Licensed lead · not independently verified · dcd-dir-000390

Data City, Texas

source-reported proposed

Energy Abundance Development Corporation

Laredo · Webb County · Texas

Reported planned 5,000 MWSource updated 10 September 2026approximate location · provider confidence label: rumored
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Data City, Texas.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Energy Abundance Development Corporation
Address and locality
Laredo · Webb County · Texas
Official metro area
Laredo, TX
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 5,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
10 September 2026
Location precision
approximate
Compute Atlas confidence label
rumored (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000390

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
MixedProvider label.
Land area
50,000 acres (source-reported; parcel boundary not established)
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Claimed 100% behind-the-meter: wind, solar, batteries, and dual-fuel gas turbines initially on Texas natural gas, later shifting toward green hydrogen; paired with a proposed 2 TWh 'Hydrogen City' salt-dome hydrogen storage concept.

What the source record says

Early-stage developer announcement (Mar 21 2025) for a 5 GW behind-the-meter data center hub on ~50,000 acres near Laredo (Webb County), targeting large AI workloads with direct-to-chip liquid cooling. Phase 1 stated as 300 MW / ~1M sq ft in 2026, scaling to 5 GW / 15M+ sq ft. Highly speculative: primary source is a single promotional press release; no permit, interconnection, or construction evidence located. Coordinate anchored on Laredo. Public-reception check (2026-09-10): Checked the operator's launch press release and one regional business-journal writeup (2026-09-10); both cover only the developer's technical vision (50,000-acre, off-grid/islanded from ERCOT) with no mention of a public hearing, Laredo city/county government reaction, or resident feedback. No community-reception record found in either source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID data-city-energy-abundance-laredo-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000390

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Laredo, TX · Webb (Approximate location)

Roles

  • Operator: Energy Abundance Development Corporation

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 50,000 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 5,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Mixed

    Provider label.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →