Licensed discovery layer · Compute Atlas 1.34.1

Iowa data centers

55 listings from a licensed directory. They are not independently verified and are not a statewide census.

55 licensed rows37 eligible organization labels33 city/state labelsLicensed edition dated 14 October 2026

Iowa map

Reported locations in Iowa

55 licensed rows · 34 source localities · 6 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 71 data-center source listings here across licensed, operator and DataCenterData layers (58 with a map point); 78 with government registry records. Source listings are not distinct sites.
Browse 6 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Two layers, two jobs. These licensed rows have not been independently verified by DataCenterData and are not a census. Reviewed evidence remains separate.

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

6 operator-listed sites (mixed units; not added to licensed rows) in Iowa →

Separate layer

Listed in the federal EPA registry

Street addresses where the U.S. EPA facility registry lists a registration whose name says data center or whose registrant is a known operator under industry code 518210, and that are not rows in the licensed directory or operator-listed sites. Each is one or more registry records, not a building count, and is never added to the counts above.

1 address in the U.S. EPA facility registry (registry records, not buildings; not added to licensed rows) in Iowa →

Browse by city

33 reported localities

City labels are reproduced as published. They are not inferred metro areas.

Showing 1–50 of 55 Iowa licensed source rows.

  1. source-reported operationalCapacity not statedSource updated 11 October 2026exact location (provider label)
  2. source-reported operationalCapacity not statedSource updated 16 September 2026approximate location
  3. source-reported proposedReported planned 200 MWSource updated 4 September 2026approximate location
  4. source-reported operationalReported operational 0.81 MWSource updated 8 August 2026approximate location
  5. Aureon 616 Data Center

    Aureon

    616 10th Street · Des Moines · Polk County · Iowa · 50309

    source-reported operationalCapacity not statedSource updated 21 September 2026exact location (provider label)
  6. source-reported operationalCapacity not statedSource updated 14 August 2026approximate location
  7. source-reported operationalReported operational 0.6 MWSource updated 8 August 2026approximate location
  8. source-reported operationalReported operational 1 MWSource updated 21 September 2026approximate location
  9. source-reported proposedCapacity not statedSource updated 16 September 2026approximate location
  10. source-reported proposedReported planned 1,000 MWSource updated 10 September 2026approximate location
  11. source-reported operationalCapacity not established; source review excludes the published figureSource updated 21 September 2026exact location (provider label)
  12. source-reported under constructionReported planned 13.2 MWSource updated 16 September 2026approximate location
  13. source-reported under constructionCapacity not statedSource updated 4 September 2026approximate location
  14. Enseva Hiawatha Data Center

    Enseva

    755 Metzger Drive · Hiawatha · Linn County · Iowa · 52233

    source-reported operationalCapacity not statedSource updated 16 September 2026exact location (provider label)
  15. source-reported operationalCapacity not statedSource updated 4 September 2026exact location (provider label)
  16. source-reported operationalCapacity not statedSource updated 16 September 2026exact location (provider label)
  17. source-reported under constructionCapacity not statedSource updated 26 July 2026approximate location
  18. source-reported operationalCapacity not established; source review excludes the published figureSource updated 21 September 2026approximate location
  19. source-reported proposedCapacity not statedSource updated 14 August 2026approximate location
  20. source-reported operationalCapacity not statedSource updated 16 September 2026approximate location
  21. source-reported operationalCapacity not statedSource updated 11 October 2026exact location (provider label)
  22. source-reported operationalCapacity not statedSource updated 21 September 2026exact location (provider label)
  23. source-reported operationalReported operational 5 MWSource updated 16 September 2026exact location (provider label)
  24. source-reported operationalCapacity not statedSource updated 4 September 2026approximate location
  25. source-reported proposedCapacity not statedSource updated 16 September 2026approximate location
  26. source-reported operationalCapacity not statedSource updated 8 August 2026approximate location
    View lead →dcd-dir-000867
  27. source-reported proposedReported planned 25 MWSource updated 21 August 2026approximate location
  28. source-reported operationalCapacity not statedSource updated 11 October 2026exact location (provider label)
  29. source-reported proposedCapacity not statedSource updated 10 September 2026approximate location
  30. source-reported operationalReported operational 350 MWSource updated 14 September 2026approximate location
  31. source-reported proposedCapacity not statedSource updated 14 August 2026approximate location
  32. source-reported operationalCapacity not statedSource updated 16 September 2026approximate location
  33. source-reported under constructionCapacity not statedSource updated 16 September 2026approximate location
  34. source-reported under constructionCapacity not statedSource updated 16 September 2026exact location (provider label)
  35. source-reported operationalCapacity not statedSource updated 16 September 2026approximate location
  36. source-reported under constructionCapacity not statedSource updated 16 September 2026approximate location
  37. source-reported proposedCapacity not statedSource updated 8 August 2026approximate location
    View lead →dcd-dir-001001
  38. source-reported proposedCapacity not statedSource updated 10 September 2026approximate location
  39. source-reported permittedReported planned 10 MWSource updated 16 September 2026approximate location
  40. source-reported operationalReported operational 5 MWSource updated 16 September 2026approximate location
  41. source-reported proposedCapacity not statedSource updated 16 September 2026approximate location
  42. source-reported proposedReported planned 25 MWSource updated 14 August 2026approximate location
  43. source-reported under constructionReported planned 1,050 MWSource updated 16 September 2026approximate location
  44. source-reported proposedCapacity not statedSource updated 21 September 2026approximate location
  45. source-reported proposedCapacity not statedSource updated 14 August 2026approximate location
  46. source-reported operationalCapacity not statedSource updated 4 September 2026exact location (provider label)
  47. source-reported operationalCapacity not statedSource updated 11 October 2026exact location (provider label)
  48. source-reported proposedCapacity not statedSource updated 16 September 2026approximate location
  49. source-reported operationalCapacity not statedSource updated 14 August 2026approximate location
  50. source-reported permittedReported planned 1,000 MWSource updated 14 August 2026approximate location
Source and reuse

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. DataCenterData normalized selected fields and added stable IDs. Download the attributed JSON → Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).