Licensed discovery layer · Compute Atlas 1.34.1

Georgia data centers

77 listings from a licensed directory. They are not independently verified and are not a statewide census.

77 licensed rows49 eligible organization labels44 city/state labelsLicensed edition dated 14 October 2026

Georgia map

Reported locations in Georgia

77 licensed rows · 44 source localities · 5 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 134 data-center source listings here across licensed, operator and DataCenterData layers (91 with a map point); 142 with government registry records. Source listings are not distinct sites.5 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 5 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Two layers, two jobs. These licensed rows have not been independently verified by DataCenterData and are not a census. Reviewed evidence remains separate.

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

37 operator-listed sites (mixed units; not added to licensed rows) in Georgia →

Separate layer

Listed in the federal EPA registry

Street addresses where the U.S. EPA facility registry lists a registration whose name says data center or whose registrant is a known operator under industry code 518210, and that are not rows in the licensed directory or operator-listed sites. Each is one or more registry records, not a building count, and is never added to the counts above.

6 addresses in the U.S. EPA facility registry (registry records, not buildings; not added to licensed rows) in Georgia →

Browse by city

44 reported localities

City labels are reproduced as published. They are not inferred metro areas.

Showing 1–50 of 77 Georgia licensed source rows.

  1. source-reported permittedReported planned 18 MWSource updated 10 September 2026approximate location
  2. source-reported proposedCapacity not statedSource updated 14 October 2026approximate location
  3. source-reported operationalCapacity not statedSource updated 28 August 2026approximate location
  4. source-reported cancelledCapacity not statedSource updated 30 September 2026approximate location
  5. source-reported permittedCapacity not statedSource updated 14 October 2026approximate location
  6. source-reported proposedCapacity not statedSource updated 28 August 2026approximate location
  7. source-reported proposedCapacity not statedSource updated 14 October 2026approximate location
  8. source-reported permittedCapacity not statedSource updated 10 September 2026approximate location
  9. source-reported cancelledCapacity not statedSource updated 14 October 2026approximate location
  10. Bridgeport Data Center Campus

    Undisclosed developer (Bridgeport Industrial Park)

    Moreland · Coweta County · Georgia

    source-reported proposedCapacity not statedSource updated 10 September 2026approximate location
  11. source-reported proposedCapacity not statedSource updated 12 September 2026approximate location
  12. source-reported permittedCapacity not statedSource updated 28 August 2026approximate location
  13. source-reported operationalCapacity not statedSource updated 23 July 2026approximate location
  14. CoreSite AT2 - Marietta Data Center

    CoreSite

    1130 Powers Ferry Place Southeast · Marietta · Cobb County · Georgia · 30067

    source-reported operationalCapacity not statedSource updated 23 July 2026exact location (provider label)
  15. source-reported under constructionCapacity not statedSource updated 21 September 2026exact location (provider label)
    View lead →dcd-dir-000336
  16. source-reported operationalCapacity not statedSource updated 14 October 2026approximate location
  17. source-reported proposedReported planned 200 MWSource updated 10 September 2026approximate location
  18. source-reported under constructionReported planned 216 MWSource updated 7 July 2026approximate location
  19. source-reported under constructionReported planned 120 MWSource updated 6 July 2026approximate location
  20. source-reported operationalCapacity not statedSource updated 23 July 2026exact location (provider label)
  21. source-reported operationalCapacity not statedSource updated 23 July 2026approximate location
  22. source-reported proposedReported planned 212 MWSource updated 14 October 2026approximate location
  23. source-reported operationalReported planned 20 MWSource updated 14 October 2026approximate location
  24. source-reported operationalReported planned 168 MWReported operational 27 MWSource updated 28 August 2026approximate location
  25. source-reported under constructionCapacity not statedSource updated 14 October 2026approximate location
  26. source-reported operationalCapacity not established; source review excludes the published figureSource updated 21 September 2026exact location (provider label)
  27. source-reported operationalReported operational 22.5 MWSource updated 21 September 2026exact location (provider label)
    View lead →dcd-dir-000633
  28. source-reported operationalCapacity not statedSource updated 23 July 2026exact location (provider label)
  29. source-reported operationalCapacity not statedSource updated 23 July 2026exact location (provider label)
  30. source-reported operationalCapacity not statedSource updated 8 August 2026approximate location
  31. source-reported proposedCapacity not statedSource updated 8 August 2026approximate location
  32. source-reported under constructionCapacity not established; source review excludes the published figureSource updated 14 October 2026approximate location
  33. source-reported proposedCapacity not statedSource updated 14 October 2026approximate location
  34. source-reported permittedCapacity not statedSource updated 23 September 2026approximate location
  35. source-reported proposedReported planned 150 MWSource updated 14 October 2026approximate location
  36. source-reported cancelledCapacity not statedSource updated 10 September 2026approximate location
  37. source-reported cancelledReported planned 1,250 MWSource updated 10 September 2026approximate location
  38. source-reported operationalCapacity not statedSource updated 28 August 2026approximate location
  39. source-reported proposedCapacity not statedSource updated 14 October 2026approximate location
  40. source-reported permittedCapacity not statedSource updated 25 July 2026approximate location
  41. source-reported under constructionCapacity not statedSource updated 6 July 2026approximate location
  42. source-reported operationalReported planned 1,500 MWSource updated 26 July 2026approximate location
  43. source-reported permittedReported planned 96 MWSource updated 7 July 2026approximate location
  44. source-reported proposedCapacity not statedSource updated 14 October 2026approximate location
  45. source-reported permittedCapacity not established; source review excludes the published figureSource updated 23 September 2026approximate location
  46. source-reported proposedCapacity not statedSource updated 30 September 2026approximate location
  47. source-reported cancelledCapacity not statedSource updated 14 October 2026approximate location
  48. source-reported permittedReported planned 1,300 MWSource updated 30 September 2026approximate location
  49. Project Bus (Atlas Development Temple Data Center Campus)

    Atlas Development LLC

    Vaughn Road / Center Point Road / Terrell Road / Mandeville Road · Temple · Carroll County · Georgia

    source-reported cancelledCapacity not statedSource updated 14 October 2026approximate location
  50. source-reported proposedReported planned 3,200 MWSource updated 14 October 2026approximate location
Source and reuse

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. DataCenterData normalized selected fields and added stable IDs. Download the attributed JSON → Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).