Prometheus Hyperscale Falls Ranch Data Center Campus

source-reported proposed

Prometheus Hyperscale

Glenrock · Converse County · Wyoming

Reported planned 1,500 MWSource updated 14 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Prometheus Hyperscale Falls Ranch Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Prometheus Hyperscale
Address and locality
Glenrock · Converse County · Wyoming
Official metro area
Casper, WY
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
14 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001178

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
PacifiCorpUtility as named by the provider.
Power source
MixedProvider label.
On-site generation
1,500 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Cooling
Closed-loopProvider label.
Land area
940 acres (source-reported; parcel boundary not established)
Announced investment
$500 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
150 permanent · 3,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
October 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

Provider notes

Energy. On-site generation with a minimum $500M initial investment; carbon-negative operations via partnership with Spiritus and Casper Carbon Capture, combining natural gas with proprietary geothermal systems and carbon capture.

Water. Developer describes proprietary aquifer, non-consumptive water-cooling systems for the high-density compute halls.

Community. Neighboring landowners mounted "fierce pushback" over noise, heat, fumes, and traffic concerns, prompting developers to weigh relocating to an alternate parcel as of July 2026 (no denial or lawsuit yet).

What the source record says

1.5GW campus proposed on the Falls Ranch property spanning the Natrona/Converse county line near I-25, roughly 10 miles east of Casper. Site plan still in flux as of July 2026, with developers weighing an alternate parcel south of I-25; targeted operational by 2028.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID prometheus-hyperscale-casper-wy. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001178

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Glenrock, WY · Converse (Approximate location)

Roles

  • Operator: Prometheus Hyperscale

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: October 2025

    Provider-reported announcement date.

Area, acreage and buildings

  • Land area: 940 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: PacifiCorp

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

  • On-site generation: 1,500 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $500 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 150 permanent · 3,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Wyoming Data Center Sales Tax Exemption · Wyoming · 2022

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →