Licensed lead · not independently verified · dcd-dir-000346

Crow Holdings Stemmons Corridor Data Center Campus

source-reported proposed

Crow Holdings (developed and leased by CleanArc Data Centers)

Dallas · Dallas County · Texas

Reported planned 245 MWSource updated 26 August 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Crow Holdings Stemmons Corridor Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Crow Holdings (developed and leased by CleanArc Data Centers)
Address and locality
Dallas · Dallas County · Texas
Official metro area
Dallas-Fort Worth-Arlington, TX
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 245 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
26 August 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000346

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
40 acres (source-reported; parcel boundary not established)
Announced
20 January 2026Provider-reported announcement date.

Provider notes

Energy. Planned dedicated on-site substation sized to support the full 245 MW campus; long-lead equipment procurement and substation planning reported in process.

What the source record says

Roughly 40 acres along the Stemmons Corridor that Crow Holdings has owned for decades, currently vacant. First building is 70 MW with delivery targeted for late 2027. The exact parcel address is not disclosed in the announcement, so coordinates are a Dallas city-level geocode rather than a parcel point.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01-20 · source-reported proposed

    Crow Holdings announced the 245 MW campus; CleanArc named as development and leasing lead in February 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID crow-holdings-cleanarc-stemmons-dallas-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000346

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Dallas, TX (Approximate location)

Roles

  • Operator: Crow Holdings (developed and leased by CleanArc Data Centers)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 20 January 2026

    Provider-reported announcement date.

  • Status history: 2026-01-20 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 40 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 245 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-26

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →