Licensed lead · not independently verified · dcd-dir-000978

Microsoft Project Ginger West Data Center

source-reported under construction

Microsoft

11100 Booneville Road · West Des Moines · Polk County · Iowa

Capacity not statedSource updated 16 September 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Microsoft Project Ginger West Data Center.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Microsoft
Address and locality
11100 Booneville Road · West Des Moines · Polk County · Iowa
Official metro area
Des Moines-West Des Moines, IA
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
16 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000978

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
MidAmerican EnergyUtility as named by the provider.
Power source
GridProvider label.
Cooling
HybridProvider label.
Land area
188 acres (source-reported; parcel boundary not established)
Announced investment
$1.65 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
2021Provider-reported announcement date.

Provider notes

Energy. Iowa wind and renewables; Microsoft contracts 100% carbon-free electricity for Iowa operations

Water. Microsoft's West Des Moines datacenters use direct evaporative cooling (water ~10% of the year, air-cooled the rest); a planned Ginger West building is committed to next-generation 'zero-water' cooling under WDM's 2023 policy favoring reduced peak water use. Microsoft's WDM fleet (five campuses) used ~70M gallons in 2024 (fleet-wide, not Ginger West-specific); Microsoft funded ~$25M in WDM Water Works improvements incl. a 2M-gallon tank.

Community. WDM Mayor Russ Trimble has praised Microsoft as a 'game changer' and 'great corporate citizens' (never exceeding agreed water allotments); neighboring residents cite light pollution, traffic, noise, and water-use concerns. No formal opposition group or litigation identified.

What the source record says

Site at 11100 Booneville Rd area, West Des Moines (Polk County). 1.8M sq ft planned across multiple buildings. Turner Construction is general contractor; completion estimated summer 2028. Companion Ginger East campus (124 acres, 5 buildings) is a separate site in West Des Moines. Part of Microsoft's multi-billion dollar total Iowa investment since 2009. Planned MW capacity not confirmed from primary sources; 444 MW figure removed as unsupported. Iowa's Sec. 423.3(95) data-center sales-tax exemption applies, but Iowa data-center incentive awards are not publicly disclosed; no Ginger West-specific job count is published.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2021 · source-reported proposed

    West Des Moines approved first two buildings of Ginger West; construction start targeted September 2021

    Open cited source →

  2. 2021 · source-reported under construction

    Construction underway; first building came online 2023 (244,676 sq ft); additional phases ongoing targeting summer 2028 completion

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID microsoft-ginger-west-ia. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000978

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • 11100 Booneville Road, West Des Moines, IA · Polk (Exact location)

Roles

  • Operator: Microsoft

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2021

    Provider-reported announcement date.

  • Status history: 2021 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2021 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 188 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: MidAmerican Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Hybrid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1.65 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-16

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →