This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Truss Energy Carpenter Data Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Truss Energy
- Address and locality
- Carpenter · Laramie County · Wyoming
- Official metro area
- Cheyenne, WY
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 2 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001502
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 540 acres (source-reported; parcel boundary not established)
- Announced
- May 2026
What the source record says
Very early stage: as of 2026-05-18 no application had been submitted to Laramie County and Truss Energy did not respond to press inquiries. About one mile west of Carpenter, an unincorporated community roughly 35 miles east of Cheyenne; coordinates are an approximate geocode of Carpenter. No megawatt, investment or job figures have been published. Single-source, and it may not proceed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-05-18 · source-reported proposed
Laramie County planning staff confirmed a 540-acre data center concept about one mile west of Carpenter; the company was doing due diligence and no application had been submitted.
Sources and attribution
- Two More Data Centers Possible As Laramie County Planners OK Massive Man Camp · Cowboy State Daily
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID truss-energy-carpenter-wy. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001502
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Carpenter, WY · Laramie (Approximate location)
Roles
- Operator: Truss Energy
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: May 2026
Provider-reported announcement date.
- Status history: 2026-05-18 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 540 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-02
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.