This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Cipher Colchis Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Cipher Digital
- Address and locality
- San Angelo · Tom Green County · Texas
- Official metro area
- San Angelo, TX
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 21 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000241
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- Land area
- 620 acres (source-reported; parcel boundary not established)
- Community response
- Not established
- Announced
- November 2025
Provider notes
Energy. Fully executed 1-GW Direct Connect Agreement with American Electric Power (AEP) for a dual interconnection facility at the AEP Red Creek 345-kV substation; targeted energization 2028; advanced ERCOT studies per Cipher's Q3 2025 update.
Community. Local coverage (San Angelo LIVE, Jun 2026) notes the Colchis site sits outside San Angelo city limits in unincorporated Tom Green County, roughly 2,500 ft east of the Skybox campus, raising questions about who can regulate it. No formal opposition, council vote, litigation, or moratorium located.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
1-GW HPC/AI development site in Tom Green County, northeast of San Angelo near AEP's Red Creek 345-kV substation (~2,500 ft east of the Skybox San Angelo campus). In November 2025 Cipher purchased a majority interest in a JV (Colchis LLC) to develop the site, with options to buy ~620 acres of land adjacent to the existing substation; Cipher expects ~95% equity subject to final lease/development terms. Coordinates are the NE-San-Angelo / Red Creek substation area centroid (approximate) pending a parcel-level GIS lookup. Investment and jobs figures undisclosed -> omitted. County pinned via local press (San Angelo LIVE); the SEC 10-K discloses only "West Texas.". Cipher Mining was renamed Cipher Digital.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11 · source-reported proposed
Cipher purchased a majority interest in a JV (Colchis LLC) to develop the 1-GW Colchis HPC site in West Texas; fully executed 1-GW AEP Direct Connect agreement, energization targeted 2028.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Cipher Digital Inc. FY2025 Form 10-K — Item 1 Site Pipeline, Colchis Site (1-GW West Texas, 620 acres, AEP Direct Connect, energize 2028) · SEC EDGAR
- Cipher Mining Provides Third Quarter 2025 Business Update — formation of JV to develop 1-GW Colchis site in West Texas · Cipher Mining Inc.
- San Angelo May End Up With a Data Center It Can't Regulate — Cipher Digital Colchis in Tom Green County, near AEP Red Creek substation · San Angelo LIVE
- Cipher Mining Provides Third Quarter 2025 Business Update (GlobeNewswire, Nov 3, 2025)
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cipher-colchis-tom-green-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000241
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- San Angelo, TX · Tom Green (Approximate location)
Roles
- Operator: Cipher Digital
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: November 2025
Provider-reported announcement date.
- Status history: 2025-11 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 620 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Not established
Provider label: unknown.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.