This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Core Scientific Pecos AI Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Core Scientific
- Address and locality
- Pecos · Reeves County · Texas
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 8 July 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000316
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- Community response
- Not established
- AI-use label (provider)
- confirmed
Provider notes
Energy. Served by the ERCOT grid; Texas-New Mexico Power (TNMP) is the regional distribution utility for Pecos but Core Scientific's filings do not name it. Core Scientific announced a 'scalable behind-the-meter' power solution on 200+ acres (April 2026) with generation type/MW undisclosed - distinct from Microsoft's separate Project Kirby and the Chevron/Energy Forge One gas plant in the same county.
Community. No community opposition or formal support vote was found specific to Core Scientific's Pecos campus; regional officials have publicly welcomed the adjacent Microsoft campus. Investor-level opposition to the CoreWeave acquisition (Two Seas Capital) is a corporate-finance matter, not community reception.
What the source record says
High-density AI/HPC colocation. ~1.5 GW gross / ~1.0 GW leasable is an expansion ceiling (in notes). Co-located in Reeves County with Microsoft's separate 'Project Kirby' Pecos campus (distinct operator/parcel; tracked separately). Address on record: 1939 FM 2119. Core Scientific historically a bitcoin miner, repositioned to HDC. Coordinates are the Pecos area centroid. No Pecos-specific capex is disclosed (Q4 FY2025 capex of $279.2M is company-wide; the $226.2M CoreWeave-funded portion is contract revenue, not capex) -> investmentUsd omitted. No Reeves County abatement attributable to Core Scientific was found (the 'Pecos Power Plant LLC' abatement is a separate gas-plant entity).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · source-reported under construction
Core Scientific announced expansion of its Pecos campus toward ~1.5 GW gross power; first data hall reached interior-footing milestone, first capacity expected early 2027
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Core Scientific plans expansion to 1.5 gigawatts of gross power at Pecos, Texas campus · Core Scientific Inc.
- Core Scientific announces Q4 FY2025 results · Core Scientific
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID core-scientific-pecos-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Cottonwood 1 & 2
- Address as published
- FM 2119, Pecos, TX 79772
Lifecycle status is not published for this listing.
Site area: 100 acres.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000316
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Pecos, TX · Reeves (Approximate location)
Roles
- Operator: Core Scientific
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Not established
Provider label: unknown.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-08
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.