Licensed lead · not independently verified · dcd-dir-000208

Bridgeport Data Center Campus

source-reported proposed

Undisclosed developer (Bridgeport Industrial Park)

Moreland · Coweta County · Georgia

Capacity not statedSource updated 10 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Bridgeport Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Undisclosed developer (Bridgeport Industrial Park)
Address and locality
Moreland · Coweta County · Georgia
Official metro area
Atlanta-Sandy Springs-Roswell, GA
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
10 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000208

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Not establishedThe provider reports water information but no cooling type.
Reported water use
0.5 million gallons per day (source-reported)Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Land area
1,063.9 acres (source-reported; parcel boundary not established)

Provider notes

Water. The application states about 500,000 gallons of water per day and about 100,000 gallons of wastewater per day.

What the source record says

Six data center buildings with substations proposed on 1,063.9 acres along U.S. 27/29 near Interstate 85, spanning unincorporated Coweta County and Moreland. The applicant is represented by Steven Jones of the McKagen Jones Law Firm; the original 2015 industrial-park developer was listed as P&L Bridgeport 1 and P&L Bridgeport 2, and current control of the data center proposal is not publicly stated, so no operator is asserted. The reported campus valuation is a $3-5 billion range and is therefore not recorded as a single investment figure. Coordinates are approximate to Moreland.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-04 · source-reported proposed

    Development of Regional Impact forms submitted; the Three Rivers Regional Commission determined a DRI review was required. The underlying industrial park was approved in 2015 for manufacturing, research, warehousing and office use; the new filing adds data centers.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID bridgeport-data-center-campus-coweta-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000208

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Moreland, GA · Coweta (Approximate location)

Roles

  • Operator: Undisclosed developer (Bridgeport Industrial Park)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-04 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 1,063.9 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

  • Reported water use: 0.5 million gallons per day (source-reported)

    Whether this is metered use, a permit limit or a request is not established; see the provider water note.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →