Licensed lead · not independently verified · dcd-dir-001092

Oppidan Cedar Rapids Data Center

source-reported permitted

Oppidan

1515 33rd Avenue SW · Cedar Rapids · Linn County · Iowa · 52404

Reported planned 10 MWSource updated 16 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Oppidan Cedar Rapids Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Oppidan
Address and locality
1515 33rd Avenue SW · Cedar Rapids · Linn County · Iowa · 52404
Official metro area
Cedar Rapids, IA
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
16 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001092

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Announced investment
$100 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
15 permanent · 250 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
8 July 2026Provider-reported announcement date.

Provider notes

Water. The Gazette reports the project uses a closed-loop water cooling system.

Community. Cedar Rapids Mayor Tiffany O'Donnell voiced support (2026-07-08), framing data centers as consistent with the city's industrial identity. However, neighboring/overlapping Linn County had recently adopted a temporary moratorium on data centers -- Cedar Rapids itself is not applying that moratorium here because the site is already zoned for light-industrial use (permitted since the early 2000s), so this specific project proceeds despite county-level backlash driving the moratorium elsewhere. No direct opposition testimony to THIS project was found.

What the source record says

Just north of Highway 30 on the southwest side. Over 98,000 sq ft, no city incentives, construction expected to start in fall 2026 or early spring 2027 depending on equipment availability. Permit documents name the applicant entity as CLOP Cedar Rapids, IA LLC. The Gazette reports the facility is intended for networking, signal boosting and storage rather than AI training or inference, so no aiClassification value is recorded — the existing enum cannot express 'assessed, not AI.' Oppidan built a comparable 60,000 sq ft, 5 MW facility in Des Moines in 2024, which is tracked separately.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07-08 · source-reported permitted

    Cedar Rapids confirmed the project after building permits were filed; the site has been zoned light industrial since the early 2000s, so a data center is a permitted use and no public hearing is required.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID oppidan-cedar-rapids-ia. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001092

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 1515 33rd Avenue SW, Cedar Rapids, IA 52404 · Linn (Approximate location)

Roles

  • Operator: Oppidan

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 8 July 2026

    Provider-reported announcement date.

  • Status history: 2026-07-08 · source-reported permitted

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $100 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 15 permanent · 250 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-16

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →