Exact operator label · licensed discovery layer
Edged Energy data centers: 5 listings with status and map
5 listings from a licensed directory under the exact operator label “Edged Energy”, with location and stated status. Names are not merged into parent companies or ownership groups.
Discovery boundary: operator names are exact published strings and are not resolved corporate identities. Rows have not been independently verified by DataCenterData.
Reported geography
5 reported Edged Energy facility points.
Points belong only to rows carrying the exact published operator label “Edged Energy”. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Showing 1–5 of 5 rows.
-
source-reported under constructionReported planned 13.2 MWSource updated 16 September 2026approximate location
-
Edged Council Bluffs Data Center Campus (Project Lola)
2801 College Road · Council Bluffs · Pottawattamie County · Iowa · 51503
source-reported under constructionCapacity not statedSource updated 4 September 2026approximate location -
source-reported operationalReported operational 24 MWSource updated 26 August 2026approximate location
-
source-reported under constructionCapacity not statedSource updated 14 October 2026approximate location
-
Edged Salt Lake City Data Center (Project Inabi)
600 W 14600 S · Bluffdale · Salt Lake County · Utah
source-reported under constructionCapacity not statedSource updated 13 October 2026approximate location
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).