Licensed discovery layer · Compute Atlas 1.34.1

Wyoming data centers

17 listings from a licensed directory. They are not independently verified and are not a statewide census.

17 licensed rows15 eligible organization labels9 city/state labelsLicensed edition dated 14 October 2026

Wyoming map

Reported locations in Wyoming

17 licensed rows · 9 source localities · 6 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 26 data-center source listings here across licensed, operator and DataCenterData layers (18 with a map point); 27 with government registry records. Source listings are not distinct sites.2 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 6 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Two layers, two jobs. These licensed rows have not been independently verified by DataCenterData and are not a census. Reviewed evidence remains separate.

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

3 operator-listed sites (mixed units; not added to licensed rows) in Wyoming →

Separate layer

Listed in the federal EPA registry

Street addresses where the U.S. EPA facility registry lists a registration whose name says data center or whose registrant is a known operator under industry code 518210, and that are not rows in the licensed directory or operator-listed sites. Each is one or more registry records, not a building count, and is never added to the counts above.

1 address in the U.S. EPA facility registry (registry records, not buildings; not added to licensed rows) in Wyoming →

Browse by city

9 reported localities

City labels are reproduced as published. They are not inferred metro areas.

Showing 1–17 of 17 Wyoming licensed source rows.

  1. source-reported operationalReported operational 2.5 MWSource updated 2 September 2026approximate location
  2. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
  3. source-reported operationalCapacity not statedSource updated 19 August 2026approximate location
  4. source-reported proposedCapacity not statedSource updated 14 September 2026approximate location
  5. source-reported operationalReported planned 8 MWReported operational 5 MWSource updated 2 September 2026approximate location
  6. source-reported under constructionReported planned 109 MWSource updated 19 August 2026approximate location
  7. source-reported permittedCapacity not statedSource updated 21 September 2026approximate location
  8. source-reported operationalCapacity not statedSource updated 2 September 2026exact location (provider label)
  9. source-reported under constructionReported planned 2,700 MWSource updated 2 September 2026exact location (provider label)
  10. source-reported permittedReported planned 1,250 MWSource updated 14 September 2026approximate location
  11. source-reported proposedReported planned 1,500 MWSource updated 14 September 2026approximate location
  12. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
  13. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
  14. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
  15. source-reported under constructionReported planned 302 MWSource updated 14 September 2026approximate location
  16. source-reported permittedCapacity not statedSource updated 14 September 2026approximate location
  17. source-reported proposedCapacity not statedSource updated 2 September 2026approximate location
Source and reuse

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. DataCenterData normalized selected fields and added stable IDs. Download the attributed JSON → Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).