Oakley Real Estate Partners Brown Farm Road Data Center

source-reported proposed

Oakley Real Estate Partners

Brown Farm Road SW (west end) · Cartersville · Bartow County · Georgia

Capacity not statedSource updated 30 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Oakley Real Estate Partners Brown Farm Road Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Oakley Real Estate Partners
Address and locality
Brown Farm Road SW (west end) · Cartersville · Bartow County · Georgia
Official metro area
Atlanta-Sandy Springs-Roswell, GA
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
30 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001929

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Land area
111.4 acres (source-reported; parcel boundary not established)
Announced jobs
50 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Water. Developer-stated: closed-loop cooling that recirculates a fixed volume of water, with yearly water use estimated at around 10,000 gallons ("about the amount of water in a residential pool"), drained about once a year to the sanitary sewer. The developer said the site stays out of the FEMA regulatory floodway and the river keeps its vegetated stream buffers.

Community. The 2026-07-15 community meeting drew a standing-room crowd, and the residents who spoke were opposed, citing noise, water use, environmental effects, falling property values and the future of the area's historic district; opponent Alex Payne said the developers "paint a nice pretty picture" but leave questions about who will ultimately use the facility. At the 2026-08-24 Planning Commission hearing, moved to Courtroom D to accommodate a crowd that packed it to capacity, nearly everyone present was in opposition. Board member Richard Fox read that State Rep. …

What the source record says

Rezoning request by Akin & Tate P.C. on behalf of Oakley Real Estate Partners for about 111.4 acres at the west end of Brown Farm Road, near the Etowah River, from A-1 (agricultural) to Business Park District, with a land-use-map change from low density residential to industrial. Oakley described it as a micro-scale data center it intends to market; no end user has been named. The plan is two buildings of about 374,000 sq ft in total, with a power substation and a single access drive, and a voluntary condition that the campus never exceed 450,000 sq ft. Other self-imposed conditions: setbacks of at least 200 ft from residential areas, and no cryptocurrency mining. Oakley estimated about 50 jobs and roughly $5 million a year in property taxes. At the Planning Commission hearing, Oakley said the substation and the nearest building would each sit 400 ft from the riverbank. The hearing was first set for 2026-07-27 but was removed from that agenda after county staff found a discrepancy in the notice sent to Native American nations with ties to the district. The Planning Commission voted 6-0 to recommend denial on 2026-08-24; the commissioner's 2026-09-02 agenda listed zoning applications, but as of 2026-09-30 neither the meeting minutes nor any press report of the final decision had been found. No Georgia DRI filing exists for the project. No capacity or investment figure has been disclosed. Coordinates are the western end of Brown Farm Road SW in OpenStreetMap, the location the press gives for the site, not a surveyed parcel centroid.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07 · source-reported proposed

    Akin & Tate P.C., on behalf of Oakley Real Estate Partners, applied to rezone about 111.4 acres off Brown Farm Road from A-1 to Business Park District and to change the land use map from low density residential to industrial; Oakley presented the plan at a 2026-07-15 community meeting. On 2026-08-24 the Bartow County Planning Commission voted 6-0 against both requests, sending recommendations for denial to the sole commissioner for a final decision at his 2026-09-02 meeting.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID oakley-brown-farm-road-cartersville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001929

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Brown Farm Road SW (west end), Cartersville, GA · Bartow (Approximate location)

Roles

  • Operator: Oakley Real Estate Partners

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-07 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 111.4 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced jobs: 50 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-30

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →