Virginia index · last changed 1 November 2026

Virginia data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of Virginia data centers.

60 sourced policy records for Virginia ↓Facility register: 245 records · by county →17 published DataCenterData records · evidence status shown per row151 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore Virginia

Map, listings and checked facts.

Start with 151 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

Virginia map

Reported locations in Virginia

151 licensed rows · 66 source localities · 5 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 245 data-center source listings here across licensed, operator and DataCenterData layers (180 with a map point); 301 with government registry records. Source listings are not distinct sites.3 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 5 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

151 licensed rows48 reported city labels77 eligible organization labels

Browse all 151 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported cancelledCapacity not statedSource updated 21 September 2026approximate location
  2. source-reported permittedCapacity not statedSource updated 26 July 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

57 operator-listed sites (mixed units; not added to licensed rows) in Virginia →

32 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

Virginia evidence at a glance

Some questions answerable

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
12
Published facility / building
4
Attributed or unresolved rows
1
Licensed directory leads
151 not independently verified
Capacity boundary stated
0 of 17 published DataCenterData rows
Review timing
Audit through 23 September 2026 · next 17 December 2026
Known coverage gap

No public list of DCRSUT memorandum-of-understanding signatories or their localities.

Browse all 151 Virginia licensed leads → · Why these counts differ →

Projects, Campuses, Buildings, and Operating facilities

3 campus records · 9 project records · 2 operating facility records · 3 building records. Names are as they appear on each record page.

Projects, Campuses, Buildings, and Operating facilities published for Virginia
Record / rolesStatusCapacity / scalePrimary evidence
Google Data Center Campus — Botetourt Center at GreenfieldDeveloper: Google; exact legal entity not stated approvedcampus UnknownNo independently supported figure Botetourt County Google Data Center project page →Gov. record
EdgeCore Shannon Hill Data Center ProjectDeveloper: EdgeCore Digital Infrastructure proposedproject UnknownNo independently supported figure Louisa County Sale of Shannon Hill Regional Business Park →Gov. record
Solis Arx / Fluidstack Progress Park ProjectDeveloper: Solis Arx; acquired by Fluidstack according to Wythe County proposedproject UnknownNo independently supported figure Solis Arx/Fluidstack — Progress Park project page →Gov. record
Pairmont Data Center Campus proposedproject UnknownNo independently supported figure Spotsylvania County Planning Department March 2026 status report →Gov. record
Massaponax Tech Campus proposedproject UnknownNo independently supported figure Spotsylvania County Planning Department March 2026 status report →Gov. record
Thornburg Industrial Park 2 proposedproject UnknownNo independently supported figure Spotsylvania County Planning Department March 2026 status report →Gov. record
Mineral Gap Data Center operatingoperating facility UnknownNo independently supported figure Data Centers — Wise County Economic Development →Gov. record
Google Bermuda Hundred Data Center Campus constructioncampus · Chesterfield County data-center project status table as of July 2026, Peanut LLC row UnknownNo independently supported figureNo selected county record states critical-IT, utility-request, utility-service, generation, gross-facility, company-design or measured-load MW. The county's 6.000 MGD maximum public water use for this row is water, not IT load, and is not published as capacity. Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record
Google Upper Magnolia Green Data Center Project approvedproject · Chesterfield County data-center project status table as of July 2026, Upper Magnolia Green row UnknownNo independently supported figureNo selected county record states critical-IT or other MW. Tract A acreage is described site area, not capacity. The county's 1.755 MGD maximum public water use is water, not IT load. Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record
Google Watkins Centre Data Center Project approvedproject · Chesterfield County data-center project status table as of July 2026, Watkins Centre row UnknownNo independently supported figureNo selected county record states critical-IT or other MW. The 349.97-acre figure is rezoning site area, not capacity. The county's 0.850 MGD maximum public water use is water, not IT load. Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record
11751 Meadowville LLC unknownbuilding · Chesterfield County data-center project status table as of July 2026, 11751 Meadowville LLC row UnknownNo independently supported figureNo selected county record states critical-IT or other MW. The county's 0.626 MGD figure is stated maximum water usage, not measured consumption or capacity. Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record
Tradeport 95 Data Center Project proposedproject · Chesterfield County data-center project status table as of July 2026, Tradeport 95 row UnknownNo independently supported figureThe county table states no MW figure and lists maximum water usage as not specified. Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record
Google data center, Prince William CountyOperator: Google operatingUnresolved group · excluded from verified counts UnknownNo independently supported figureNo capacity is stated by the operator. A third-party modelled estimate is not used. Google Data Centers — Virginia →Company
EdgeCore AS01 unknownbuilding UnknownNo independently supported figureEdgeCore publishes a combined figure for AS01 and AS02. The reviewed evidence does not allocate it between the buildings. Loudoun County — EdgeCore AS01 permit →Gov. record
EdgeCore AS02 unknownbuilding UnknownNo independently supported figureEdgeCore publishes a combined figure for AS01 and AS02. The reviewed evidence does not allocate it between the buildings. Loudoun County — EdgeCore AS02 permit →Gov. record
Pacific Corporate Park (PowerHouse Pacific) unknowncampus UnknownNo independently supported figureNo power capacity is established by this identity review. Loudoun County — Pacific Corporate Park site plan →Gov. record
PowerHouse Arcola unknownproject UnknownNo independently supported figureNo capacity is assigned by this identity review. Loudoun County — Powerhouse Arcola plat →Gov. record

Where the records were checked

Statewide audit pending

Enough to answer questions

This is still not a list of every data center in the state.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 23 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 17 December 2026.

12 independently source-linked project/campus records; 4 independently source-linked facility/building records; 1 attributed or unresolved row. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Ashburn, Boydton, Bristow, Chester, Culpeper, Gainesville, Leesburg, Manassas, Petersburg, Remington, Ruther Glen. Their listings above are source listings to investigate. No statewide evidence answer is published for Virginia either; statewide and utility-territory rules are under Policy tracker below.

5 Virginia answers are not tied to a published record, so they are not placed here: Virginia answers.

Policy tracker

Virginia policy records

60 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 12 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Enacted legislation or regulation

Data center air permits: Tier 4 equivalent generator emission limits (Va. Code 10.1-1322.6)

In effect · Virginia · State

Effective: 1 July 2026

Issuing authority: Virginia General Assembly

Virginia Code section 10.1-1322.6, added by 2026 Acts chapter 397 (House Bill 507), requires that any Department of Environmental Quality air permit for a data center applied for on or after 1 July 2026 set engine-generator emission limits no higher than those of a Tier 4 equivalent gen-set, defined as one with selective catalytic reduction, a diesel oxidation catalyst and a diesel particulate filter or equivalents.

Read the sourced record · Primary source

Enacted legislation or regulation

Dominion tariff sheet collecting the Data Center Electricity Consumption Tax

In effect · Dominion Energy Virginia service territory, Virginia · Utility territory

Effective: 1 July 2026

Issuing authority: Virginia Electric and Power Company (Dominion Energy Virginia)

Dominion Energy Virginia's filed tariff includes a consumption-tax provision stating that, under the 2026 state budget, it will collect and remit a $0.011 per kWh Data Center Electricity Consumption Tax on electricity used by data center operators, beginning with September 2026 billing and applying to 1 July 2026 through 30 June 2028.

Read the sourced record · Primary source

Enacted legislation or regulation

APCo Virginia economic development rider excludes mobile data centers

In effect · Appalachian Power service territory, Virginia · Utility territory

Effective: 1 January 2025

Issuing authority: Appalachian Power Company (tariff filed with the Virginia State Corporation Commission)

Appalachian Power's Virginia Economic Development Rider, a demand-charge discount for qualifying new or expanded commercial and industrial load, bars customers with primarily portable or extractive load, naming cryptocurrency mining and mobile containers or units for server farms or mobile data centers, from applying after 1 February 2024.

Read the sourced record · Primary source

Permanent restriction or prohibition · Fairfax County only (local rule)

Fairfax County: data center zoning amendment (ZO 112.1-2024-9)

In effect · Fairfax County, Virginia · Local

Effective: 11 September 2024

Issuing authority: Fairfax County Board of Supervisors

Fairfax County's 2024 zoning amendment tightened where and how data centers may be built: in some industrial districts they need a special exception instead of being permitted by right, they are no longer allowed in the PRC district, and they require a special exception in PDC and PTC districts.

Read the sourced record · Primary source

Incentive or explicitly supportive policy

Data center retail sales-tax exemption

In effect · Virginia · State

Effective: 1 July 2010

Issuing authority: Virginia General Assembly

Virginia Code section 58.1-609.3, subdivision 18, provides a sales-and-use tax exemption for specified computer equipment and enabling software used in a qualifying data center.

Read the sourced record · Primary source

Reporting or resource-use requirement

Department of Energy data center waste-heat work group and report (2026 c. 591)

In effect · Virginia · State

Last checked: 3 November 2026

Issuing authority: Virginia General Assembly

Virginia's 2026 Acts chapter 591 directs the Department of Energy to study and promote beneficial use of waste heat from data centers, convene a work group of industry, local government, utility and other stakeholders, and report findings and legislative proposals to the House Labor and Commerce and Senate Commerce and Labor committees by 1 September 2026.

Read the sourced record · Primary source

Enacted legislation or regulation

Data center fixtures at 100 percent of cost-approach value (2026 Special Session I budget, Item 3-5.18)

In effect · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

The 2026 Special Session I budget (HB 30, Item 3-5.18) directs that data center fixtures classified as real estate be assessed at one hundred percent of fair market value as determined by the cost approach required by Code of Virginia section 58.1-3295.3.

Read the sourced record · Primary source · Archived copy (8 October 2026)

Pending or nonbinding 16 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Legislation introduced (any outcome) · Loudoun County only (local rule)

Loudoun County: proposed pause of up to 12 months on Board votes on data center applications

Proposed · Loudoun County, Virginia · Local

Source document: 20 October 2026

Issuing authority: Loudoun County Board of Supervisors

On 15 September 2026 a majority of the Loudoun County Board of Supervisors voted for future consideration of a resolution that, if approved, would pause the Board's action on data center and electrical substation applications that require legislative approval for up to 12 months.

Read the sourced record · Primary source

Reporting or resource-use requirement

JLARC study: Data Centers in Virginia (2024)

Informational—not binding · Virginia · State

Source document: 9 December 2024

Issuing authority: Joint Legislative Audit and Review Commission

JLARC’s 2024 study of the data center industry in Virginia, authorized by the Commission on 11 December 2023, found that data centers bring economic benefits mostly during construction, that unconstrained data center demand could double Virginia’s power demand within ten years, and that data centers are currently paying their full cost of service, though growing demand is likely to raise costs for other customers.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 1132 (2026): local use of data center tax revenue for residential energy programs (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 1132 of 2026 would authorize a locality that collects real or personal property taxes on data center property to create a local residential renewable energy incentive program, directing 15 percent of new data center revenue to residential solar and battery storage and 15 percent to pro rata vehicle personal property tax reimbursements, with penalties for misuse.

Read the sourced record · Primary source · Archived copy (12 February 2026)

Legislation introduced (any outcome)

HB 1515 (2026): proposed temporary pause on local data center approvals (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 1515 of 2026 would prohibit a locality from giving final approval to any rezoning, special exception, special use permit, site plan or plan of development for siting a new data center until the earlier of the fulfilment of all pending data center requests for interconnection to electric distribution service or 1 July 2028.

Read the sourced record · Primary source · Archived copy (13 September 2026)

Legislation introduced (any outcome)

HB 503 (2026): recovering data-center-driven utility costs from data center customers (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 503 of 2026 would bar Commission-approved rates from including utility costs that are substantially related to serving data center customers with a peak demand of 100 megawatts or more and would not have been incurred but for their demand, unless the rates are designed to recover those costs substantially from data center customers.

Read the sourced record · Primary source · Archived copy (8 June 2026)

Legislation introduced (any outcome)

HB 591 (2026): statement of Commonwealth policy on data centers (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 591 of 2026 would declare it Commonwealth policy to encourage responsible data center operation while supporting grid reliability, affordability and renewable deployment, including coordination with grid operators, demand response incentives, data centers paying their share of infrastructure investments and reporting of water and aggregated energy use.

Read the sourced record · Primary source · Archived copy (28 July 2026)

Legislation introduced (any outcome)

HB 607 (2026): DEQ study of aggregate air pollution from data center generators (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 607 of 2026 would direct the Department of Environmental Quality to conduct a three-year study modelling aggregate air pollution in areas with a large volume of data centers, with recommendations on minor air permits for data center generators and air-quality monitoring.

Read the sourced record · Primary source · Archived copy (11 September 2026)

Legislation introduced (any outcome)

HB 641 (2026): data center land preservation tax (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 641 of 2026 would create a data center land preservation tax of $3 per square foot of each data center facility footprint and direct at least $250 million of its revenue to land protection and preservation purposes.

