Licensed lead · not independently verified · dcd-dir-000240

Cipher Black Pearl Campus

source-reported under construction

Cipher Digital

Wink · Winkler County · Texas

Reported planned 300 MWSource updated 25 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Cipher Black Pearl Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Cipher Digital
Address and locality
Wink · Winkler County · Texas
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
25 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000240

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
OncorUtility as named by the provider.
Power source
GridProvider label.
Community response
Not establishedProvider label: unknown.
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
November 2025Provider-reported announcement date.

Provider notes

Energy. 138-kV Oncor interconnection (ERCOT West); a preliminary PPA with ENGIE (up to 300 MW of wind) was announced May 2025 - grid-sourced renewable via PPA, not on-site generation.

Community. No documented local reception found (Wink is a small West-Texas oil-field community; coverage is exclusively financial/industry press). No council votes, opposition, litigation, or moratorium located.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Announced investment: The source note says the $2 billion figure is note financing inferred across two instruments and was meant to be omitted as an investment value.

What the source record says

~300 gross MW HPC/AI campus near Wink, Winkler County, under a 15-year AWS lease; Phase I targeted Q4 2026. Cipher transitioning crypto → HPC/AI. Coordinates are the Wink area centroid. Cipher Mining (Nasdaq: CIFR) financed Black Pearl via ~$2.0B senior secured notes (Black Pearl Compute LLC, Feb 2026) plus a ~$232.5M equity reimbursement (~$2.23B implied total, inferred across two instruments) -> investmentUsd omitted; the ~$9.3-9.8B AWS figure is 15-year lease revenue, not capex. No jobs figures disclosed -> jobs honest-zero. Mining-era cooling was ~250 MW air-cooled + ~50 MW liquid-cooled; the HPC/AI cooling architecture is undisclosed -> water honest-zero. No confirmed public subsidy surfaced. Cipher Mining was renamed Cipher Digital.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · source-reported under construction

    Cipher Mining signed a 15-year AWS lease to deliver ~300 gross MW at its Black Pearl campus near Wink; Phase I targeted Q4 2026

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cipher-black-pearl-wink-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000240

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Wink, TX · Winkler (Approximate location)

Roles

  • Operator: Cipher Digital

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: November 2025

    Provider-reported announcement date.

  • Status history: 2026 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Oncor

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Not established

    Provider label: unknown.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-25

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →