Lifecycle label: construction; effective date not establishedStatus evidence: Chesterfield County data-center project status table as of July 2026, Peanut LLC rowEvidence: Independently source-linkedReuse: Reference only
Facts at a glance
Record ID
google-bermuda-hundred-data-center-campus-va
Record type
campus
Evidence confidence
medium DataCenterData’s confidence in this record’s sourced fields, not in the project
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
Unknown No independently supported figure No selected county record states critical-IT, utility-request, utility-service, generation, gross-facility, company-design or measured-load MW. The county's 6.000 MGD maximum public water use for this row is water, not IT load, and is not published as capacity.
Location
2100 Bermuda Hundred Road, VA County: Chesterfield County Approximate location — July 2026 county status table locator. A 2020 county agreement Exhibit A describes tracts at 2400 and 2700 Bermuda Hundred Road. No selected record reconciles those street numbers.
Physical scale
The county status table lists three buildings under construction. A county newsflash describes a 300-plus-acre Bermuda Hundred site; a 2020 county agreement recital describes approximately 305 acres. Those acreage figures are described site area, not a surveyed current campus boundary, and are not IT load, floor area or white space.
What the sources support
Chesterfield County's Data Center Project Status table as of July 2026 lists Peanut LLC at 2100 Bermuda Hundred Road as under construction with three buildings. The same county page attributes Google's Bermuda Hundred Road property as one of three planned data-center sites with county agreements. A 2025 county newsflash quotes a company spokesperson with mixed groundbreaking language in one paragraph; that mixed sentence is not used as the construction locator. These records support a campus under construction. They do not establish current land title, an operator legal role, a street-number reconciliation among 2100, 2400 and 2700 Bermuda Hundred Road, or any IT-load figure.
Exact location Heading Data Center Project Status as of July 2026; Peanut LLC row (address and status); FAQ paragraphs attributing Google's Bermuda Hundred Road property and the three planned sites
What it supports Peanut LLC row under construction with three buildings at 2100 Bermuda Hundred Road; Google as named agreement party for three planned county data-center sites; not operator, title owner or IT load.
Exact location Paragraph beginning According to company spokesperson Amber Tillman
What it supports 300-plus-acre Bermuda Hundred site described as a planned multiphase data-center campus; mixed groundbreaking language not used as construction status.
Exact location Recital A; Exhibit A Tract I 2400 Bermuda Hundred Road and Tract II 2700 Bermuda Hundred Road
What it supports 2020 Peanut LLC agreement party and acreage recital; Exhibit A street numbers that conflict with the 2100 status-table locator; not current title or construction status.
Why Chesterfield County and Peanut LLC signed a tax-rate and water-capacity agreement reciting an evaluation of acquiring about 305 acres; the recitals do not prove a later closing or current construction.
Evidence No additional evidence link; see the linked record or claim.
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Reviewed record google-bermuda-hundred-data-center-campus-va
Campus. Independently reviewed record. Values are shown with their recorded basis.
Location and precision
Shown above in Facts at a glance.
Lifecycle
Recorded status: construction
Area, acreage and buildings
Shown above in Facts at a glance.
Power capacity
Capacity — Not yet recorded here. Recorded reason: No selected county record states critical-IT, utility-request, utility-service, generation, gross-facility, company-design or measured-load MW. The county's 6.000 MGD maximum public water use for this row is water, not IT load, and is not published as capacity.
Not yet recorded here: Roles · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
Suggest a correction → Record ID google-bermuda-hundred-data-center-campus-va and the page are prefilled. Accepted material corrections appear on Changes.
construction Status basis: Chesterfield County's Data Center Project Status table as of July 2026 lists Peanut LLC at 2100 Bermuda Hundred Road as under construction with three buildings. The same county page attributes Google's Bermuda Hundred Road property as one of three planned data-center sites with county agreements. A 2025 county newsflash quotes a company spokesperson with mixed groundbreaking language in one paragraph; that mixed sentence is not used as the construction locator. These records support a campus under construction. They do not establish current land title, an operator legal role, a street-number reconciliation among 2100, 2400 and 2700 Bermuda Hundred Road, or any IT-load figure.
