This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Crusoe Victoria AI Factory.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Crusoe
- Address and locality
- Victoria · Victoria County · Texas
- Official metro area
- Victoria, TX
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 26 July 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000348
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power supply description
- On-site generation (Blue Energy: gas bridge → nuclear)
- Power source
- On-site gas
- Community response
- Provider label: contested
- AI-use label (provider)
- confirmed
- Announced
- October 2025
Provider notes
Energy. Blue Energy on-site generation: natural-gas bridge (~2028) transitioning to nuclear (~2031).
Community. Victoria County Commissioners Court heard organized opposition at a public hearing on the Crusoe/Blue Energy project (wastewater/injection-well concerns) alongside a rally by 'Concerned Citizens for Responsible Development' opposing AI data centers in the area (June-July 2026); no vote reported yet.
What the source record says
Crusoe-developed AI factory campus at the Port of Victoria, powered by Blue Energy (natural-gas bridge as early as 2028, nuclear targeted ~2031). Distinct from Crusoe's Stargate Abilene campus. ~1.5 GW planned. Coordinates are the Victoria area centroid.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-10 · source-reported proposed
Blue Energy and Crusoe announced a nuclear-powered AI factory campus at the Port of Victoria; gas bridge power ~2028, nuclear ~2031
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Blue Energy and Crusoe partner to develop nuclear-powered AI data center · Crusoe
- Crossroads Today — Data centers spark debate in Victoria County Commissioners Court
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID crusoe-blue-energy-victoria-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000348
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Victoria, TX (Approximate location)
Roles
- Operator: Crusoe
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: October 2025
Provider-reported announcement date.
- Status history: 2025-10 · source-reported proposed
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power supply description: On-site generation (Blue Energy: gas bridge → nuclear)
Provider’s own description of the power supply; no separate utility field was supplied.
- Power source: On-site gas
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-26
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.