This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Crow Holdings Stemmons Corridor Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Crow Holdings (developed and leased by CleanArc Data Centers)
- Address and locality
- Dallas · Dallas County · Texas
- Official metro area
- Dallas-Fort Worth-Arlington, TX
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 245 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 26 August 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000346
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 40 acres (source-reported; parcel boundary not established)
- Announced
- 20 January 2026
Provider notes
Energy. Planned dedicated on-site substation sized to support the full 245 MW campus; long-lead equipment procurement and substation planning reported in process.
What the source record says
Roughly 40 acres along the Stemmons Corridor that Crow Holdings has owned for decades, currently vacant. First building is 70 MW with delivery targeted for late 2027. The exact parcel address is not disclosed in the announcement, so coordinates are a Dallas city-level geocode rather than a parcel point.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-01-20 · source-reported proposed
Crow Holdings announced the 245 MW campus; CleanArc named as development and leasing lead in February 2026.
Sources and attribution
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID crow-holdings-cleanarc-stemmons-dallas-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000346
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Dallas, TX (Approximate location)
Roles
- Operator: Crow Holdings (developed and leased by CleanArc Data Centers)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 20 January 2026
Provider-reported announcement date.
- Status history: 2026-01-20 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 40 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 245 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-26
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.