This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Bolingbroke Technology Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Bolingbroke Technology Center (developer; landowners Henry Davis Properties, LLC, Ingram Timber Enterprises, L.P. and others)
- Address and locality
- Bolingbroke · Monroe County · Georgia
- Official metro area
- Macon-Bibb County, GA
- Source-reported status
- cancelled
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001771
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 900 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: litigation
Provider notes
Community. Monroe County commissioners unanimously denied the rezoning after the planning board recommended denial. Landowners sued the county in September 2025, calling the decision unlawful.
What the source record says
Proposed campus on ~900 acres along I-475 and Highway 41 near Bolingbroke. The rezoning was denied Aug 5, 2025, and landowners filed suit. Coordinates are the Bolingbroke community centroid.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-08-05 · source-reported cancelled
Monroe County Board of Commissioners unanimously denied the rezoning
Sources and attribution
- Monroe County, Ga., Officials Shoot Down New Data Center · Government Technology
- Bolingbroke property owners sue Monroe County over rezoning denial · WGXA
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID bolingbroke-technology-center-monroe-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001771
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Bolingbroke, GA · Monroe (Approximate location)
Roles
- Operator: Bolingbroke Technology Center (developer; landowners Henry Davis Properties, LLC, Ingram Timber Enterprises, L.P. and others)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported cancelled
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2025-08-05 · source-reported cancelled
Status history supplied by the source.
Area, acreage and buildings
- Land area: 900 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Community response: Provider label: litigation
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.