This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Google Haskell County Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Address and locality
- Haskell · Haskell County · Texas
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 7 July 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000714
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power supply description
- solar
- Power source
- Solar
- Community response
- Provider label: mixed
- AI-use label (provider)
- confirmed
- Announced
- 14 November 2025
Provider notes
Energy. Dedicated supply is the co-located Quantum Clean Energy Project (Intersect Power / Google subsidiary): 640 MW solar PV + 1.3 GWh BESS, operational target June 2026. Haskell County selected partly for wind and solar availability.
Community. Stamford Mayor James Decker called the buildout 'jarring' and voiced concern about the town being chewed up by the data-center boom; Haskell Mayor Christina Isbell anticipates long-term economic benefit for the ~3,000-resident town. County tax base expected to more than double. Google committed to fund training for 1,700+ TX electrical apprentices by 2030.
What the source record says
Two data center buildings at one Haskell County site; treated as a single campus record. Announced Nov 14 2025 as part of Google's $40B Texas investment through 2027 (which also covers Armstrong County and a Wilbarger County/Vernon site); no Haskell-specific investment figure disclosed, so investmentUsd is omitted (the $40B is a Texas-wide aggregate). Data-center IT capacity in MW not publicly disclosed. One building is co-located with the Quantum Clean Energy Project (Intersect Power, acquired by Google March 2026): 640 MW solar PV + 1.3 GWh battery storage, scheduled operational June 2026 - this is energy-project capacity, NOT data-center IT load. Job figures cited in press (1,200 construction / up to 11 permanent) come from the co-located Intersect energy project, not the data center, so they are noted here rather than in jobs. Coordinates are the Haskell city centroid (no parcel-level GPS found).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11-14 · source-reported proposed
Google and Governor Abbott jointly announced a $40B Texas AI-infrastructure investment including two data center buildings at the Haskell County campus
- 2025-11 · source-reported under construction
Ground broken; Google began engaging subcontractors for active construction
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Google data centers totaling $40 billion coming to Texas · Texas Tribune
- Governor Abbott, Google Announce $40 Billion Investment In Texas · Office of the Texas Governor
- Google's investment in Haskell and West Central Texas · Google
- Quantum Clean Energy Project - Haskell County TX · Intersect Power
- Google's $40 billion data center investment to transform Texas town · KTXS ABC Abilene
- Data centers bring major investment, growth potential to Haskell County · KAUZ News Channel 6
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-haskell-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000714
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Haskell, TX (Approximate location)
Roles
- Operator: Google
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 14 November 2025
Provider-reported announcement date.
- Status history: 2025-11-14 · source-reported proposed
Status history supplied by the source.
- Status history: 2025-11 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power supply description: solar
Provider’s own description of the power supply; no separate utility field was supplied.
- Power source: Solar
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-07
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.