This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for CleanSpark Austin County AI Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- CleanSpark, Inc.
- Address and locality
- Austin County · Texas
- Official metro area
- Houston-Pasadena-The Woodlands, TX
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 285 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 25 August 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000251
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- Land area
- 271 acres (source-reported; parcel boundary not established)
- AI-use label (provider)
- confirmed
- Announced
- 29 October 2025
What the source record says
First of CleanSpark's two announced Greater Houston-area sites (see also the separate Brazoria County campus). No city/address disclosed anywhere in the filing — company language is only 'positioned between Houston and Austin'; Austin County (seat Bellville) fits that framing, so coordinates are an approximate county reference point, not a parcel. Targeting energization of >200 MW in H1 2027. Explicitly framed by named CleanSpark executives (CBO, SVP of AI Data Centers) as an AI/HPC campus, not continued bitcoin mining or generic cloud — clears the schema's evidence bar for aiClassification. Combined with the separate Brazoria County campus, CleanSpark cites 'more than 890 MW of aggregate potential utility capacity' in the greater Houston area.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-10-29 · source-reported proposed
CleanSpark executed 285 MW of long-term power supply agreements (a 28% increase to contracted power) for a ~271-acre AI/HPC data center campus in Austin County; substation construction underway, site design/vertical construction not yet started.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- CleanSpark, Inc. Form 8-K, filed 2025-10-29 (Item 8.01) · SEC EDGAR
- CleanSpark Exhibit 99.1 press release: AI Data Center in Greater Houston · CleanSpark, Inc.
- CleanSpark Enters Texas Market with Land and Large-Scale Power Acquisition to Rapidly Deploy an AI Data Center in Greater Houston · PR Newswire
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cleanspark-austin-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000251
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- TX · Austin (Approximate location)
Roles
- Operator: CleanSpark, Inc.
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 29 October 2025
Provider-reported announcement date.
- Status history: 2025-10-29 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 271 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 285 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-25
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.