This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Comanche Circle.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Sailfish Digital Ventures (SDV)
- Address and locality
- Tolar · Hood County · Texas
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 2,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 16 August 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000299
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- Land area
- 2,600 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: contested
- AI-use label (provider)
- likely
Provider notes
Energy. Sailfish Investors' Comanche Circle (2,100-2,600 acre, up to 5GW planned across nine campuses) originally planned a mixed gas + grid supply, anchored by a proposed 2GW on-site gas plant ('Tolar Power Center') developed by NRG that would have supplied the campus.
Community. Local opposition (Protect the Paluxy Valley group, aquifer/water concerns); a Feb 2026 county moratorium vote failed 3-2.
What the source record says
Near Vistra's Comanche Peak Nuclear Plant. Developer states a 5GW total pipeline across 9 campuses; a later, scaled-back figure puts Comanche Circle plus two smaller Sailfish projects combined at 'up to 3 gigawatts' - given conflicting figures, no single capacityMw is recorded here. Conditional county approval Jan 2026; construction targeted late 2026. No hyperscaler tenant confirmed - speculative developer-led land assembly. Coordinates are approximate.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Sailfish plans multi-gigawatt data center park outside DFW, Texas · Data Center Dynamics
- Hood County rejects data center development pause · Texas Tribune
- KERA News: NRG withdraws permit for proposed Tolar gas plant amid community opposition (confirms June 18 2026 withdrawal, campus power plan now undefined)
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID comanche-circle-sailfish-hood-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000299
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Tolar, TX · Hood (Approximate location)
Roles
- Operator: Sailfish Digital Ventures (SDV)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
Area, acreage and buildings
- Land area: 2,600 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 2,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-16
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.