Quote-bound facts: each shows the value, the source address, the capture hash (first 12 characters; the full SHA-256 is in the page markup) and the capture date. The source's exact wording stays in the capture record and is not republished here; the capture hash binds it.
No quote-bound fact with a hashed capture is recorded for this facility.
Other values by layer
Field
Value
Layer and basis
Date
Source
physical scale
The county status table lists three buildings under construction. A county newsflash describes a 300-plus-acre Bermuda Hundred site; a 2020 county agreement recital describes approximately 305 acres. Those acreage figures are described site area, not a surveyed current campus boundary, and are not IT load, floor area or white space.
Reviewed (DCD) · reviewed record
Latest source retrieval/capture date date not stated
These citations belong to the linked reviewed records. They do not establish every figure or present-day operating status. Publication and retrieval dates are shown separately; an unstated date remains unknown.
33 fields in the shared profile are not established for this record. Each states why; missing information does not mean zero or absence.
Operator · not recorded for this field in the register
City · not recorded for this field in the register
Postal code · not recorded for this field in the register
Coordinates · not recorded for this field in the register
Map location precision · not recorded for this field in the register
Provider-reported status · not recorded for this field in the register
Operator-stated status · not recorded for this field in the register
Status in public records · not recorded for this field in the register
Critical IT capacity (MW) · not recorded for this field in the register
Utility capacity (MW) · not recorded for this field in the register
Requested utility capacity (MW) · not recorded for this field in the register
Reported total power (MW) · not recorded for this field in the register
Generation capacity (MW) · not recorded for this field in the register
Company-announced design capacity (MW) · not recorded for this field in the register
Provider-reported capacity (MW) · not recorded for this field in the register
Floor area (sq ft) · not recorded for this field in the register
Data hall or IT floor area (sq ft) · not recorded for this field in the register
Site area · not recorded for this field in the register
Cooling redundancy · not recorded for this field in the register
UPS redundancy · not recorded for this field in the register
Backup generator redundancy · not recorded for this field in the register
Tier design rating · not recorded for this field in the register
Cooling technology · not recorded for this field in the register
Opening year or expected opening year · not recorded for this field in the register
Network presence · not recorded for this field in the register
Service · not recorded for this field in the register
Certification or compliance claims · not recorded for this field in the register
Rack density · not recorded for this field in the register
Space or power availability · not recorded for this field in the register
Specifications and facility pages · not recorded for this field in the register
Business contact · not recorded for this field in the register
Public registration · not recorded for this field in the register
Fact supported by a source quotation · not recorded for this field in the register
Jurisdiction and policy actions
Policy actions are matched to this facility by jurisdiction (state, county, municipality or utility), never by the facility's name. A match means the action covers the place, not that it names or affects this facility.
We plan to re-check this facility every 90 days because it has a reviewed record whose status may still change. Next check due . The last-checked date is the newest evidence date among this facility's sources. Dates are measured against the newest input date, , not the day this page was built.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
For each populated field, the origin of the value shown on this page and the terms it carries. Values that are not redistributable may be read and cited here but are not relicensed.
Field
Supplied by
Origin
License
Attribution
Redistributable
current_name
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
aliases[0]
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
location.street
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
location.county
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
location.street_key
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
location.state
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
location.cbsa
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd original
CC-BY-4.0
DataCenterData
yes
location.cbsa_name
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd original
CC-BY-4.0
DataCenterData
yes
status_by_layer[0]
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
lifecycle_status
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
status_basis
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va
dcd reference only
reference only
DataCenterData
no
layer_values[0]
DataCenterData reviewed record google-bermuda-hundred-data-center-campus-va