Read the sourced record · Primary source · Archived copy (7 July 2026)

Legislation introduced (any outcome)

SB 336 (2026): SCC evaluation of data center generator tiers (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 336 of 2026 would direct the State Corporation Commission to evaluate the impact of requiring data centers to limit the use of Tier 2 generators and prioritize Tier 4 equivalent or better generators, and to report its findings to legislative committees.

Read the sourced record · Primary source · Archived copy (2 July 2026)

Legislation introduced (any outcome)

SB 393 (2026): data center land preservation tax (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 393 of 2026 would create a data center land preservation tax of $3 per square foot of each data center facility footprint and direct at least $250 million of its revenue to land protection and preservation purposes.

Read the sourced record · Primary source · Archived copy (7 June 2026)

Legislation introduced (any outcome)

SB 417 (2026): reclaimed-water condition for Cloud Computing Cluster grants (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 417 of 2026 would require data center operators applying for Cloud Computing Cluster Infrastructure Grant Fund payments to use reclaimed water for water-dependent cooling, rising from 60 percent beginning 1 July 2027 to 100 percent on and after 1 July 2031.

Read the sourced record · Primary source · Archived copy (28 July 2026)

Legislation introduced (any outcome)

SB 466 (2026): distribution infrastructure costs for data centers (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 466 of 2026 would prohibit recovering from any other customer the costs of constructing or extending electric distribution infrastructure that primarily serves the load of a data center, including associated land acquisition.

Read the sourced record · Primary source · Archived copy (13 April 2026)

Legislation introduced (any outcome)

SB 521 (2026): rainwater harvesting at new or expanded data centers (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 521 of 2026 would require new construction or substantial expansion of a data center to include a rainwater harvesting system capturing runoff from at least 30 percent of the total roof area and to use the harvested water for non-potable needs, including irrigation or heat dissipation.

Read the sourced record · Primary source · Archived copy (10 October 2026)

Legislation introduced (any outcome)

SB 93 (2026): data center sales-tax exemption where a tenant is a bank (carried over)

Proposed · Virginia · State

Last checked: 23 September 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 93 of 2026 would provide that the data center computer equipment sales and use tax exemption does not apply to a data center operator or its tenants if any tenant is a bank, and would make banks’ computer equipment used in a data center taxable personal property for banks subject to the bank franchise tax.

Read the sourced record · Primary source

History 32 records

Expired, repealed, vetoed, failed, blocked, superseded and completed measures remain visible without being presented as current.

Legislation introduced (any outcome)

HB 1101 (2026): data center revenue in the school funding formula (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 1101 of 2026 would have required the Department of Education, with the Department of Taxation, to revise the local composite index school funding formula to count local revenue generated by data centers, including real property and business personal property taxes attributable to their operation, subject to later General Assembly approval.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 154 (2026): public notice of data center emergency generator operation (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 154 of 2026 would have directed the Department of Environmental Quality to require each data center that operates an emergency generation unit to report on a publicly accessible website, within 24 hours, the times when that unit will be in operation.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2026 (2025): local zoning review for data centers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2026 of 2025 would have required a locality whose zoning ordinance addresses data centers to review and amend it to designate data centers as industrial uses, review by-right locations and minimum requirements, identify areas suited to data centers, address data center noise and require mitigation commitments.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2028 (2025): one-time school fee from new data centers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2028 of 2025 would have entitled a school board whose division has a public school within three miles of a data center receiving its certificate of occupancy after 1 July 2025 to a one-time fee of $250,000 from the data center owner.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2101 (2025): SCC proceedings on data center cost allocation (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2101 of 2025 would have directed the State Corporation Commission to determine whether current cost allocation requires customers that are not data centers to unreasonably subsidize data center customers and, if so, to adopt rules to eliminate or minimize the subsidy.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2377 (2025): water-saving cooling in local comprehensive plans for data centers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2377 of 2025 would have required every locality to include in its comprehensive plan provisions prioritizing and evaluating cooling methods that minimize water use, particularly when approving or siting data centers or similar land uses, and to consider such alternatives before approving water-reliant cooling.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2428 (2025): digital asset mining in the data center property-tax class (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2428 of 2025 would have provided that, for the separate local tangible personal property tax classification of computer equipment and peripherals used in a data center, a data center includes facilities housing digital asset mining systems.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2578 (2025): clean-energy and generator conditions on the data center sales-tax exemption (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2578 of 2025 would have conditioned eligibility for the data center sales and use tax exemption on clean-energy purchases, efficiency investments and lower-emission backup generators, and directed studies of non-diesel generation and data center waste-heat reuse.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2684 (2025): stranded-cost plan for new data center customers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2684 of 2025 would have directed Dominion Energy Virginia (a Phase II Utility) to file every two years a plan addressing the risk that generation and transmission costs of serving new data center customers are stranded with other customers.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2685 (2025): pausing the data center sales-tax exemption for new Planning District 8 data centers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2685 of 2025 would have made the data center computer equipment sales and use tax exemption unavailable, between 1 July 2025 and 1 July 2030, for equipment used in a data center constructed after 1 July 2025 in Planning District 8.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2712 (2025): local authority to require water, sound and power estimates for data centers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2712 of 2025 would have allowed a locality considering a data center land use application to require and consider water use estimates, sound modeling studies and power load demand estimates, and to set and enforce maximum sound levels for operating data centers.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 2715 (2025): wage conditions on the data center sales-tax exemption (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia House Bill 2715 of 2025 would have made data center operators eligible for the sales and use tax exemption only if building service employees at the data center were paid at least a standard rate, with audits and revocation after three violations.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 511 (2026): local zoning review for data centers (incorporated into HB 153; did not pass on its own)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 511 of 2026 would have required a locality whose zoning ordinance addresses data centers to review and amend that ordinance to designate data centers as industrial uses, review by-right locations and minimum requirements, identify areas suited to data center development, address data center noise and require mitigation commitments; the Session Summary states it was incorporated into HB 153.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 589 (2026): monthly reporting of water supplied to data centers (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 589 of 2026 would have required any water user that provides water to a data center and must register withdrawal and use data with the State Water Control Board to report, monthly or as often as practicable, the total volume of water, including reclaimed water, provided to that data center.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 658 (2026): SCC review of cost allocation between data centers and other customers (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 658 of 2026 would have directed the State Corporation Commission to determine whether transmission cost allocation for Dominion Energy and Appalachian Power, and generation and distribution cost allocation for Dominion Energy, require customers that are not data centers to unreasonably subsidize the costs of serving data center customers.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 784 (2026): annual public report on data center sales-tax exemptions (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 784 of 2026 would have required the Department of Taxation to publish an annual report naming each data center operator receiving the retail sales and use tax exemption, with the amount claimed, whether the job and investment goals in its memorandum of understanding were met, and its employment and wage levels.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 824 (2026): work group on data center energy generation and storage (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 824 of 2026 would have directed the Department of Energy to convene a work group to study the cost and feasibility of energy generation by data centers, its use as backup or primary generation, and energy storage by data centers, and to report its findings to the General Assembly.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 897 (2026): clean-energy conditions on the data center sales-tax exemption (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 897 of 2026 would have conditioned eligibility for the existing data center sales and use tax exemption on limits to co-located carbon-dioxide-emitting generation, clean-energy procurement, non-emitting backup power and efficiency investments.

Read the sourced record · Primary source

Legislation introduced (any outcome)

HB 961 (2026): narrowing the data center sales-tax exemption (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia House Bill 961 of 2026 would have limited the retail sales and use tax exemption for data center computer equipment or enabling software to purchases or leases made before a data center starts operations or as part of an energy-efficiency-improving refresh cycle of an existing data center.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 1045 (2025): data centers only on industrial-classified property (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia Senate Bill 1045 of 2025 would have allowed local approval of a land use application for siting a data center only if the data center is on property classified by local ordinance for industrial use, for applications submitted on or after 1 July 2025.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 1046 (2025): noise, notice and generator-disclosure conditions for data centers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia Senate Bill 1046 of 2025 would have conditioned local land use approval for siting a data center on resident notice and neighborhood meetings, sound mitigation to keep levels at or below a baseline, five years of post-occupancy noise studies, and a public website announcing backup generator operating times.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 1196 (2025): energy-efficiency conditions on the data center sales-tax exemption (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia Senate Bill 1196 of 2025 would have made data center operators eligible for the sales and use tax exemption only if their facilities met a power usage effectiveness score of 1.2 or less (or an equivalent efficiency level) and they would procure carbon-free renewable energy equal to 90 percent of their electricity requirements.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 1358 (2025): underground transmission pilot with costs assigned to data center customers (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia Senate Bill 1358 of 2025 would have required the State Corporation Commission to approve certain proposed 500-kilovolt transmission lines as underground pilot projects, with localities paying part of unrecovered costs and the remainder assigned to the utility’s data center customers.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 334 (2026): public hearing before localities convey easements for data center operations (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 334 of 2026 would have required a locality disposing of permanent easements or rights-of-way for new electric transmission or distribution facilities over 69 kilovolts, data center operations or supporting facilities over 69 kilovolts, or commercial or industrial facilities served through such facilities to hold a public hearing first that discloses the proposed use, anticipated community and environmental impacts and alternative locations considered.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 465 (2026): energy-efficiency conditions on the data center sales-tax exemption (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 465 of 2026 would have made data center operators eligible for the sales and use tax exemption only if their facilities met a power usage effectiveness score of 1.2 or less (or an equivalent efficiency level for co-located buildings) and they would procure carbon-free renewable energy equal to 90 percent of their electricity requirements.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 552 (2026): DEQ site-assessment standards for large data centers (did not pass)

Did not pass · Virginia · State

Ended: 14 March 2026

Issuing authority: Virginia General Assembly

Virginia Senate Bill 552 of 2026 would have required a locality, before approving a rezoning, special exception or special use permit for the siting or major expansion of a large data center, to hold public hearings and require an applicant site assessment, which the Department of Environmental Quality would review against standards it was to develop for noise, light, water, air emissions, traffic and proximity impacts, with notices of violation, civil penalties and possible revocation of approval.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 899 (2025): local zoning provisions on data center water use (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia Senate Bill 899 of 2025 would have authorized a locality to include zoning provisions requiring proposed data center developments to submit water use estimates and to consider water use in rezoning and special use permit decisions for data centers.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 960 (2025): SCC proceedings on data center cost allocation (did not pass)

Did not pass · Virginia · State

Ended: 22 February 2025

Issuing authority: Virginia General Assembly

Virginia Senate Bill 960 of 2025 would have directed the State Corporation Commission to determine whether current cost allocation requires customers that are not data centers to unreasonably subsidize data center customers and, if so, to adopt rules to eliminate or minimize the subsidy.

Read the sourced record · Primary source

Federal and multistate

Federal and multistate instruments that cover all or part of Virginia

These federal, reliability-organization and multistate grid or utility instruments are stored once and listed for every jurisdiction they name. They do not add to the record count, in-effect total or map shading for Virginia. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.

Reporting or resource-use requirement · Listed coverage: part of Virginia

PJM: Large Load definition and registry accepted by FERC; capacity and curtailment rules rejected (ER26-3515)

In effect · PJM region (multistate) · Regional grid

Effective: 12 October 2026

Issuing authority: Federal Energy Regulatory Commission

On 9 October 2026 the Federal Energy Regulatory Commission accepted, effective 12 October 2026, PJM's definition of a Large Load at a cumulative peak of 50 MW and a Large Load Registry that requires load-serving entities to report on the Large Loads they serve, which the order says covers all such loads regardless of in-service date.

Read the sourced record · Primary source

Open the Virginia policy comparison

Review dates: the 60 Virginia records were last checked 23 September 2026 to 3 November 2026. 18 scheduled reviews are overdue as of the tracker date 3 November 2026: Executive Order 22: Virginia Data Center Accountability Framework, Data Center Electricity Consumption Tax (2026 Special Session I budget, Item 3-5.24), Dominion tariff sheet collecting the Data Center Electricity Consumption Tax, Fairfax County: data center zoning amendment (ZO 112.1-2024-9), Data center fixtures at 100 percent of cost-approach value (2026 Special Session I budget, Item 3-5.18), DEQ guidance APG-576: presumptive BACT for data center diesel generators (last checked 23 September 2026, review due 23 October 2026); HB 1132 (2026): local use of data center tax revenue for residential energy programs (carried over), HB 1515 (2026): proposed temporary pause on local data center approvals (carried over), HB 503 (2026): recovering data-center-driven utility costs from data center customers (carried over), HB 591 (2026): statement of Commonwealth policy on data centers (carried over), HB 607 (2026): DEQ study of aggregate air pollution from data center generators (carried over), HB 641 (2026): data center land preservation tax (carried over), SB 336 (2026): SCC evaluation of data center generator tiers (carried over), SB 393 (2026): data center land preservation tax (carried over), SB 417 (2026): reclaimed-water condition for Cloud Computing Cluster grants (carried over), SB 466 (2026): distribution infrastructure costs for data centers (carried over), SB 521 (2026): rainwater harvesting at new or expanded data centers (carried over), SB 93 (2026): data center sales-tax exemption where a tenant is a bank (carried over) (last checked 23 September 2026, review due 28 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.