- Operator as published
- DC BLOX
- Address and locality
- Lithia Springs · Douglas County · Georgia
- Official metro area
- Atlanta-Sandy Springs-Roswell, GA
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 120 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 6 July 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000426
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Greystone Power Cooperative
- Power source
- Grid
- Cooling
- Air
- Land area
- 100 acres (source-reported; parcel boundary not established)
- Announced investment
- $1.15 billion
- Community response
- Provider label: mixed
- AI-use label (provider)
- confirmed
- Announced
- August 2025
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- City of Douglasville property-tax abatement — $98M over 11 years (graduated: 0% years 1-3, 10% years 4-5, then 20%/40%/50% years 6-8, 60% years 9-10; applies to buildings/land, not servers) · City of Douglasville, GA · 2025 Open cited source →
Provider notes
Water. DC BLOX's campus design specifies high-efficiency magnetic-bearing air-cooled chillers with thermal storage and provisions for a future liquid-cooling tie-in (operator campus page); the company characterizes the design as effectively waterless. Air-cooled chillers still use minimal water (humidification/occasional evaporative assist); no quantified water-use (MGD) figure has been published, and use could change if the liquid-cooling provision is activated.
Community. Douglasville City Council unanimously approved the $98M abatement for the expanded campus (Mayor Pro Tem Terry Miller: 'It's hard to scoff at $2 billion coming into your community'); the project sits within a broader Douglas County data-center growth and zoning debate. No DC BLOX-specific organized opposition or litigation found.
What the source record says
Initial 120 MW phase (Building A); site plan includes additional 80 MW Building B (delivery early 2028) and 80 MW Building C (early 2029) totaling 200+ MW. investmentUsd reflects green loan construction financing announced August 11, 2025. Located adjacent to Microsoft Douglasville campus, 2.5 miles from Google facility. Coordinates are Lithia Springs area centroid. Original DCD source URL returned HTTP 404 and was replaced with the DC BLOX official press release, which resolves and supports all claims. The $98M Douglasville abatement was granted for the campus in the Riverside West Business Park (New River Road); city/authority filings cite 25 permanent jobs (~$130k average) and up to 500 construction jobs over five years — projections, not confirmed headcounts.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-08-11 · source-reported proposed
$1.15 billion green loan financing announced; 120 MW campus on 100 acres in Lithia Springs adjacent to Microsoft campus
- 2025-09 · source-reported under construction
Phase 1 (120 MW Building A) construction underway; delivery targeted 2026
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- DC BLOX Secures $1.15 Billion Green Loan for Atlanta Data Center Campus Development · DC BLOX
- Atlanta West Hyperscale Data Center Campus – DC BLOX official page · DC BLOX
- City approves $98 million tax break for expanded data site · Douglas County Sentinel
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID dc-blox-atlanta-west-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Atlanta West
- Address as published
- 1701 North River Road, Lithia Springs, GA 30122
Lifecycle status is not published for this listing.
Floor area: 1,370,000 square feet.
Cooling design reported by the operator: N+2 redundancy.
Tier: Tier III (operator wording: design).
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000426
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Lithia Springs, GA · Douglas (Approximate location)
Roles
- Operator: DC BLOX
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: August 2025
Provider-reported announcement date.
- Status history: 2025-08-11 · source-reported proposed
Status history supplied by the source.
- Status history: 2025-09 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 100 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 120 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Greystone Power Cooperative
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Air
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $1.15 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: City of Douglasville property-tax abatement — $98M over 11 years (graduated: 0% years 1-3, 10% years 4-5, then 20%/40%/50% years 6-8, 60% years 9-10; applies to buildings/land, not servers) · City of Douglasville, GA · 2025
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-06
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.