Lifecycle label: approved; effective date not established Status evidence: Chesterfield County data-center project status table as of July 2026, Upper Magnolia Green row Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
google-upper-magnolia-green-site-va
Record type
project
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
Unknown No independently supported figure
No selected county record states critical-IT or other MW. Tract A acreage is described site area, not capacity. The county's 1.755 MGD maximum public water use is water, not IT load.
Location
4201 Moseley Road, VA
County: Chesterfield County
approximate — July 2026 county status-table locator. Case 25SN1038 lists multiple parcels including 4200 Moseley Road and 4201 Mt. Hermon Road.
Physical scale
Physical scale: Case 25SN1038 defines Tract A as approximately 880.23 acres limited to data-center use, inside an overall rezoning of 979.23 acres that also includes Tract B employment uses. Those figures are rezoning-tract area, not developed campus acreage, building count, floor area or IT load. The county status table does not specify a building count.

What the sources support

Chesterfield County's Data Center Project Status table as of July 2026 lists Upper Magnolia Green at 4201 Moseley Road as zoning approved, with the number of buildings not specified. The county page states the Upper Magnolia Green and Watkins Centre sites were rezoned for data-center use in May 2025. Opened Case 25SN1038 is a multi-parcel rezoning whose Tract A is limited to data-center use. These records support an approved project. They do not establish construction, operation, current land title, an operator legal role, or any IT-load figure.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 28 May 2025 · DataCenterData review

google-upper-magnolia-green-site-va → Record

Why Chesterfield Board of Supervisors public hearing date on Case 25SN1038; the county later describes the Upper Magnolia Green site as rezoned for data-center use in May 2025.

Evidence No additional evidence link; see the linked record or claim.

Record history · 2026-07 · DataCenterData review

google-upper-magnolia-green-site-va → Record

Why County status table listed Upper Magnolia Green as zoning approved with the number of buildings not specified.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID google-upper-magnolia-green-site-va and the page are prefilled. Accepted material corrections appear on Changes.