio · Bexar County · Texas · 78251
source-reported operationalCapacity not statedSource updated 23 July 2026exact location (provider label) -
source-reported operationalCapacity not established; source review excludes the published figureSource updated 21 September 2026exact location (provider label)View lead →
dcd-dir-000382 -
source-reported proposedReported planned 5,000 MWSource updated 10 September 2026approximate location
-
source-reported operationalCapacity not statedSource updated 23 July 2026exact location (provider label)
-
source-reported operationalReported operational 24 MWSource updated 26 August 2026approximate location
-
source-reported under constructionCapacity not statedSource updated 14 October 2026approximate location
-
Element Critical Austin One
8025 North Interstate Highway 35 Service Road · Austin · Travis County · Texas
source-reported operationalReported operational 5 MWSource updated 21 September 2026exact location (provider label) -
source-reported under constructionReported planned 500 MWSource updated 8 September 2026approximate location
-
source-reported operationalCapacity not statedSource updated 26 August 2026approximate location
-
Equinix Dallas DA12 (West Dallas)
1550 W Mockingbird Lane · Dallas · Dallas County · Texas · 75235
source-reported proposedCapacity not statedSource updated 26 August 2026approximate location -
Flexential Dallas - Downtown Dallas
1950 North Stemmons Freeway · Dallas · Dallas County · Texas · 75207
source-reported operationalCapacity not established; source review excludes the published figureSource updated 21 September 2026approximate location -
source-reported operationalReported operational 13 MWSource updated 21 September 2026exact location (provider label)
-
Flexential Dallas - Richardson
3010 Waterview Parkway · Richardson · Dallas County · Texas · 75080
source-reported operationalCapacity not statedSource updated 23 July 2026exact location (provider label) -
source-reported proposedReported planned 108 MWSource updated 21 September 2026approximate location
-
source-reported under constructionReported planned 168 MWSource updated 26 July 2026approximate location
-
source-reported proposedReported planned 100 MWSource updated 26 July 2026approximate location
-
source-reported operationalCapacity not established; source review excludes the published figureSource updated 27 September 2026approximate location
-
source-reported under constructionReported planned 933 MWSource updated 16 August 2026approximate location
-
source-reported under constructionCapacity not statedSource updated 7 July 2026approximate location
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. DataCenterData normalized selected fields and added stable IDs. Download the attributed JSON → Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).