Cipher Colchis Campus

source-reported proposed

Cipher Digital

San Angelo · Tom Green County · Texas

Reported planned 1,000 MWSource updated 21 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Cipher Colchis Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Cipher Digital
Address and locality
San Angelo · Tom Green County · Texas
Official metro area
San Angelo, TX
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000241

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
GridProvider label.
Land area
620 acres (source-reported; parcel boundary not established)
Community response
Not establishedProvider label: unknown.
Announced
November 2025Provider-reported announcement date.

Provider notes

Energy. Fully executed 1-GW Direct Connect Agreement with American Electric Power (AEP) for a dual interconnection facility at the AEP Red Creek 345-kV substation; targeted energization 2028; advanced ERCOT studies per Cipher's Q3 2025 update.

Community. Local coverage (San Angelo LIVE, Jun 2026) notes the Colchis site sits outside San Angelo city limits in unincorporated Tom Green County, roughly 2,500 ft east of the Skybox campus, raising questions about who can regulate it. No formal opposition, council vote, litigation, or moratorium located.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.

What the source record says

1-GW HPC/AI development site in Tom Green County, northeast of San Angelo near AEP's Red Creek 345-kV substation (~2,500 ft east of the Skybox San Angelo campus). In November 2025 Cipher purchased a majority interest in a JV (Colchis LLC) to develop the site, with options to buy ~620 acres of land adjacent to the existing substation; Cipher expects ~95% equity subject to final lease/development terms. Coordinates are the NE-San-Angelo / Red Creek substation area centroid (approximate) pending a parcel-level GIS lookup. Investment and jobs figures undisclosed -> omitted. County pinned via local press (San Angelo LIVE); the SEC 10-K discloses only "West Texas.". Cipher Mining was renamed Cipher Digital.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · source-reported proposed

    Cipher purchased a majority interest in a JV (Colchis LLC) to develop the 1-GW Colchis HPC site in West Texas; fully executed 1-GW AEP Direct Connect agreement, energization targeted 2028.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cipher-colchis-tom-green-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000241

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • San Angelo, TX · Tom Green (Approximate location)

Roles

  • Operator: Cipher Digital

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: November 2025

    Provider-reported announcement date.

  • Status history: 2025-11 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 620 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Not established

    Provider label: unknown.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →