This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Core Scientific Denton Data Center (Denton 1).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Core Scientific
- Address and locality
- Denton · Denton County · Texas
- Official metro area
- Dallas-Fort Worth-Arlington, TX
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 260 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 16 August 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000314
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Announced investment
- $1.2 billion
- AI-use label (provider)
- confirmed
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-02-26 · source-reported under construction
Converted bitcoin-mining campus (8171 Jim Christal Rd) being rebuilt into a CoreWeave AI/HPC hub; renovation began Nov 2024, phased buildout continuing; full critical IT load reaches ~260MW after the Feb 2025 70MW expansion, with other coverage citing a 2027 full-site launch target.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site · Core Scientific IR (BusinessWire-syndicated)
- Core Scientific: Denton, TX Data Center · Baxtel
- Denton, TX Data Center | High-Density at Scale · Core Scientific (operator site)
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID core-scientific-denton-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Denton 1
- Address as published
- 8171 Jim Christal Rd, Denton, TX 76207
Lifecycle status is not published for this listing.
Core Scientific · Denton 1 — Additional operator-reported details
- Specifications and facility pages: Denton, TX Data Center | High-Density at Scale — https://corescientific.com/high-density-data-centers/denton-texas/
Company-reported. Not independently verified.
Open cited source →
Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000314
Licensed directory row.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Denton, TX (Approximate location)
Roles
- Operator: Core Scientific
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2025-02-26 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 260 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced investment: $1.2 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-16
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.