Licensed lead · not independently verified · dcd-dir-000708

Google Cedar Rapids Data Center Campus

source-reported under construction

Google

Cedar Rapids · Linn County · Iowa

Capacity not statedSource updated 26 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Google Cedar Rapids Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Google
Address and locality
Cedar Rapids · Linn County · Iowa
Official metro area
Cedar Rapids, IA
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
26 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000708

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Alliant EnergyUtility as named by the provider.
Power source
GridProvider label.
Cooling
EvaporativeProvider label.
Announced investment
$576 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
May 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Cedar Rapids 20-year, 70% property-tax abatement (IEDA-approved) — ~$56M total over the term; contingent on a 31-job employment threshold · Cedar Rapids, IA · 2025 Open cited source →
  • Iowa data-center sales/use-tax exemption (Iowa Code §423.3(92)–(95)) — 10-year electricity exemption under H.F. 976 for cities >30,000 pop.; site's $576M investment exceeds the $200M threshold · Iowa · 2025 Open cited source →
  • Cedar Rapids development-agreement 75% franchise-fee rebate on electrical service, per data center, for 20 years · Cedar Rapids, IA · 2025 Open cited source →

Provider notes

Energy. Big Cedar Industrial Center served by Alliant Energy; Google targets carbon-free electricity matching

Water. Traditional evaporative (water-based) cooling (Daily Iowan, Dec 2025: "the Google center is using the traditional water cooling method"). Estimated use "just over 4 million gallons of water a day" — a pre-operational estimate, not a metered figure. For comparison, Google's Council Bluffs campus averaged ~3.9 MGD.

Community. City Council approved the project in Jan 2025; Mayor Tiffany O'Donnell called it "a once-in-a-generation opportunity that changes the game for our city." Energy advocates raised water, grid, and emissions concerns (Daily Iowan, Dec 2025); no organized opposition or litigation found. Jobs (est.): "more than 1,200 construction workers" and "about 100 operational employees," with an IEDA minimum of 31 jobs at ≥$31.44/hr — estimates/contractual floors, facility still under construction. …

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Land area: The source note describes 1,391 acres as the industrial park this campus shares with an adjacent QTS campus, not this campus’s own land.

What the source record says

Coordinates approximate for Big Cedar Industrial Center at 76th Ave SW and Edgewood Rd SW in SW Cedar Rapids. Cedar Rapids campus investment ~$576M; part of Google's $7B+ total Iowa commitment announced May/June 2025. Adjacent to QTS campus in same 1,391-acre industrial park. Also exploring a second Linn County campus near Duane Arnold nuclear plant in Palo.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-03 · source-reported proposed

    Google identified via Iowa Economic Development Authority documents as developer behind Heaviside LLC at Big Cedar Industrial Center; initial project value $576M

    Open cited source →

  2. 2024 · source-reported under construction

    Construction targeted Q2 2024; five buildings planned; first building targeted operational 2026

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-cedar-rapids-ia. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

State or local registry record

What a state or local government record says naming this company in this city (no street is given in the record). The record is cited, not republished. It does not establish that a data center is operating, its capacity, or its owner or operator unless the record says that role. It is not added to the counts on this page.

Matched by name and city only. The government record names Google LLC in Cedar Rapids and gives no street. It is shown here because this is the only published record with that name in that city; it may concern another site of the same company there.

Google

Publishing agency
Iowa Economic Development Authority
Record type
state incentive award list
Evidence scope
Additional Google/Cedar Rapids project evidence, matched by name and city only. The verified quotes bind no award date or street. No lifecycle update is made.
Named in the record
Google LLC The record does not call this company the operator.
Location precision
Cedar Rapids only The record names a city and no street. It is not placed on the map and is not a distinct-site finding.

Factual fields cited to the named government page. DataCenterData does not republish the page or the underlying database. A permit, certification, tax status, or application does not by itself establish an operating data center.

What this record does not establish

  • That a permit, certification, tax status, or application means an operating data center.
  • Current IT capacity, utility load, or generation capacity.
  • Who operates the site. A company named in the record is not the operator unless the record says so.
  • Who owns the site.
  • Cooling redundancy. Mentioned equipment is not a design rating.
  • Whether the record covers one building, a campus, or a suite, beyond the unit label the record itself uses.
No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000708

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Cedar Rapids, IA · Linn (Approximate location)

Roles

  • Operator: Google

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: May 2025

    Provider-reported announcement date.

  • Status history: 2024-03 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2024 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Alliant Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Evaporative

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $576 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Cedar Rapids 20-year, 70% property-tax abatement (IEDA-approved) — ~$56M total over the term; contingent on a 31-job employment threshold · Cedar Rapids, IA · 2025

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Iowa data-center sales/use-tax exemption (Iowa Code §423.3(92)–(95)) — 10-year electricity exemption under H.F. 976 for cities >30,000 pop.; site's $576M investment exceeds the $200M threshold · Iowa · 2025

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Cedar Rapids development-agreement 75% franchise-fee rebate on electrical service, per data center, for 20 years · Cedar Rapids, IA · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-26

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →