Edged Energy Martindale Campus

source-reported under construction

Edged Energy

Martindale · Caldwell County · Texas

Capacity not statedSource updated 14 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Edged Energy Martindale Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Edged Energy
Address and locality
Martindale · Caldwell County · Texas
Official metro area
Austin-Round Rock-San Marcos, TX
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
14 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001838

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Announced investment
$2.8 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Power source: The on-site-gas classification is absent from row notes and source labels.
  • Provider energy note: The fuel-generation and grid-delay details are absent from row notes and source labels.
  • Cooling: The cooling classification is absent from row notes and source labels.
  • Provider water note: The ThermalWorks waterless-cooling detail is absent from row notes and source labels.
  • Land area: The 330-acre figure is absent from row notes and source labels.

What the source record says

investmentUsd ($2.8B) is the initial phase only. The county approved a tax abatement and reinvestment zone, but the amount is not stated. Coordinates are as listed by Baxtel. MW is undisclosed (an aggregator's 462 MW figure was not corroborated).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-10-14 · source-reported under construction

    Martindale 1 (869,685 sq ft) is under construction with completion slated for mid-2028. Martindale 2 is planned, and the campus is projected to exceed 2 million sq ft.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID edged-martindale-campus-caldwell-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001838

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Martindale, TX · Caldwell (Approximate location)

Roles

  • Operator: Edged Energy

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-10-14 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $2.8 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →