This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for AWS Project Eagle (Wharton County).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Facility snapshot
- Operator as published
- Amazon Data Services, Inc.
- Address and locality
- Eaglewood Road · Boling · Wharton County · Texas
- Source-reported status
- proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 25 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000157
What the source record says
Project Eagle: four identical 189,060 sq ft buildings ($300M each) at 240/244/258 Eaglewood Road near FM 1301/FM 442; construction planned to start Aug 1 2026, staggered completion Jan-Aug 2027.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- AWS Files $1.2 Billion Permit for Data Center in Texas · US Data Center Projects
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aws-project-eagle-boling-wharton-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.